TMA manufactures 37-in. high definition LCD televisions in two separate locations, Locations I and II. The output at Location I is at most 6000 televisions/month, whereas the output at Location II is at most 5000 televisions/month. TMA is the main supplier of televisions to the Pulsar Corporation, its holding company, which has priority in having all its requirements met. In a certain month, Pulsar placed orders for 3000 and 4000 televisions to be shipped to two of its factories located in City A and City B, respectively. The shipping costs (in dollars) per television from the two TMA plants to the two Pulsar factories are as follows. From TMA Location I Location II (x, y) = TMA will ship x televisions from Location I to city A and y televisions from Location I to city 8. Find a shipping schedule that meets the requirements of both companies while keeping costs to a minimum. To Pulsar Factories City A City B $6 $4 $8 $11 What is the minimum cost? $

Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
icon
Related questions
Question
TMA manufactures 37-in. high definition LCD televisions in two separate locations, Locations I and II. The output at Location I is at most 6000 televisions/month, whereas the output at Location II is at
most 5000 televisions/month. TMA is the main supplier of televisions to the Pulsar Corporation, its holding company, which has priority in having all its requirements met. In a certain month, Pulsar
placed orders for 3000 and 4000 televisions to be shipped to two of its factories located in City A and City B, respectively. The shipping costs (in dollars) per television from the two TMA plants to the
two Pulsar factories are as follows.
From TMA
Location I
Location II,
To Pulsar Factories
City A
$6
City B
$4
$8
$11
TMA will ship x televisions from Location I to city A and y televisions from Location I to city B. Find a shipping schedule that meets the requirements of both companies while keeping costs to a
minimum.
(x, y) =
What is the minimum cost?
Transcribed Image Text:TMA manufactures 37-in. high definition LCD televisions in two separate locations, Locations I and II. The output at Location I is at most 6000 televisions/month, whereas the output at Location II is at most 5000 televisions/month. TMA is the main supplier of televisions to the Pulsar Corporation, its holding company, which has priority in having all its requirements met. In a certain month, Pulsar placed orders for 3000 and 4000 televisions to be shipped to two of its factories located in City A and City B, respectively. The shipping costs (in dollars) per television from the two TMA plants to the two Pulsar factories are as follows. From TMA Location I Location II, To Pulsar Factories City A $6 City B $4 $8 $11 TMA will ship x televisions from Location I to city A and y televisions from Location I to city B. Find a shipping schedule that meets the requirements of both companies while keeping costs to a minimum. (x, y) = What is the minimum cost?
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps

Blurred answer
Similar questions
Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Basic Technical Mathematics
Basic Technical Mathematics
Advanced Math
ISBN:
9780134437705
Author:
Washington
Publisher:
PEARSON
Topology
Topology
Advanced Math
ISBN:
9780134689517
Author:
Munkres, James R.
Publisher:
Pearson,