1: When a wood stud wall is placed on concrete or 2: Fire Protection /Fire Rating of Door & Windows may masonry, the bottom plate must be a: o 2x4 wood o Metal runner o Stainless steel o Naturally durable wood be % lower than wall assembly: 75% 50% 100% o 0% 3: In Building Foundation Moisture control a Damp 4: How many plies (layers) of felt are in a Built-up Proofing layer: o Filters water vapors o Hold back standing water o Prevents the transmission of water vapor o Collects water vapors roof membrane. Each layer is separated by a mopping of bitumen. o Three to five plies o One to two plies Six to eight plies o Over eight plies

Construction Materials, Methods and Techniques (MindTap Course List)
4th Edition
ISBN:9781305086272
Author:William P. Spence, Eva Kultermann
Publisher:William P. Spence, Eva Kultermann
Chapter18: Wood, Plastics, And Composites
Section: Chapter Questions
Problem 20RQ
icon
Related questions
Question
show all answer. Thanks
1: When a wood stud wall is placed on concrete or | 2: Fire Protection /Fire Rating of Door & Windows may
masonry, the bottom plate must be a:
2x4 wood
Metal runner
Stainless steel
be
75%
50%
100%
0%
% lower than wall assembly:
Naturally durable wood
3: In Building Foundation Moisture control a Damp 4: How many plies (layers) of felt are in a Built-up
Proofing layer:
o Filters water vapors
Hold back standing water
Prevents the transmission of water vapor
Collects water vapors
roof membrane. Each layer is separated by a
mopping of bitumen.
Three to five plies
One to two plies
Six to eight plies
Over eight plies
o o o o
Transcribed Image Text:show all answer. Thanks 1: When a wood stud wall is placed on concrete or | 2: Fire Protection /Fire Rating of Door & Windows may masonry, the bottom plate must be a: 2x4 wood Metal runner Stainless steel be 75% 50% 100% 0% % lower than wall assembly: Naturally durable wood 3: In Building Foundation Moisture control a Damp 4: How many plies (layers) of felt are in a Built-up Proofing layer: o Filters water vapors Hold back standing water Prevents the transmission of water vapor Collects water vapors roof membrane. Each layer is separated by a mopping of bitumen. Three to five plies One to two plies Six to eight plies Over eight plies o o o o
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Asphalt binders and mixtures
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Construction Materials, Methods and Techniques (M…
Construction Materials, Methods and Techniques (M…
Civil Engineering
ISBN:
9781305086272
Author:
William P. Spence, Eva Kultermann
Publisher:
Cengage Learning