1 Assign indirect costs to products or services using activity based costing. Note: Use cell A2 from the given information to complete this question. Activity Cost Pool Material Handling Machine Set-Ups Engineering Support Power and Space Total overhead cost Activity Overhead Cost Cost Driver 5,000 $ 300,000 $ 210,000 $ 710,000 Material moves Set-ups Engineering hours 20,000 square feet. Activity Rate per move per set-up 12.50 per hour per square feet Economy Model Activity Requirements by Product Line Deluxe Activity Model Proportion (%) 2,000 300 2,000 Activity Proportion (%) 20% 50% 3,000 900

FINANCIAL ACCOUNTING
10th Edition
ISBN:9781259964947
Author:Libby
Publisher:Libby
Chapter1: Financial Statements And Business Decisions
Section: Chapter Questions
Problem 1Q
icon
Related questions
Question
Please give answers in excel form. B2-B1 etc.
17 Use formulas to assign overhead to each product using both activity rates and activity proportions (%).
18
19 Create if/then statements to verify that the two methods produce the same results.
20
Note: Use cell A2 from the given information to complete this question.
21
22
23 Activity Cost Pool
24 Material Handling
25 Machine Set-Ups
26 Engineering Support
27 Power and Space
28 Total Overhead Cost
29
30
31
4
A Graded Worl
Overhead Assigned Using Activity Rates
Economy
Deluxe
Total
3...
+
Overhead Assigned Using Activity Proportions
(%)
Deluxe
Economy
Total
Verification: Create if/then statements
to determine if the two methods
produce identical results by indicating
"pass" or "fail"
Economy Deluxe
pass
pass
pass
pass
pass
pass
pass
pass
pass
pass
Total
pass
pass
pass
pass
pass
Transcribed Image Text:17 Use formulas to assign overhead to each product using both activity rates and activity proportions (%). 18 19 Create if/then statements to verify that the two methods produce the same results. 20 Note: Use cell A2 from the given information to complete this question. 21 22 23 Activity Cost Pool 24 Material Handling 25 Machine Set-Ups 26 Engineering Support 27 Power and Space 28 Total Overhead Cost 29 30 31 4 A Graded Worl Overhead Assigned Using Activity Rates Economy Deluxe Total 3... + Overhead Assigned Using Activity Proportions (%) Deluxe Economy Total Verification: Create if/then statements to determine if the two methods produce identical results by indicating "pass" or "fail" Economy Deluxe pass pass pass pass pass pass pass pass pass pass Total pass pass pass pass pass
1
Sundial Company has assigned $710,000 in total overhead cost to four different activity cost pools. The activity requirements for its two
2 products lines, Economy and Deluxe, are shown below.
3
Input formulas to solve for the various unknowns in the table below. The formulas may vary for each cost pool depending on what items
4 are known and unknown.
+
5
6 1
6789
Note: Use cell A2 from the given information to complete this question.
10 Activity Cost Pool
11 Material Handling
12 Machine Set-Ups
13 Engineering Support
14
Power and Space
15 Total overhead cost
+/
Assign indirect costs to products or services using activity based costing.
4
Activity
Overhead Cost Cost Driver
5,000
$ 300,000
$
210,000
$ 710,000
Activity
Rate
Material moves
per move
per set-up
Set-ups
Engineering hours $12.50 per hour
20,000 square feet.
per square feet
Economy
Model
Activity Requirements by Product Line
Activity
Deluxe
Proportion (%) Model
3,000
900
2,000
300
2,000
20%
50%
Activity
Proportion (%)
Transcribed Image Text:1 Sundial Company has assigned $710,000 in total overhead cost to four different activity cost pools. The activity requirements for its two 2 products lines, Economy and Deluxe, are shown below. 3 Input formulas to solve for the various unknowns in the table below. The formulas may vary for each cost pool depending on what items 4 are known and unknown. + 5 6 1 6789 Note: Use cell A2 from the given information to complete this question. 10 Activity Cost Pool 11 Material Handling 12 Machine Set-Ups 13 Engineering Support 14 Power and Space 15 Total overhead cost +/ Assign indirect costs to products or services using activity based costing. 4 Activity Overhead Cost Cost Driver 5,000 $ 300,000 $ 210,000 $ 710,000 Activity Rate Material moves per move per set-up Set-ups Engineering hours $12.50 per hour 20,000 square feet. per square feet Economy Model Activity Requirements by Product Line Activity Deluxe Proportion (%) Model 3,000 900 2,000 300 2,000 20% 50% Activity Proportion (%)
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Cost classification
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, accounting and related others by exploring similar questions and additional content below.
Recommended textbooks for you
FINANCIAL ACCOUNTING
FINANCIAL ACCOUNTING
Accounting
ISBN:
9781259964947
Author:
Libby
Publisher:
MCG
Accounting
Accounting
Accounting
ISBN:
9781337272094
Author:
WARREN, Carl S., Reeve, James M., Duchac, Jonathan E.
Publisher:
Cengage Learning,
Accounting Information Systems
Accounting Information Systems
Accounting
ISBN:
9781337619202
Author:
Hall, James A.
Publisher:
Cengage Learning,
Horngren's Cost Accounting: A Managerial Emphasis…
Horngren's Cost Accounting: A Managerial Emphasis…
Accounting
ISBN:
9780134475585
Author:
Srikant M. Datar, Madhav V. Rajan
Publisher:
PEARSON
Intermediate Accounting
Intermediate Accounting
Accounting
ISBN:
9781259722660
Author:
J. David Spiceland, Mark W. Nelson, Wayne M Thomas
Publisher:
McGraw-Hill Education
Financial and Managerial Accounting
Financial and Managerial Accounting
Accounting
ISBN:
9781259726705
Author:
John J Wild, Ken W. Shaw, Barbara Chiappetta Fundamental Accounting Principles
Publisher:
McGraw-Hill Education