. A local picnic table manufacturer has budgeted these overhead costs - ERROR: "Handling materials" is $33,350 - (note their order as you will use the same order down below): Purchasing $70,000 Handing materials 33,333 Machine setups 70,500 Inspections 25,500 Utilities 45,000 They are considering adapting ABC costing and have estimated the cost drivers for each pool as shown (again, note their order): Cost Driver Activity Orders 700 Material moves 1,334 Machine setups 15,000 Number of inspections 5,000 Square feet 180,000 Recent success has yielded an order for 1,000 tables. Assume direct labor costs per hour of $20. Determine how much the job would cost given the following activities (once more, note their order for the last worksheet): Activity Order (units) 1,000 Direct materials 112,700 Machine hours 15,200 Direct labor hours 5,300 Number of purchase orders 60 Number of material moves 800 Number of machine setups 100 Number of inspections 450 Number of square feet occupied 8,000 Using the following cost driver terms, complete the two worksheets below to: Number of material moves Direct labor Manufacturing overhead Number of purchase orders Number of machine setups Number of inspections Direct materials Square feet occupied PLEASE NOTE: For activity levels, use commas as needed (i.e. 1,234). Activity rates are rounded to two decimal places and shown with "$" and commas as needed (i.e. $1,234.56). All other dollar amounts are rounded to whole dollars and shown with "$" and commas as needed (i.e. $12,345). (1) calculate the overhead assigned rate (note their order from above): Overhead Cost Items Estimated Overhead Cost Driver Activity Levels Activity Rate Purchasing $70,000 ? ? ? Handling materials $33,350 ? ? ? Machine setups $70,500 ? ? ? Inspections $25,500 ? ? ? Utilities $45,000 ? ? ? (2) calculate the total order cost (again, note their order from above): Activity Cost Drivers Activity Levels Activity Rate Assigned Costs ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? Total Order Cost ?
2. A local picnic table manufacturer has budgeted these
Purchasing $70,000
Handing materials 33,333
Machine setups 70,500
Inspections 25,500
Utilities 45,000
Cost Driver Activity
Orders 700
Material moves 1,334
Machine setups 15,000
Number of inspections 5,000
Square feet 180,000
Recent success has yielded an order for 1,000 tables. Assume direct labor costs per hour of $20. Determine how much the
Activity
Order (units) 1,000
Direct materials 112,700
Machine hours 15,200
Direct labor hours 5,300
Number of purchase orders 60
Number of material moves 800
Number of machine setups 100
Number of inspections 450
Number of square feet occupied 8,000
Using the following cost driver terms, complete the two worksheets below to:
Number of material moves | Direct labor | Manufacturing overhead | Number of purchase orders |
Number of machine setups | Number of inspections | Direct materials | Square feet occupied |
PLEASE NOTE: For activity levels, use commas as needed (i.e. 1,234). Activity rates are rounded to two decimal places and shown with "$" and commas as needed (i.e. $1,234.56). All other dollar amounts are rounded to whole dollars and shown with "$" and commas as needed (i.e. $12,345).
(1) calculate the overhead assigned rate (note their order from above):
Overhead Cost Items | Estimated Overhead | Cost Driver | Activity Levels | Activity Rate |
Purchasing |
$70,000 | ? | ? | ? |
Handling materials | $33,350 | ? | ? | ? |
Machine setups |
$70,500 | ? | ? | ? |
Inspections |
$25,500 | ? | ? | ? |
Utilities |
$45,000 | ? | ? | ? |
(2) calculate the total order cost (again, note their order from above):
Activity Cost Drivers | Activity Levels | Activity Rate | Assigned Costs |
? | ? | ||
? | ? | ||
? | ? | ? | ? |
? | ? | ? | ? |
? | ? | ? | ? |
? | ? | ? | ? |
? | ? | ? | ? |
Total Order Cost | ? |
Trending now
This is a popular solution!
Step by step
Solved in 3 steps
(1) calculate the
Overhead Cost Items | Estimated Overhead | Cost Driver | Activity Levels | Activity Rate |
Purchasing |
$70,000 | ? | ? | ? |
Handling materials | $33,350 | ? | ? | ? |
Machine setups |
$70,500 | ? | ? | ? |
Inspections |
$25,500 | ? | ? | ? |
Utilities |
$45,000 | ? | ? | ? |
(2) calculate the total order cost (again, note their order from above):
Activity Cost Drivers | Activity Levels | Activity Rate | Assigned Costs |
? | ? | ||
? | ? | ||
? | ? | ? | ? |
? | ? | ? | ? |
? | ? | ? | ? |
? | ? | ? | ? |
? | ? | ? | ? |
Total Order Cost | ? |