Power Outages and Emergency Backup Generators
White Paper
A guide to Selecting, Choosing, Purchasing and Installing the
appropriate Generator for Emergency Power Backup
Why have a generator for your business?
Power outages are becoming more frequent and are lasting longer. There are two major reasons
for this trend.
First, severe weather patterns such as thunderstorms, hurricanes, flood and ice
storms have increased dramatically over the past few years and are expected to continue at
current or even greater levels for the foreseeable future.
In addition, the demand for electricity is increasing at an unprecedented rate and power
companies are not able to replace aging transmission networks and build new plants fast
enough to keep pace with the growing need.
A generator is a must-have for most enterprise, industrial, and institutional settings. When
incoming utility power fails, the UPS detects the condition and switches to battery backup power
to keep supplying power to protected loads. Meanwhile, the auxiliary generator starts up, and
within 10 to 15 seconds the UPS will begin to receive its power from the generator. In a well-
engineered site, integrating a proportionately sized generator, the protected equipment will never
be affected.
What size to buy?
The right size generator is a function of many inter-dependent factors, even some that might
seem obscure. In fact, so many factors must be taken into account that it’s almost impossible to
create a standard formula. The good news is that Eaton specialists can recommend the optimum
generator for your needs, based on your answers to these questions:
Weighing the Factors
Application and Usage
Which generator will best support my existing UPSs?
Smaller UPSs (50 to 100 kVA) are usually clustered with other equipment to share a much larger
auxiliary generator, say, 500-750 kVA. In this case, the generator is probably integrated with the
building’s electrical system and also supports air conditioning, backup lighting, and other
systems.
Page 2
With larger UPSs and mission-critical environments, the generator will probably be dedicated to
only one UPS.
Wattage & Other Requirements
What size is the load that you need to power?
If the generator is shared among many components, you’ll need to calculate total power
consumption requirements for all loads that will remain up during an outage—as well as those
that are dormant until there is an outage, such as emergency lighting systems. If you’ll be
selectively shedding loads during outages (powering down nonessential equipment), your power
consumption during an outage might actually be far less than for day-to-day operations.
In addition, you’ll need to account for the efficiency losses that are a natural aspect of UPS
operation, as well as the diverse operating characteristics of other equipment being powered by
the generator—large motors, HVAC systems, etc.
How much of the UPS’s rated capacity are you using?
The input characteristics of a UPS can change significantly depending on how much of its rated
loadit is carrying. A generator might not properly regulate its output voltage when serving a lightly
loaded UPS. Is your UPS carrying loads at 80 to 90 percent of its rating, or closer to 15 to 20
percent of its rating? Eaton has designed intelligent input filters that can modify input
characteristics to mitigate this effect, but it still must be taken into consideration.
Do you want UPS batteries to be recharged during or after the outage?
Although the generator may promptly step in to provide substitute power, the UPS batteries would
still be partially discharged from carrying the load during the transition period. If you want to
recharge the batteries while running on generator power, that drain must be factored into the
generator size.
Are you considering a diesel, gasoline, or natural gas generator?
With carburetor and manifold or fuel injected? These variances make a difference in how the
generator responds to step loads (building up gradually to full operation), and how much power
can be generated. Diesel generators, which usually feature fuel injection engines, emit more
power than comparable gasoline or natural gas generators. So if you were leaning toward (or
already have) gasoline or natural gas, the generator would be sized somewhat larger to
compensate.
Do you need a small generator to cover one small UPS?
If you need backup power for a UPS rated at 150 kVA or less, you might want to oversize the
generator by as much as 200 percent, because very small generators often don’t produce enough
kinetic energy to provide smooth operation.
Typically, the generator must be oversized to some degree with respect to the output sizing of the
UPS, to cover all these contingencies and considerations. You can’t size a generator in a 1:1
match to the UPS and expect efficient results. As a general rule of thumb, auxiliary generators will
be sized at about 1.3 to 1.5 times the output rating of the UPS in kW— somewhat higher for
gasoline or gas powered generators. Eaton will be glad to help you select the most appropriate
generator for your specific application.
Page 3
Generator Safety
•
Use the appropriate sized power cords recommended by the manufacturer to carry the
electrical load.
•
Never run cords underneath rugs or carpets where heat could build up or a damaged
cord could go unnoticed.
•
Never connect generators to another power source such as power lines. The back feed
of electricity can be fatal.
•
To avoid the risk of carbon monoxide poisoning, never run a generator in an enclosed
space.
About Eaton
Power Quality Solutions Operations and Powerware® branded products
Eaton is a global leader in electrical control, power distribution, power protection and
industrial automation products and services.
Through its Power Quality Solutions
Operations, Eaton delivers a broad range of infrastructure solutions for your IT systems:
•
UPS products
—Rackmount and freestanding power protection systems for applications
from the simplest desktop to the largest government, healthcare or industrial facilities
•
Enclosures
—Attractive, secure and functional enclosures for data centers, wiring
closets, office environments and warehouse spaces
•
Power distribution
—Rackmount PDUs to streamline the distribution of power
throughout a data center, rack or enclosure.
•
Power reliability
—Generators and advanced battery technologies to provide backup
power, paralleling gear to create redundant UPS configurations, power quality audits to
assess and improve power conditions
•
Services
—Maintenance plans and extended warranties, 24x7 support, remote
monitoring and diagnostic services, turnkey project management and electrical
contracting and system integration—350+ customer support engineers in North America.
For more information about Eaton’s comprehensive Powerware solutions:
800.356.5794
www.Powerware.com
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Questions
How do you determine how much it will cost for electricity per year for the Nissan Leaf
arrow_forward
Questions
1. To increase his speed from 20 km/h to 30 km/h, the cyclist must produce an additional 90 watts of power. Using the graph, determine the increase in power required to increase the speed from 50 km,
What can you conclude about the type of relationship based on this result?
2. What other factors should be considered when determining the amount of power required to cycle at a certain speed?
from 50-60km
arrow_forward
Problem 2.3
The following problem can be solved using the generalized conservation and accounting
principle to determine if a recycling plant is profitable annually.
Operating information:
●
●
The plant operates 9 hours each day, 5 days each week, and 48 weeks each year.
The plant purchases 30 tons of aluminum (at a rate of $0.02/lb) during each operating
week.
The plant has 5 full-time employees who are paid $18 per hour. All employees work
during all of the plant's operating hours.
The plant produces 7 bales of recycled aluminum per day, which it sells for $950 per bale.
[Note: 1 ton = 2000 lb]
Answer the following questions:
(c) In order to determine the plant's annual profitability, would one be interested in studying
the instantaneous rate of change in "stuff" (i.e. rate form) or the total change in "stuff"
over an interval (i.e. finite-time form)?
(d) On a system diagram (hint: think dashed lines!), use labeled arrows to identify each
individual input and output of "stuff".
(e)…
arrow_forward
Problem 2.3
The following problem can be solved using the generalized conservation and accounting
principle to determine if a recycling plant is profitable annually.
Operating information:
●
●
The plant operates 9 hours each day, 5 days each week, and 48 weeks each year.
The plant purchases 30 tons of aluminum (at a rate of $0.02/lb) during each operating
week.
The plant has 5 full-time employees who are paid $18 per hour. All employees work
during all of the plant's operating hours.
The plant produces 7 bales of recycled aluminum per day, which it sells for $950 per bale.
[Note: 1 ton = 2000 lb]
Answer the following questions:
(a) Identify the system (in words).
(b) Identify the "stuff" you are accounting for in this analysis.
(c) In order to determine the plant's annual profitability, would one be interested in studying
the instantaneous rate of change in "stuff" (i.e. rate form) or the total change in "stuff"
over an interval (i.e. finite-time form)?
(d) On a system diagram (hint:…
arrow_forward
C
O
O
n
t
e
n
t
Explore some of the projects described by William
McDonough (Liuzhou City, Ford River Rouge Truck
Plant green roof, Gap San Bruno office, etc).
• What became of them? Consider the gap
between ambition and reality when it comes to
sustainability and sustainable energy
generation. Discuss how this gap relates to the
perspectives given in the other TED talks as
●
well.
Do you agree with the presenters' perspectives
on the future?
• What sustainability factors are they considering
(or not) in their assessment of the future?
arrow_forward
Q1: What are the advantages and challenges of renewable energy resources?
Q2: Discuss potential sources and uses of biomass as an energy source.
arrow_forward
What is the cost of a carbon credit (weighted average price per ton) in 2021?
$4.73
$4.23
$5.60
$6.20
arrow_forward
A supply chain is a series of activities from
supplier to customer that adds value to a
product or service.
True
False
arrow_forward
The from-to chart below indicates the number of loads moved per 8-hr day (above the slash) and the distances in ft (below the slash) between departments in a particular factory. Fork lift trucks are used to transport the materials. They move at an average speed = 275 ft>min (loaded) and 350 ft/min (empty). Load handling time (loading plus unloading) per delivery is 1.5 min and anticipated traffic factor = 0.9. Availability = 95% and worker efficiency = 110%. Determine the number of trucks required under each of the following assumptions: (a) the trucks never travel empty; and (b) the trucks travel empty a distance equal to their loaded distance.
arrow_forward
2.1 You are tasked with planning of maintenance tasks at a water treatment facility. A
critical pump has failed unexpectedly, causing significant downtime. Meanwhile,
another pump of the same type has been operating without any issues. Illustrate using
a diagram the planning process that highlights the difference between a maintenance
task for an asset that has failed and a maintenance task that prevents failure from
occurring. (6)
2.2 You are the working at a power generation plant. Over the past six months, the plant
has experienced inconsistent performance from its critical assets, resulting in
occasional production losses. The maintenance team recently implemented a new
maintenance strategy to address this issue. Indicate the different methods to consider
when assessing the effectiveness of the maintenance strategy. (3)
2.3 At a manufacturing facility, operators are primarily responsible for running production
equipment, while the maintenance team handles all repairs and…
arrow_forward
Compare Celebrity to other cruise lines in terms of sustainability.
arrow_forward
As far as maintenance costs are concerned:
O for high levels of maintenance commitment, breakdown maintenance costs exceed preventive maintenance
costs.
O for low levels of maintenance commitment, preventive maintenance costs exceed breakdown maintenance
costs.
preventive maintenance is always more economical than breakdown maintenance.
breakdown maintenance is always more economical than preventive maintenance when the "full cost of
breakdowns" is taken into consideration.
O for low levels of mairtenance commitment, breakdown maintenance costs exceed preventive maintenance
costs.
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you
Principles of Heat Transfer (Activate Learning wi...
Mechanical Engineering
ISBN:9781305387102
Author:Kreith, Frank; Manglik, Raj M.
Publisher:Cengage Learning
Related Questions
- How do you determine how much it will cost for electricity per year for the Nissan Leafarrow_forwardQuestions 1. To increase his speed from 20 km/h to 30 km/h, the cyclist must produce an additional 90 watts of power. Using the graph, determine the increase in power required to increase the speed from 50 km, What can you conclude about the type of relationship based on this result? 2. What other factors should be considered when determining the amount of power required to cycle at a certain speed? from 50-60kmarrow_forwardProblem 2.3 The following problem can be solved using the generalized conservation and accounting principle to determine if a recycling plant is profitable annually. Operating information: ● ● The plant operates 9 hours each day, 5 days each week, and 48 weeks each year. The plant purchases 30 tons of aluminum (at a rate of $0.02/lb) during each operating week. The plant has 5 full-time employees who are paid $18 per hour. All employees work during all of the plant's operating hours. The plant produces 7 bales of recycled aluminum per day, which it sells for $950 per bale. [Note: 1 ton = 2000 lb] Answer the following questions: (c) In order to determine the plant's annual profitability, would one be interested in studying the instantaneous rate of change in "stuff" (i.e. rate form) or the total change in "stuff" over an interval (i.e. finite-time form)? (d) On a system diagram (hint: think dashed lines!), use labeled arrows to identify each individual input and output of "stuff". (e)…arrow_forward
- Problem 2.3 The following problem can be solved using the generalized conservation and accounting principle to determine if a recycling plant is profitable annually. Operating information: ● ● The plant operates 9 hours each day, 5 days each week, and 48 weeks each year. The plant purchases 30 tons of aluminum (at a rate of $0.02/lb) during each operating week. The plant has 5 full-time employees who are paid $18 per hour. All employees work during all of the plant's operating hours. The plant produces 7 bales of recycled aluminum per day, which it sells for $950 per bale. [Note: 1 ton = 2000 lb] Answer the following questions: (a) Identify the system (in words). (b) Identify the "stuff" you are accounting for in this analysis. (c) In order to determine the plant's annual profitability, would one be interested in studying the instantaneous rate of change in "stuff" (i.e. rate form) or the total change in "stuff" over an interval (i.e. finite-time form)? (d) On a system diagram (hint:…arrow_forwardC O O n t e n t Explore some of the projects described by William McDonough (Liuzhou City, Ford River Rouge Truck Plant green roof, Gap San Bruno office, etc). • What became of them? Consider the gap between ambition and reality when it comes to sustainability and sustainable energy generation. Discuss how this gap relates to the perspectives given in the other TED talks as ● well. Do you agree with the presenters' perspectives on the future? • What sustainability factors are they considering (or not) in their assessment of the future?arrow_forwardQ1: What are the advantages and challenges of renewable energy resources? Q2: Discuss potential sources and uses of biomass as an energy source.arrow_forward
- What is the cost of a carbon credit (weighted average price per ton) in 2021? $4.73 $4.23 $5.60 $6.20arrow_forwardA supply chain is a series of activities from supplier to customer that adds value to a product or service. True Falsearrow_forwardThe from-to chart below indicates the number of loads moved per 8-hr day (above the slash) and the distances in ft (below the slash) between departments in a particular factory. Fork lift trucks are used to transport the materials. They move at an average speed = 275 ft>min (loaded) and 350 ft/min (empty). Load handling time (loading plus unloading) per delivery is 1.5 min and anticipated traffic factor = 0.9. Availability = 95% and worker efficiency = 110%. Determine the number of trucks required under each of the following assumptions: (a) the trucks never travel empty; and (b) the trucks travel empty a distance equal to their loaded distance.arrow_forward
- 2.1 You are tasked with planning of maintenance tasks at a water treatment facility. A critical pump has failed unexpectedly, causing significant downtime. Meanwhile, another pump of the same type has been operating without any issues. Illustrate using a diagram the planning process that highlights the difference between a maintenance task for an asset that has failed and a maintenance task that prevents failure from occurring. (6) 2.2 You are the working at a power generation plant. Over the past six months, the plant has experienced inconsistent performance from its critical assets, resulting in occasional production losses. The maintenance team recently implemented a new maintenance strategy to address this issue. Indicate the different methods to consider when assessing the effectiveness of the maintenance strategy. (3) 2.3 At a manufacturing facility, operators are primarily responsible for running production equipment, while the maintenance team handles all repairs and…arrow_forwardCompare Celebrity to other cruise lines in terms of sustainability.arrow_forwardAs far as maintenance costs are concerned: O for high levels of maintenance commitment, breakdown maintenance costs exceed preventive maintenance costs. O for low levels of maintenance commitment, preventive maintenance costs exceed breakdown maintenance costs. preventive maintenance is always more economical than breakdown maintenance. breakdown maintenance is always more economical than preventive maintenance when the "full cost of breakdowns" is taken into consideration. O for low levels of mairtenance commitment, breakdown maintenance costs exceed preventive maintenance costs.arrow_forward
arrow_back_ios
arrow_forward_ios
Recommended textbooks for you
- Principles of Heat Transfer (Activate Learning wi...Mechanical EngineeringISBN:9781305387102Author:Kreith, Frank; Manglik, Raj M.Publisher:Cengage Learning
Principles of Heat Transfer (Activate Learning wi...
Mechanical Engineering
ISBN:9781305387102
Author:Kreith, Frank; Manglik, Raj M.
Publisher:Cengage Learning