4-3 Assignment: Project Management Strategies
Nicole Sheppard
QSO 321 - People, Planet, and Profit
Southern New Hampshire University
Mohamed Elseifi
June 2, 2024
Project Charter for Workflow Improvement
The Project Charter for Workflow Improvement is a comprehensive document that outlines the scope, objectives, and deliverables of the project. The project aims to improve the workflow process at one of NationaliTeas' tea factories to make it more efficient and sustainable. The project charter provides a clear understanding of the project's requirements, stakeholders, and timelines.
Process Workflow for Tea Production
The Process Workflow for Tea Production is a detailed graphic that illustrates the steps involved in picking, processing, and packaging tea. The workflow process is divided into three stages: Farm, Processing, and Packaging and Shipping. The process flowchart provides a visual representation of the workflow process, allowing for easy identification of inefficiencies and areas for improvement.
Lean Manufacturing Evaluation
Based on the principles of lean manufacturing, I recommend removing the following four steps from the process flowchart to improve efficiency and sustainability:
Step 1: "Workers pick usable tea leaves from the field" - This step is not value-added as it does not add any significant value to the production process. The picked tea leaves are weighed and grouped into 50 kg bags, which can be automated using a machine that can accurately weigh and package the tea leaves. This step can be eliminated, reducing labor costs and increasing efficiency.
Step 2: "Tea leaves are withered on pans" - This step is not necessary as it does not add any significant value to the production process. The tea leaves can be dried directly without withering, reducing energy consumption and improving sustainability. The withering process also adds unnecessary handling and processing steps, which can increase the risk of contamination and damage to the tea leaves.
Step 3: "Tea leaves are cooled" - This step is not necessary as it does not add any significant value to the production process. The tea leaves can be dried and packaged without cooling, reducing energy consumption and improving sustainability. Cooling also adds unnecessary handling and processing steps, which can increase the risk of contamination and damage to the tea leaves.
Step 4: "Wrapped tea bags are wrapped in paper packets" - This step is unnecessary as it adds unnecessary waste and can be eliminated. The paper packets are not necessary for packaging and
can be replaced with biodegradable or recyclable materials.
Sustainability Evaluation
Based on the principles of sustainability, I recommend removing or changing the following steps to improve environmental sustainability:
Step 1: "Tea leaves are spread across pans" - This step can be replaced with a more efficient drying method that reduces energy consumption. For example, using a solar dryer or a drying tunnel can reduce energy consumption and improve sustainability.
Step 2: "Tea leaves are put through a rolling machine" - This step can be replaced with a more efficient sorting method that reduces waste and energy consumption. For example, using a conveyor belt system or a pneumatic sorting system can reduce waste and improve sustainability.
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Questions
I'm unable to answer the following question?
What is the total cost of crashing the project from its current duration down to 13 weeks?
arrow_forward
List two outputs for each of the Project Risk Management processes (note that the Implement Risk Responses process is not discussed in this chapter)
arrow_forward
The table below contains information about an environmental clean-up project in the township of Hiles. Shorten the project three weeks by finding the minimum-cost schedule.
Assume that project indirect costs and penalty costs are negligible. Identify activities to crash while minimizing the additional crash costs.
Q
Activity
A
B
C
D
E
The cost of shortening of project is $
F
G
H
I
Normal Time
(weeks)
5
7
7
7
1
3
5
4
2
Crash Time
(weeks)
4
4
Activity
A
B
C
D
E
6
4
6
1
3
4
2
2
Cost to Crash
($ per week)
. (Enter your response as a whole number.)
300
50
300
250
200
200
Fill in the table below with the activity times after crashing to show the resulting schedule. (Enter your responses as whole numbers.)
Time according to
schedule (weeks)
Time according to
schedule (weeks)
Immediate Predecessor(s)
Activity
F
G
H
I
None
None
A
A
B
3~~
C, D
D, E
F
G
arrow_forward
Project Scope Management
Khan, (2006) (see below) states that, "Managing the scope of a project is the most important function of a project manager ... Effective scope management of a project also ensures the success of key completion areas, including time, cost, and quality.
Project scope management can be further subdivided into its components which include: project initiation, scope planning, scope definition, scope verification, and scope change control."
Based on your Integrated Project:
Select two of the subdivisions above and discuss the primary issues that could arise from the process.
Your response should begin with a definition of the selected subdivision before detailing the selected process
arrow_forward
please answer all parts of the question within 30 minutes.
arrow_forward
The table below contains information about an environmental clean-up project in the township of Hiles. Shorten the project three weeks by finding the minimum-cost schedule.
Assume that project indirect costs and penalty costs are negligible. Identify activities to crash while minimizing the additional crash costs.
Normal Time
Crash Time
Activity
(weeks)
(weeks)
Cost to Crash
($ per week)
Immediate Predecessor(s)
A
5
4
200
B
9
8
300
None
None
C
4
2
200
A
4
2
250
A
E
3
3
B
F
3
3
C, D
G
3
1
150
D, E
6
4
350
F
G
7
4
Fill in the table below with the activity times after crashing to show the resulting schedule. (Enter your responses as whole numbers.)
Activity
A
Time according to
schedule (weeks)
Activity
Time according to
schedule (weeks)
F
G
B
C
D
E
arrow_forward
Roger Ginde is developing a program in supply chain management certification for managers. Ginde has listed a number of activities that must be completed before a training program of this nature could be conducted. The activities, immediate predecessors, and times appear in the accompanying table:
a. the critical activities for the leadership training program development project are: _____
b. the project length for the leadership training program development project= __ days.
c. Slack time for each of the activities is:
Activity: Slack time:
A ______
B ______
C ______
D ______
E ______
F ______
G ______
arrow_forward
The table below contains information about an environmental clean-up project in the township of Hiles. Shorten the project three weeks by finding
the minimum-cost schedule. Assume that project indirect costs and penalty costs are negligible. Identify activities to crash while minimizing the additional
crash costs.
Normal Time
Activity
(weeks)
Crash Time
(weeks)
Cost to Crash
($ per week)
Immediate Predecessor(s)
59
5
4
4
82233-6
3337
ABCDEFGH -
4
200
None
300
None
200
A
250
A
B
C, D
1
150
D, E
350
F
G
4
4
Fill in the table below with the activity times after crashing to show the resulting schedule. (Enter your responses as whole numbers.)
Time according to
schedule (weeks)
3
1
Activity
Time according to
schedule (weeks)
Activity
A
4
F
B
8
G
C
3
H
6
D
3
4
E
3
The cost of shortening of project is $ ☐. (Enter your response as a whole number.)
arrow_forward
Good day may I have some help with part D and E in the attached pic
arrow_forward
Management & Science University (MSU) have appointed you as a project manager to conduct a Joint Application Design (JAD) session with members from various departments. As a project manager, you are required to develop a specific schedule for the tasks listed below. The estimated task duration for each shown in parentheses.
First, you must contact and brief the participants and explain their responsibilities (1 day). Then you must obtain approval from their department managers (3 days).
After you have obtained the approval, you can begin the two tasks where you can prepare the agenda for the JAD session (7 days) and arrange the meeting room (2 days)
When the agenda is ready, you can start two more concurrent tasks which are preparing the information packets (4 days) and to create visual aids (8 days).
When the meeting room is arranged and information packets are ready, you can send out an email to all participants (1 day).
Finally, after the e-mail is sent to participants and the…
arrow_forward
How can a business analyst communicate requirements (and associated models) for a project in project management.
arrow_forward
Roger Ginde is developing a program in supply chain management certification for managers. Ginde has listed a number of activities that must be completed before a training program of this nature could be conducted. The activities, immediate predecessors, and times appear in
the accompanying table:
This exercise contains only parts b, c, and d.
b) The critical activities for the leadership training program development project are
c) The project length for the leadership training program development project = ☐ days.
d) Slack time for each of the activities is:
Activity Immediate Predecessor(s) Time (days)
A
4
B
7
2
B
10
A, D
с
3
5
E, F
12
Activity
A
Slack Time
B
с
D
E
F
G
arrow_forward
The table below contains information about an environmental clean-up project in the township of Hiles. Shorten the project three weeks by finding the minimum-cost schedule. Assume that project indirect costs
and penalty costs are negligible. Identify activities to crash while minimizing the additional crash costs
Activity
A
B
С
D
E
F
G
H
Normal Time
(weeks)
5
9
4
4
3
3
Activity
A
B
с
D
Crash Time
(weeks)
4
8
2
2
3
3
00000
6
Cost to Crash
(5 per week)
250
350
881 18889
G
250
300
200
Fill in the table below with the activity times after crashing to show the resulting schedule. (Enter your responses as whole numbers)
Time according to
schedule (weeks)
400
Activity
F
Immediate Predecessor(s)
None
None
A
A
B
C.D
D, E
F
G
Time according to
schedule (weeks)
arrow_forward
Please solve my Problem as Soon as possible. Thank You!
arrow_forward
The role of Project Management in Waterfall Methodology.
arrow_forward
I need solve this question in project manager
arrow_forward
You may need to use the appropriate technology to answer this question.
A project consists of five activities as shown in the following table.
Activity
Floor sanding
Floor buffing
Paint mixing
Wall painting
Ceiling painting
Start
Optimistic Time (hr) Most Probable Time (hr)
Start
Floor
Buffing
Paint
Mixing
Naturally, paint mixing precedes the painting activities. Also,
(a) Construct the PERT/CPM network for this problem.
Floor
Sanding
4
Paint
Mixing
4
0.5
3
3
Paint
Wall
Paint
Ceiling
Paint
Ceiling
Paint
Wall
5
5
1
4
7.5
Floor
Sanding
Pessimistic Time (hr)
Floor
Buffing
Finish
6
Finish
6
ceiling painting and floor sanding must be dor
1.5
11
9
i
Start
Start
prior to floor buffing.
Floor
Sanding
Paint
Mixing
Floor
Buffing
Paint
Mixing
Paint
Ceiling
Paint
Wall
Paint
Wall
Paint
Ceiling
Floor
Buffing
Floor
Sanding
Finish
Finish
arrow_forward
The following is a table of activities associated with a project at Rafay Ishfaq's software firm in Chicago, their durations, what activities each must precede and the crash cost to reduce
duration per week:
Activity Duration (weeks) Precedes Crash Cost/Week
A (start)
B
с
E
F (end)
2
2
5
2
3
Activity
B. C
E
F
F
A
Suppose that Rafay is only given 7 weeks (instead of 10) to complete the project. By how many weeks should each activity be crashed in order to meet the deadline? Assume that you
can crash an activity down to 0 weeks duration,
Each Activity
Should be Reduced
BY
(weeks)
$380
$110
week(s)
$200
$160
$450
arrow_forward
There are 11 project selection methods which are: Benefit measurement methodsBenefit/cost ratioEconomic modelScoring modelPayback periodNet present valueDiscounted cash flowInternal rate of returnOpportunity costConstrained optimization methodsNon-financial considerations.
Which one of these techniques or methods are used in construction projects for the benefit of citizens?
arrow_forward
Emzansi Engineers Ltd installs network routers. The project manager Mr Abelanag Senooane has been concerned with the amount of time (weeks) it has been taking to complete several recent jobs. He is therefore determined to implement new and productive resource management techniques. Using information provided in Table 1, advise the project manager on the estimated time that the project will be completed and on the activities that need to be prioritised.
arrow_forward
Widgetco is making a prototype of a new product. The productconsists of two subassemblies. Before building either subassembly, the firm must purchaseraw materials and train workers. Before the subassemblies can be combined, subassembly2 must be inspected. The following table describes the project:Activity Description Requires Duration (Days)A Train workers 6B Purchase materials 9C Make subassembly 1 A,B 8D Make subassembly 2 A,B 7E Inspect subassembly 2 D 10F Combine subassemblies C, E 12G Subassembly 2 safety report E 6How quickly can Widgetco complete this project?(a) Define decision variables.(b) Write a suitable LP problem formulation.
arrow_forward
Activities, preceding activities, normal and crashed completion times of each of the activities and
crashed costs of activities per week of a project are given in the following table.
Activity Preceding
Activity
Normal
Crashed Completion
time (week)
Crashed Cost
Completion Time
(week)
7
per week
A
7
B
$500
C
4
3
$700
$600
A
A, C
В, D
D, E
D
7
E
F
10
9.
$800
9
8
$400
i.
Draw the network diagram linking all the activities in a way that it shows if there exist any
preceding activity/activities before starting each of the mentioned activities in the above
table.
ii.
Find the earliest start time, the earliest finish time, the latest start time and the latest finish
time of each of the activities in the drawn diagram of the project and hence the completion
time of the project and the critical path.
arrow_forward
Describe the functioning of the Spiral Model and the V Model for managing the execution of a project.
arrow_forward
IMPORTANT NOTE: All Project Management Questions are from the same Project. You only need to solve the project one time.
The CEO of Carol O'Lights Manufacturing, produces custom-built relay devices for auto makers. The most recent project undertaken by Ms. O'Lights requires 11 different activities. The activities necessary to build an experimental relay model and related data are given in the following table.
What is the Early Start on Activity G?
arrow_forward
scenarios of a project activities (tables given below) and their required times to be completed in
addition to their predecessors for developing a Website' :
Activity
Description
Duration (days)
Preceding Activities
A
Determine user needs
8
Review s/w and languages
Purchase software
10
Design format and style
10
E
Write programs
A
F
Review outcome product with user
12
G
Make revisions
4
C
H
Select server site
E
I
Install on server
14
D, F
Test
G, H, I
3. Highlight the total time to complete the project (days)
4. Calculate the late finishing time (backwards calculations)
arrow_forward
The triple constraints of project management include:
O A. Risk, Scope and quality
O B. WBS, Scope and deliverables
O C. Cost, quality and communication
O D. Cost, time and scope
arrow_forward
scenarios of a project activities (tables given below) and their required times to be completed in
addition to their predecessors for developing a Website' :
Activity
Description
Duration (days)
Preceding Activities
A
Determine user needs
8
Review s/w and languages
Purchase software
10
Design format and style
10
E
Write programs
A
F
Review outcome product with user
12
G
Make revisions
4
C
H
Select server site
E
I
Install on server
14
D, F
Test
G, H, I
5. Calculate the slack time of the non-critical path activities
6. Identify the critical path (highlight critical path activities)
7. what would happen if activity D revised to take 14 instead of 10 days?
arrow_forward
The table below contains information about an environmental clean-up project in the township of Hiles. Shorten the project
threethree
weeks by finding the minimum-cost schedule. Assume that project indirect costs and penalty costs are negligible. Identify activities to crash while minimizing the additional crash costs.
Activity
Normal Time
(weekweeks)
Crash Time
(weekweeks)
Cost to Crash
($ per
weekweek)
Immediate Predecessor(s)
A
55
44
300300
None
B
77
44
5050
None
C
77
66
300300
A
D
77
66
250250
A
E
11
11
long dash—
B
F
33
33
long dash—
C, D
G
55
44
200200
D, E
H
44
22
200200
F
I
22
22
long dash—
G
Part 2
Fill in the table below with the activity times after crashing to show the resulting schedule. (Enter your responses as…
arrow_forward
On June 12, 2013, the Delta Corporation was awarded a $160,000 contract for testing a product. The contract consisted of $143,000 for labor and materials, the remaining $17,000 was profit. The contract had a scheduled start date of July 3. The network logic, as defined by the project manager and approved by the customer is the following:
NETWORK LOGIC / ACTIVITY
TIME (Weeks)
AB
7
AC
10
AD
8
BC
4
BE
2
CF
3
DF
5
EF
2
FG
1
On August 27, 2013, the executive steering committee received the following report indicating the status of the project as of this time (end of week 8)
ACTIVITY
% COMPLETE
ACTUAL COST
TIME REMAINING (Weeks)
AB
100
$23,500
0
AC
60
$19,200
4
AD
87.5
$37,500
1
BC
50
$8,000
2
BE
50
$5,500
1
Is the project ahead of schedule or behind schedule and over budget or under budget?
What recommendations would you make for this project?
arrow_forward
The following table contains information related to the car problems of 2 SUV being maintained in Toyota.
Activity
Immediate
Time (days)
Total Cost
Maximum
Crash
cost per
day
Predecessor
Normal
Crash
Normal
Crash
Reduction in
Duration
time
A
9.
4
P1,500
P2000
В
A
3
1000
1400
8.
4
1600
2200
C
4
900
1150
E
В, D
1
800
1300
What is the expected project duration?
arrow_forward
Please help me experts to solve this problem.
Thank you.
arrow_forward
What roles do the typical process management responsibilities of planning, organising, and regulating play in project administration?
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you
Understanding Business
Management
ISBN:9781259929434
Author:William Nickels
Publisher:McGraw-Hill Education
Management (14th Edition)
Management
ISBN:9780134527604
Author:Stephen P. Robbins, Mary A. Coulter
Publisher:PEARSON
Spreadsheet Modeling & Decision Analysis: A Pract...
Management
ISBN:9781305947412
Author:Cliff Ragsdale
Publisher:Cengage Learning
Management Information Systems: Managing The Digi...
Management
ISBN:9780135191798
Author:Kenneth C. Laudon, Jane P. Laudon
Publisher:PEARSON
Business Essentials (12th Edition) (What's New in...
Management
ISBN:9780134728391
Author:Ronald J. Ebert, Ricky W. Griffin
Publisher:PEARSON
Fundamentals of Management (10th Edition)
Management
ISBN:9780134237473
Author:Stephen P. Robbins, Mary A. Coulter, David A. De Cenzo
Publisher:PEARSON
Related Questions
- I'm unable to answer the following question? What is the total cost of crashing the project from its current duration down to 13 weeks?arrow_forwardList two outputs for each of the Project Risk Management processes (note that the Implement Risk Responses process is not discussed in this chapter)arrow_forwardThe table below contains information about an environmental clean-up project in the township of Hiles. Shorten the project three weeks by finding the minimum-cost schedule. Assume that project indirect costs and penalty costs are negligible. Identify activities to crash while minimizing the additional crash costs. Q Activity A B C D E The cost of shortening of project is $ F G H I Normal Time (weeks) 5 7 7 7 1 3 5 4 2 Crash Time (weeks) 4 4 Activity A B C D E 6 4 6 1 3 4 2 2 Cost to Crash ($ per week) . (Enter your response as a whole number.) 300 50 300 250 200 200 Fill in the table below with the activity times after crashing to show the resulting schedule. (Enter your responses as whole numbers.) Time according to schedule (weeks) Time according to schedule (weeks) Immediate Predecessor(s) Activity F G H I None None A A B 3~~ C, D D, E F Garrow_forward
- Project Scope Management Khan, (2006) (see below) states that, "Managing the scope of a project is the most important function of a project manager ... Effective scope management of a project also ensures the success of key completion areas, including time, cost, and quality. Project scope management can be further subdivided into its components which include: project initiation, scope planning, scope definition, scope verification, and scope change control." Based on your Integrated Project: Select two of the subdivisions above and discuss the primary issues that could arise from the process. Your response should begin with a definition of the selected subdivision before detailing the selected processarrow_forwardplease answer all parts of the question within 30 minutes.arrow_forwardThe table below contains information about an environmental clean-up project in the township of Hiles. Shorten the project three weeks by finding the minimum-cost schedule. Assume that project indirect costs and penalty costs are negligible. Identify activities to crash while minimizing the additional crash costs. Normal Time Crash Time Activity (weeks) (weeks) Cost to Crash ($ per week) Immediate Predecessor(s) A 5 4 200 B 9 8 300 None None C 4 2 200 A 4 2 250 A E 3 3 B F 3 3 C, D G 3 1 150 D, E 6 4 350 F G 7 4 Fill in the table below with the activity times after crashing to show the resulting schedule. (Enter your responses as whole numbers.) Activity A Time according to schedule (weeks) Activity Time according to schedule (weeks) F G B C D Earrow_forward
- Roger Ginde is developing a program in supply chain management certification for managers. Ginde has listed a number of activities that must be completed before a training program of this nature could be conducted. The activities, immediate predecessors, and times appear in the accompanying table: a. the critical activities for the leadership training program development project are: _____ b. the project length for the leadership training program development project= __ days. c. Slack time for each of the activities is: Activity: Slack time: A ______ B ______ C ______ D ______ E ______ F ______ G ______arrow_forwardThe table below contains information about an environmental clean-up project in the township of Hiles. Shorten the project three weeks by finding the minimum-cost schedule. Assume that project indirect costs and penalty costs are negligible. Identify activities to crash while minimizing the additional crash costs. Normal Time Activity (weeks) Crash Time (weeks) Cost to Crash ($ per week) Immediate Predecessor(s) 59 5 4 4 82233-6 3337 ABCDEFGH - 4 200 None 300 None 200 A 250 A B C, D 1 150 D, E 350 F G 4 4 Fill in the table below with the activity times after crashing to show the resulting schedule. (Enter your responses as whole numbers.) Time according to schedule (weeks) 3 1 Activity Time according to schedule (weeks) Activity A 4 F B 8 G C 3 H 6 D 3 4 E 3 The cost of shortening of project is $ ☐. (Enter your response as a whole number.)arrow_forwardGood day may I have some help with part D and E in the attached picarrow_forward
- Management & Science University (MSU) have appointed you as a project manager to conduct a Joint Application Design (JAD) session with members from various departments. As a project manager, you are required to develop a specific schedule for the tasks listed below. The estimated task duration for each shown in parentheses. First, you must contact and brief the participants and explain their responsibilities (1 day). Then you must obtain approval from their department managers (3 days). After you have obtained the approval, you can begin the two tasks where you can prepare the agenda for the JAD session (7 days) and arrange the meeting room (2 days) When the agenda is ready, you can start two more concurrent tasks which are preparing the information packets (4 days) and to create visual aids (8 days). When the meeting room is arranged and information packets are ready, you can send out an email to all participants (1 day). Finally, after the e-mail is sent to participants and the…arrow_forwardHow can a business analyst communicate requirements (and associated models) for a project in project management.arrow_forwardRoger Ginde is developing a program in supply chain management certification for managers. Ginde has listed a number of activities that must be completed before a training program of this nature could be conducted. The activities, immediate predecessors, and times appear in the accompanying table: This exercise contains only parts b, c, and d. b) The critical activities for the leadership training program development project are c) The project length for the leadership training program development project = ☐ days. d) Slack time for each of the activities is: Activity Immediate Predecessor(s) Time (days) A 4 B 7 2 B 10 A, D с 3 5 E, F 12 Activity A Slack Time B с D E F Garrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Understanding BusinessManagementISBN:9781259929434Author:William NickelsPublisher:McGraw-Hill EducationManagement (14th Edition)ManagementISBN:9780134527604Author:Stephen P. Robbins, Mary A. CoulterPublisher:PEARSONSpreadsheet Modeling & Decision Analysis: A Pract...ManagementISBN:9781305947412Author:Cliff RagsdalePublisher:Cengage Learning
- Management Information Systems: Managing The Digi...ManagementISBN:9780135191798Author:Kenneth C. Laudon, Jane P. LaudonPublisher:PEARSONBusiness Essentials (12th Edition) (What's New in...ManagementISBN:9780134728391Author:Ronald J. Ebert, Ricky W. GriffinPublisher:PEARSONFundamentals of Management (10th Edition)ManagementISBN:9780134237473Author:Stephen P. Robbins, Mary A. Coulter, David A. De CenzoPublisher:PEARSON
Understanding Business
Management
ISBN:9781259929434
Author:William Nickels
Publisher:McGraw-Hill Education
Management (14th Edition)
Management
ISBN:9780134527604
Author:Stephen P. Robbins, Mary A. Coulter
Publisher:PEARSON
Spreadsheet Modeling & Decision Analysis: A Pract...
Management
ISBN:9781305947412
Author:Cliff Ragsdale
Publisher:Cengage Learning
Management Information Systems: Managing The Digi...
Management
ISBN:9780135191798
Author:Kenneth C. Laudon, Jane P. Laudon
Publisher:PEARSON
Business Essentials (12th Edition) (What's New in...
Management
ISBN:9780134728391
Author:Ronald J. Ebert, Ricky W. Griffin
Publisher:PEARSON
Fundamentals of Management (10th Edition)
Management
ISBN:9780134237473
Author:Stephen P. Robbins, Mary A. Coulter, David A. De Cenzo
Publisher:PEARSON