LOG 0050 – Developing a Life Cycle Sustainment Plan (LCSP)
Knowledge Review Questions
The LCSP focuses on which of the following:
Who will do what?
When it will be done?
How it will be done (e.g., specific tools and processes)?
All of the above
The LCSP Introduction describes the LCSP’s specific purpose, scope, focus, and objective; it also __________
Summarizes corrective actions from design, programmatic, test, and logistics review
Addresses LCSP update methods and the criteria for doing so
Details design reviews from a sustainment perspective
Focuses on the events that drive the program’s sustainment budget
Each LCSP should be tailored to meet the program’s specific needs.
True
False
In Life Cycle Management, performance-based product support (also known as Performance Based Logistics) is tied to outcome-based sustainment metrics. (True or False)
True
False
Select the two overarching policy documents for LCSPs.
DoD Instruction 5000.91
DoD Directive 5000.01
DoD Instruction 5000.02
DoD Instruction 5000.88
The LCSP is a primary management tool used to document the PM’s plans for which of these objectives? Select THREE answers that apply.
Statically describing the program policy and guidance for sustainment product support
Continually measuring, assessing, and reporting program execution in terms of cost, schedule, and performance, schedule, sustainment, and cost outcomes
Providing the user with an effective, affordable, sustainable system and product support approach that meets specified performance requirements
Delivery the Warfighter’s requirements through the product support package
In addition to including the assigned responsibilities and management approach for achieving effective and timely acquisition, product support, and availability throughout the program’s life cycle, what other TWO elements must the LCSP include?
A schedule for developing and fielding the product support package
Listings for other product support managers involved with the program’s tasking
Funding required and budgeted by year (including the appropriation) for the product support elements
A manifest of commercial-off-the-shelf (COTS) systems or programs used to track the life cycle
Which policy document describes the requirements for covered and non-covered system LCSPs?
DoD Directive 5000.01
DoD Instruction 5000.91
DoD Instruction 5000.02
DoD Instruction 5000.88
Who is responsible for oversight and management of the product support function, including developing, implementing, integrating, and fielding the Product Support Package required to meet the Warfighter’s sustainment are readiness requirements? Select the TWO that apply.
Program Manager
Program Risk Manager
Product Support Manager
Program Integration Manager
Key enterprise players the PM and PSM engage during LCSP development are Combat and Joint Operational Commands (Warfighter), the Financial Community, and what other Communities? Select the
TWO that apply.
Program and Acquisition Communities
Communications Community
Oversight and Judicial Communities
Sustainment Community
Sustainment metrics provide the common thread to integrate the product support elements and to align the behaviors required to achieve the desired materiel readiness outcome across the entire enterprise.
True
False
Which of the following is NOT an example a “Desing to” metric for Maintainability:
Repair Turnaround Time (RTAT)
Mean Time Between Failure (MTBF)
Depot Maintenance Man-hours
Mean Time to Repair (MTTR)
What metrics are required to achieve a system’s Key Performance Parameters (KPPs), Key System Attributes (KSA), and Additional Performance Attributes (APA) across the life cycle?
Input-based Metrics
Life Cycle Sustainment Outcome Metrics
Potential Additional Outcome Metrics
Behavior-based Outcome Metrics
True or False: Additional Outcome Metrics that are “design-to” metrics that support the mandatory Life Cycle Sustainment Outcome Metrics should be coordinated with systems engineers and included in the design specifications.
True
False
During which TWO phases of the MCA pathway does the LCSP focus most on the Product Support Package (PSP) implementation details?
Materiel Solution Analysis
Technology Maturation and Risk Reduction
Production and Deployment
Operations and Support
During the __________ phase of the MCA pathway, the LCSP documents the approved maintenance plan
and metrics.
Materiel Solution Analysis
Technology Maturation and Risk Reduction
Production and Deployment
Operations and Support
In the Operations and Support phase, the LCSP documents which items? Select TWO that apply.
Tracking metrics and adjustment plans
Setting metrics thresholds and test methods
Adjustments to fielding plans
Required new sustainment technologies for initial design
In what MCA phase does the LCSP focus on the baseline product support strategy, the analytical process for determining affordable metrics objectives and thresholds, and ensuring supportability design features are included in design specifications and the development Request for Proposal?
Materiel Solution Analysis
Technology Maturation and Risk Reduction
Engineering and Manufacturing Development
Engineering and Manufacturing Development
Operations and Support
During the Production and Deployment phase of the MCA pathway, the LCSP focuses on analytical and management processes for refining the Product Support Package elements and deploying the Product Support Package.
True
False
The first LCSP focus on framing the baseline product support strategy and affordable metrics happens during which phase of the MCA pathway?
Materiel Solution Analysis
Engineering and Manufacturing Development
Production and Deployment
Operations and Support
Life Cycle Sustainment Outcome Metrics are essential to effective and affordable sustainment planning, and consist of Availability, reliability, and what other critical metrics? Select TWO that apply.
Maintainability
Transportation Method
Supply Pipeline Time
Operating and Support (O&S) Cost
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
The annotated outline was structured as a framework to assist DoD programs in thinking through the set of planning factors that must be integrated to achieve the sustainment results quantified in user-
specified requirements.
True
False
The Product Support Strategy section includes all of the following EXCEPT?
A high-level depiction of the Product Support Strategy
The Reference Design Concept
Detailed budgetary information by appropriation
Consideration of DoD enterprise solutions
Which LCSP Outline section includes a description of Product Support Arrangements with both contractor and organic Product Support Integrator(s) and Product Support Provider(s)?
Introduction
Product Support Strategy
Product Support Performance
Sustainment Strategy and the Product Support Package
What section of the LCSP Outline includes a discussion of Competition in Sustainment, Property Management, and Cross-Functional Sustainment Considerations?
Introduction
Other Sustainment Considerations
Product Support Performance
Influencing Design and Sustainment
The four major types of Program and Desing Reviews that result in sustainment findings documented in the LCSP are program, technical, __________ and __________.
Milestone, Decision Point
Test, Logistics
Financial, Contracting
Cost, Schedule
LCSP Outline Section 9, Program Funding and Life-Cycle Cost Estimate, includes information on O&S and Disposal Costs, O&S Cost Drivers, Cost Reduction Initiatives, and what other important cost topic?
Inflation indices
Sustainment Funding Shortfalls
Cost of Money
Low-cost alternatives
LCSP Annexes for ACAT I LCSPs requiring ADS(S) approval should be accompanied by __________?
Cost estimates for preparing them
Lower-level coordination sheets
Executive summaries
Time estimates for preparing them
Which of the following describe the purpose of the LCSP coordination? (Select the TWO that apply)
Reduces the LCSP review cycle time
Increases the LCSP review cycle time
Reduces the LCSP review effort
Increases the LCSP review effort
The Action Officer who will shepherd the LCSP through coordination to ASD(s) approval and signature is assigned to the Office of DASD(PS).
True
False