Name: ___________________________ Quiz 2 – Section 001 Dandy Donuts makes and sells thousands of donuts each day. Demand is greater than supply. The donut production process starts with the measuring of ingredients. First, one employee pours the pre-packaged dry mix into a large bowl located on a scale. It takes five (5) minutes to get the proper weight of 40 pounds. Once the proper amount has been measured, the employee will add yeast in one (1) minute and mix the dry ingredients for one (1) minute. During that process, a second employee measures the moist ingredients (eggs, water, and others) in eight (8) minutes and stirs them in a large mixing bowl for one (1) minute. Then, the second employee slowly pours the wet mixture into the dry mix, while mixing, for a four (4) minutes time span. When the two mixes are combined, the second employee begins the kneading process, which takes exactly 13 minutes. The dough is now ready to be shaped into 3,900 donuts. 1. (25 points) What is the throughput time to form the dough (assuming no setup, moving, or wasted time)? 2. (25 points) Which process (from the product-process matrix) is being used to make the dough? 3. (25 points) What is the output rate? 4. (25 points) What is the utilization rate of the second employee?
Name: ___________________________ Quiz 2 – Section 002 Dandy Donuts makes and sells thousands of donuts each day. Demand is greater than supply. The dough is placed into an extrusion machine which produces eight (8) donuts in five (5) seconds, placing them onto a steel shelve which moves throughout a “proofing” machine to allow the dough to slowly rise (inflate). After 30 minutes in the proofing machine, the now-puffy donuts slide one shelf at a time into a fryer. The donuts fry for one (1) minute; then, they are mechanically flipped to fry on the opposite side. After the second minute, the donuts emerge on a conveyer belt and move through a glazed waterfall (melted sugar glaze) which covers the tops, sides, and bottoms of the donut. It takes 1 minute on the waterfall conveyor belt. Then, the donut transfers to a second conveyor belt for two (2) minutes to dry and cool. Once at the right temperature, 12 donuts are placed into one box, ready for sale. It takes an employee 55 seconds to load one box and close its lid. There are nine (9) packing employees. Show your math to receive partial credit 1. (25 points) What is the output rate? 2. (25 points) What is the throughput time from dough to finished box (assuming no setup, moving, or wasted time)? 3. (25 points) Which process (from the product-process matrix) is being used to glaze the donuts? 4. (25 points) What is the utilization rate of each packing employee, on average?
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help