N ORTHEASTERN U NIVERSITY M ECHANICAL & I NDUSTRIAL ENGINEERING DEPARTMENT MIDETERM N O . ( PART II) 1 C OURSE C ODE D ATE SUPPLY CHAIN ENGINEERING Dr. César Martínez Olvera IE 7200 10/13/2023 N AME ID N UMBER G RADE JAY BHAVSAR 002790681 “I pledge to comply with the Code of Ethics of Northeastern University – Department of Mechanical & Industrial Engineering, while working in the solving of the problems present in the current homework You have the Sales information for Operations #6 and #7: Operation#6 Operation#7 Period Sales Period Sales 1 4000 1 5000 2 4000 2 6500 3 3500 3 6000 4 6000 4 4500 5 5000 5 5000 6 4000 6 6500 7 3500 7 5000 8 3000 8 5500 9 3500 9 5000 10 4000 10 5000
Use the Forecast Sheet tool of Excel, to forecast periods 11, 12, 13, and 14 (of Operations #6 and #7). Based on the obtained results, answer the following questions: 1.- Which Logistic Network offers a total fulfilled demand (see Appendix A for an example of this last), the AS-IS (without Op5GER) or the TO-BE (with Op5GER)? Support your answer with the proper information and/or analysis. Value: 30 points.
NONE OF THEM MEET THE DEMAND 2.- If you want to avoid generating total unfulfilled demand (see Appendix B for an example of this last), you have the option of increasing the Maximum delivery capacity among Manufacturing Country per Operation #, as shown in the following table: , , which combination (ONE and ONLY ONE) you choose? Support your answer with the proper information and/or analysis. Value: 40 points. Shipment # 2: Op#2 – Op#5 4: Op#4 – Op#5 5: Op#5 – Op#6 6: Op#5 – Op#7 GER GER MEX BRA MEX BRA MEX from 8000 to 9000 BRA from 5000 to 6000 GER from 7000 to 8000 from 8000 to 9000
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Reason why we rejected the rest because of network path asymmetry in selection of the operation locations as they are considering Germany and Brazil in the network. For 2: Op#2 – Op#5: total cost achieved 1650 For 4: Op#4 – Op#5:total cost achieved 2050 For 5: Op#5 – Op#6:total cost achieved 1540 For 6: Op#5 – Op#7:total cost achieved 1410 3.- If you could modify ONE and ONLY ONE maximum delivery capacity constraints, that is, shipments among Manufacturing Country and Operation #, or Xinputs (1 or 2), or Xoutputs (1 or 2), which one would be and why? Justify in detail your answer. Value: 10 points. XOUTPUT2 SHOULD BE MORE THAN 5017 SO THE DEMAND CAN BE FUILFILLED. Conclusion:- Even though we have increased the maximum delivery capacities for the four scenarios, we are selecting scenario #4 because of better operational
efficiency through lesser cost and there is no difference in the output even if we increase the maximum delivery capacity, because increasing delivery capacities without a change in result is nothing but scraping the resources in vain which may incur extra indirect costs.