Window Installation Assumptions Log Confirmed Negated Still Open Contractors available X The job is accurately quoted X Contractor is on time for the job X X Windows arrive on time X Windows arrive undamaged X X X Caulk is neat and completely sealing openings X X Window area was checked for water damage X Window was installed level X Make sure windows are correct size X Customer is satisfied upon completion X Windows are sturdy and will not fall out X Feedback Loop Closed X Contractor acts professionaland trained during window installation The windows will fit where they have to be installed Windows were checked for leaks upon completion Windows were checked for condensation upon completion
Risk Assessment Area Name: Risk Description 1 Product arrives broken 2 Product is delayed (various reasons) 3 Home owner dissatisfied with installation 4 5 Inclimate weather delaying installation 6 Wrong order/incomplete 7 8 Customer unhappy with product or job 9 Pricing conflict/hidden costs 10 Inability to pay after installation is completed 11 Injury on the job 12 Short Staffed/ Call in 13 Leaks or has water damage 14 Not installed proper - gaps in caulk, poor ventilation 15 Not the correct insulation grade 16 Unique ID Not enough workers for job causing a longer than quoted installation Structural issue with home rendering installation impossible Uneven windows - older shifting homes and windows
17 18 Water damage between panes from condensation If not installed proper will put a strain on heating or cooling unit
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Window Installation Caused by & Consequences Delivery/wharehouse malfunction- order new window Poor instillation - have to re-install possibly refund project Weather- Have to postpone project Window installer - redo job, possibly refund Window installer - redo job, possibly refund Window installer - redo job, possibly refund Weather, warehouses, window company - have to wait for the window Worker shortage/not enough skilled workers - have to prolong project and spend more money House integrity - Possibly re frame the wall to make possible or pass the project Project manager's communication - incorrect assumptions or incomplete planning Home owner, possible disatisfaction - possible breaking of contract Unstable surfaces, heights, tools - loss of worker, possible delay of project Worker sickness or inability to work - possible delay of project, difficulty with completeion of project Window Quality - having to order new window, possible delay of project Window Manufactuer, who ordered the window - having to order new window, possible delay of project House integrity - Possibly try diffrent window types to hide the uneveness
Window installer - redo job, possibly refund, possibly have to pay for damages or follow warranty Window Quality - having to order new window, possible delay of project
Updated By: Risk Group 1 Date Last Updated: 12/3/2023 Risk Owners Name & Role Probability Impact Risk Rating Alexandra Major - Transition Manager Low High Severe Rebecca Fisher - Project Leader Low Medium Moderate Rebecca Fisher - Project Leader Low Very High Critical Cody Yamada - Project Cooridanator High Very High Critical Cody Yamada - Project Cooridanator Low Low Sustainable Jonathan Mauer Project - Support Manager Low Very High Critical Jonathan Mauer Project - Support Manager Low Very High Critical Jonathan Mauer Project - Support Manager Low Very High Critical Cody Yamada - Project Cooridanator High High Critical Rebecca Fisher - Project Leader High High Critical Jonathan Mauer Project - Support Manager Low High Severe Jonathan Mauer Project - Support Manager Low Low Sustainable Alexandra Major - Transition Manager Low Medium Moderate Alexandra Major - Transition Manager Low Medium Moderate Cody Yamada - Project Cooridanator Low High Severe Jonathan Mauer Project - Support Manager High Low Moderate Inherent Risk (Without Controls)
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Alexandra Major - Transition Manager Low Medium Moderate Alexandra Major - Transition Manager High Medium Severe
Control(s) Control Owner(s) Name & Role Alexandra Major - Transition Manager Very Low Administrative - reschedule install Rebecca Fisher - Project Leader Low Rebecca Fisher - Project Leader Low Cody Yamada - Project Cooridanator Low Administrative - reschedule install Cody Yamada - Project Cooridanator Low Alexandra Major - Transition Manager Low Alexandra Major - Transition Manager Low Rebecca Fisher - Project Leader Low Cody Yamada - Project Cooridinator Medium Rebecca Fisher - Project Leader Medium Cody Yamada - Project Cooridanator Low Substitution - backup personnel Jonathan Mauer Project - Support Manager Very Low Rebecca Fisher - Project Leader Low Rebecca Fisher - Project Leader Low Alexandra Major - Transition Manager Low Jonathan Mauer Project - Support Manager Very Low Residual Probability Substitution - Window will be reordered/replaced Administrative - Installers complete training Engineering - backup personnel for potential shortage Engineering - inspect home thorughly to identify issues Elimination - training personnel and proper home inspection Elimination - training personnel and proper home inspection Administrative - refer to communication plan and scope Administrative - Installers complete training PPE - inspect work area, provide proper tools and equipment Substitution - replace identified issue PPE - inspect area, provide proper tools and equipment/training Substitution - replace identified issue Elimination - inspect for rot or other potential faults
Alexandra Major - Transition Manager Very Low Alexandra Major - Transition Manager Medium Administrative - Installers complete training Substitution - replace identified issue
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Residual Impact Impact: Very Low Low Medium Medium Sustainable Probability Very High Moderate Severe Severe Low Sustainable High Sustainable Moderate Severe Low Sustainable Medium Sustainable Moderate Moderate Low Sustainable Low Sustainable Sustainable Moderate Low Sustainable Very Low Sustainable Sustainable Sustainable Medium Moderate Medium Moderate Medium Moderate Medium Moderate Medium Moderate Medium Moderate Very Low Sustainable Low Sustainable Low Sustainable Low Sustainable Very Low Sustainable Inherent Risk (With Controls) Residual Risk Rating
Low Sustainable Medium Moderate
Probability Impact Very High Very High High High High Very High Medium Medium Critical Critical Low Low Critical Critical Very Low Very Low Severe Critical Severe Critical Moderate Severe
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Communication Purpose Audience Owner Project Kickoff Meeting Project Leader Project Status Report Project Leader Changes Review Board Team Meetings Initiate project with the team, cover goals and objectives, timelines, transition project from initiation to planning to implementation Customer, Project Cooridinator Communicate project's issues, and risks All project stakeholders Review new project requests, project changes, and updates impacting the project baselines (scope, schedule, and budget) Customer, Team Leads, Manufacturing Contact Project Leader, Transition Manager Review team's progress with the project, discuss challenges/roadblocks, evaluate path towards accomplishing key milestones Project Contractors, Manufacturing, Team Leads Project Leader, Team Leads External Suppliers Updates Check status of manuafacturing to gurantee timeline Team Leads, Manufacturing Contact Project Cooridinator, Project Support Manager
Method of Communication Frequency Once Report Bi-weekly Once Virtual or Onsite Virtual Weekly In-person meeting, preferably on-site Change request form - Customer has 2 weeks from signing to make changes Daily for length of installation
Window Installation Feedback Loop Yes No The installers were professional and courteous X There were enough installers for the job X X The product arrived unbroken X The order was complete and accurate X X Cost of job matches original quote X X Needs Improvement The product was wrapped and secured upon arrival Technician checked for gaps and leaks prior to leaving The length of time for the installation was not longer than quoted
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Comment Satisfactory Satisfactory Satisfactory Satisfactory Completed Satisfactory / no leaks Quote was the exact cost of the job Job was commpleted on time