Question 1 of 5. You just received initial Key Performance Parameters (KPPs). This has resulted in the update of your Acquisition Strategy (AS), used for identifying key technologies. Your next effort will be to confirm that design constraints can be met by available manufacturing technologies. What Manufacturing Readiness Level should you use to assess this scenario? MRL 4 MRL 7 MRL 8 MRL 1 Question 2 of 5. Your Program Manager recently received results from models used to evaluate competing design options. You have been asked to compare these results and recommend a design option that best meets draft Key Performance Parameters (KPPs) and desired Reliability, Availability, and Maintainability (RAM) goals. What Manufacturing Readiness Level should you use to assess this scenario? MRL 5 MRL 7 MRL 3 MRL 1 Question 3 of 5. Which of the following identifies the purpose of conducting a Manufacturing Readiness Assessment? To ensure manufacturing and production risks are identified and managed throughout the program’s lifecycle To ensure manufacturing and production risks are identified and managed during Production and Deployment To ensure manufacturing and production risks are identified and managed during Materiel Solution Analysis To ensure manufacturing and production risks are identified and managed during the Sustainment Phase Question 4 of 5. During developmental testing, your ground system has experienced sand intrusion in the suspension and brakes. This issue will have a significant impact on desired Reliability of the system. Redesign will require updating your Risk Assessment. There are also significant impacts on your Producibility Program, which could delay the Critical Design Review. What Manufacturing Readiness Level should you use to assess this scenario? MRL 10 MRL 7 MRL 4
MRL 9 Question 5 of 5. Your program successfully delivered systems to meet the Initial Operational Capabilities for the Warfighter. Production rates are stable; however, rework rates indicate several production processes are experiencing excess variation. This is negatively impacting unit and total program cost. Additionally, a Small and Disadvantaged business owner is having health problems and is planning to sell the business. What Manufacturing Readiness Level should you use to assess this scenario? MRL 6 MRL 5 MRL 10 MRL 7 Question 2 of 5. You are the Lead Engineer for a Rapid Acquisition program based on the militarization of a commercial, racing model dune buggy. Early vehicles experienced problems with welded joints cracking on the frame due to the rugged operational conditions. Additional material was added to eight locations on the frame. Additional inspections and testing are required. The results of these studies will influence producibility and will allow collection of product data essential for manufacture of subsystem prototypes. What Manufacturing Readiness Level should you use to assess this scenario? MRL 8 MRL 3 MRL 4 MRL 6 Question 4 of 5. Your Program Manager (PM) wants to research the possible use of a new technology to improve the performance of their system. Your team is preparing a briefing on manufacturing research opportunities that might support maturation of the new technology. What Manufacturing Readiness Level should you use to assess this scenario? MRL 6 MRL 1 MRL 4 MRL 3 Question 5 of 5. “Direct Fire and Under Armor Plates” are not yet meeting performance (threshold) requirements and are overweight. Additional studies and testing will be required to mature these technologies in order to meet the performance (threshold) requirements to reduce the weight. Key design constraints have been initiated. They are limiting the availability of
manufacturing sources and are delaying the collection of data required for prototype production. What Manufacturing Readiness Level should you use to assess this scenario? MRL 2 MRL 8 MRL 3 MRL 5