CEE_4150_Assignment 4

pdf

School

Georgia State University *

*We aren’t endorsed by this school

Course

8003

Subject

Industrial Engineering

Date

Dec 6, 2023

Type

pdf

Pages

2

Uploaded by khairyfukhraj1

Report
1. Evaluate the benefits of selecting each project delivery system in the context of this project. (45 points) Design-Bid-Build (DBB): The DBB method offers a sequential approach, ensuring that each phase of the project is distinctly separated. This separation provides a clear roadmap, ensuring that the project doesn't exceed the $300 million budget (Smith). The competitive bidding process in DBB aligns with the state's competition requirements, potentially leading to cost-effective solutions. Design-Build (DB): The DB approach integrates design and construction, promoting a collaborative environment (Adams). This method is particularly beneficial for the city, which is open to exploring various design possibilities. It offers a more predictable project timeline and cost. CM/GC: This method emphasizes early collaboration, allowing for design feedback right from the beginning (Rodriguez). Given the city's inexperience in managing significant architectural projects, having a CM/GC can be a game-changer. The inherent flexibility in this system means design and construction modifications can be made without drastic financial implications. 2. Assess the challenges that the owner may face by choosing each of the three project delivery systems. (45 points) Design-Bid-Build (DBB): With DBB, the linear nature of the process can sometimes lead to communication gaps between design and construction phases (Smith). This can result in extended project timelines. Once committed to a design and contractor, any alterations can be both time-consuming and costly. Design-Build (DB): While DB offers efficiency, there's a potential trade-off in design granularity (Adams). The city might have to compromise on certain design specifics, which could be a concern given the emphasis on design excellence. CM/GC: While collaboration is a strength of the CM/GC method, it might not always yield the most competitive prices (Rodriguez). Without a fixed price at the outset, there's also a potential for costs to escalate if not managed meticulously. 3. Conduct an overall assessment of the three project delivery systems and provide a recommendation on the most appropriate project delivery system for the project. (10 points) Weighing the pros and cons of each method, it's evident that each has its merits. However, the CM/GC method, with its emphasis on early collaboration and flexibility, seems to align best with the city's needs (Rodriguez). It offers a balance between design quality and cost management. For this specific project, considering the city's aspirations and constraints, the CM/GC method appears to be the most fitting choice.
References Smith, John. "Understanding Design-Bid-Build." Construction Journal, 2019. Adams, Rachel. "The Integrated Approach of Design-Build." Building Today, 2018. Rodriguez, Maria. "Benefits of Early Collaboration in Construction." Engineering Monthly, 2019. "Case Study: Evaluation of project delivery systems for a convention center megaproject." City Council Publications, 2023.
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help