Quiz 11 All Correct
docx
keyboard_arrow_up
School
Blinn College *
*We aren’t endorsed by this school
Course
1311
Subject
Industrial Engineering
Date
Feb 20, 2024
Type
docx
Pages
2
Uploaded by jaiswarrahulsid
Quiz 11 All Correct
1.
The upper control limit is set to 400, and the lower control limit is set to −300. The upper specification limit is set to 280, and the lower specification limit is set to −280. You have a data point that is at 375. Which of the following is true?
The process is within statistical control, but the customer’s requirements are not being met.
2.
One of the characteristics of an agile project is that the team is continuously trying to find ways of improving efficiency. Which of the following ceremonies would be most closely aligned to Kaizen?
Sprint retrospective
3.
Your team is in the testing phase of a project, and they have identified test cases and scenarios and are now performing tests to ensure the system is working correctly. Another group is conducting a review of your team’s work to ensure project procedures are being followed. What
tool is being employed by this other group?
Audit
4.
One of the machines your team uses to test deliverables has broken down and needs to be fixed. This action would be best referred to as which of the following?
Corrective action
5.
Many issues on your project need to be resolved, and you want to identify a way of prioritizing these issues so that the team can fix the root causes that are creating the greatest number of issues. What tool will you most likely use?
Pareto Chart
6.
How would you classify the cost of product recalls?
External Failure Costs
7.
You have been reassigned to an existing project replacing the current project manager who has left the organization. You want to determine the quality goals and objectives for the project. What should you do?
Review the quality management plan
8.
You are looking at a control chart and notice that a few data points are falling on the mean, some data points are grouped together above the mean but below the upper control limit, and some are grouped together below the mean but above the lower control limit. Which of the following statements is true?
The data points that are grouped together are precise, but the data points on the mean are accurate
9.
You are in a meeting with your team members and are discussing the acceptable tolerance levels regarding the quality of deliverables. One team member states that the acceptable range should be within 2.5 percent, whereas others state 3-sigma. What should you advise?
They should consult the quality management plan
10.
Which of the following quality concepts were promoted by Crosby and Juran, respectively?
Zero defects, Fitness for Use
11.
Which of the following is an out-of-control situation?
You see one data point above the upper control limit.
12.
There are different factors causing a particular issue, and you want to find the root cause. You look at a chart that lists all possible causes of the issue and drills down each possible cause
asking a certain number of “whys.” Which tool and technique would be best suited to test a representative sample of the population?
Statistical Sampling
13.
After a lengthy discussion and debate with your stakeholders, you have finally agreed on the quality standards that the team must abide by for the next project. What should you, as the project manager, do next?
Update the quality management plan
14.
The quality assurance team is reviewing documentation to ensure your team has followed procedures and to identify any abnormal variations. What are they doing?
Audit
15.
You notice that one of the machines on the production line is working inefficiently and has produced several defects. Some of the defects need to be scrapped, but some can be repaired. You issue a change request to have the machine fixed, which is approved. This action would be referred to as
Corrective Action
16.
17.
You
managed a project to remodel a customer’s house. After only a month, the customer calls you complaining that the internal doors are not aligned correctly and do not close properly. When you check, you realize that the wrong size doors were installed, and you need to replace them all. The costs incurred in replacing the doors would be considered which of the following?
External failure cost because the product has been delivered to the customer
18.
You are working with your team to resolve a perplexing issue and need to get to the primary cause. Which tool will you most likely use?
Ishikawa Diagram
19.
Iteration retrospectives can be used for continuous improvement. True or False?
True
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help