Week 3 Assignment Work Breakdown Structure Project

docx

School

West Coast University *

*We aren’t endorsed by this school

Course

305

Subject

Industrial Engineering

Date

Nov 24, 2024

Type

docx

Pages

4

Uploaded by HighnessArt7901

Report
1 Week 3 Assignment Work Breakdown Structure Project Major Deliverables: 1. Planning and Designing a Project (Larson & Gray, 2014). 1.1.Consultation and Initial Evaluation 1.2. Plan and Theory of Construction 1.3.Choosing and Sourcing Materials 2. Preparation and Demolition 2.1 The Dismantling of Preexisting Equipment and Furniture 2.2 Analyzing the Plumbing and Electricity 2.3 Preparing the Floor and Walls 3. Repairs to the Plumbing and Electricity 3.1 Repairing and Replacing Existing Wiring and Adding New Outlets 3.2 The Pipes and Fixtures Must Be Installed 4. Setup of Cupboards and Surfaces (Larson & Gray, 2014). 4.1 Putting Together and Modifying Cabinets 4.2 Fabrication and Setup of Countertops 5. Wall and Floor Coverings 5.1 Putting up new flooring (ceramic tiles, hardwood) 5.2 Painting/Finishing Walls 6. Putting in New Appliances 6.1 Installation of the Stove, Oven, and Refrigerator 6.2 Appliance Setup: Microwave and Dishwasher 7. Setting up Lights and Fixtures
1 7.1 Lights and Fixtures for the Ceiling 7.2 Installing Lights Under Cabinets 8. Clean Up and Finishing Up (Larson & Gray, 2014). 8.1 Final Quality Control and Assurance Inspections 8.2 Cleaning 9. Client Approval After Inspection 9.1 Client Walkthrough 9.2 Approval and signature from the client 10. Finalizing and documenting a project 10.1 Documentation and Records Completion 10.2 Final Meeting for the Project Outline: 1. Initial Project Determination and Layout (Larson & Gray, 2014). 1.1 Consultation and Initial Evaluation 1.2 Plan and Theory of Construction 1.3 Choosing and Sourcing Materials 2. Planning and deconstruction 2.1 The Dismantling of Preexisting Equipment and Furniture 2.2 Analyzing the Plumbing and Electricity 2.3 Preparing the Floor and Walls 3. Tasks Involving Plumbing and Electricity 3.1 Repairing and Replacing Existing Wiring and Adding New Outlets 3.2 The Pipes and Fixtures Must Be Installed
1 4. Putting in New Cabinets and Surfaces 4.1 Putting Together and Modifying Cabinets 4.2 Fabrication and Setup of Countertops 5. Flooring and Wall Coverings. (Larson & Gray, 2014). 5.1 Laying New Floors 5.2 Painting/Finishing Walls 6. Appliance Setup 6.1 Installation of the Stove, Oven, and Refrigerators. 6.2 Appliance Setup: Microwave and Washer. 7. Lighting & Fixture Setup 7.1 Lights and Fixtures for the Ceiling 7.2 Installing Lights Under Cabinets 8. Clean Up 8.1 Final Quality Control and Assurance Assessments 8.2 Removal of Debris and Cleaning 9. Final Approval and Client Review 9.1 Client Presentation 9.2 Approval and signature from the client 10. Completion of the Project and Final Reporting (Larson & Gray, 2014). 10.1 Declaration and Records Completion 10.2 Final Meeting for the Project
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
1 Reference Larson, E, & Gray, C. (2014). Project management: The managerial process (6th ed.). McGraw- Hill.