Question
Chapter 9, Problem 6P
a)
Program Plan Intro
Maintenance:
- When the system becomes operational the requirements of the user gets changed.
- Based on the requirement change request made by the end user the requirement of the system gets changed at the maintenance phase.
- The changes that are made requires maintenance activities and that are categorized in three following ways they are:
- Corrective maintenance:
- It is the maintenance that is made in response with system errors.
- Adaptive maintenance:
- It is the maintenance that is made when there is a change in the business environment.
- Perfective maintenance:
- It is the maintenance activity that is made when the system needs to be enhanced.
- Corrective maintenance:
b)
Program Plan Intro
Maintenance:
- When the system becomes operational the requirements of the user gets changed.
- Based on the requirement change request made by the end user the requirement of the system gets changed at the maintenance phase.
- The changes that are made requires maintenance activities and that are categorized in three following ways they are:
- Corrective maintenance:
- It is the maintenance that is made in response with system errors.
- Adaptive maintenance:
- It is the maintenance that is made when there is a change in the business environment.
- Perfective maintenance:
- It is the maintenance activity that is made when the system needs to be enhanced.
- Corrective maintenance:
c)
Program Plan Intro
Maintenance:
- When the system becomes operational the requirements of the user gets changed.
- Based on the requirement change request made by the end user the requirement of the system gets changed at the maintenance phase.
- The changes that are made requires maintenance activities and that are categorized in three following ways they are:
- Corrective maintenance:
- It is the maintenance that is made in response with system errors.
- Adaptive maintenance:
- It is the maintenance that is made when there is a change in the business environment.
- Perfective maintenance:
- It is the maintenance activity that is made when the system needs to be enhanced.
- Corrective maintenance:
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
A project is proposed to design an assessment management system to keep track of course assessment submission in a university. Each course has unique ID, name, instructor, at least fifteen students and at least one subject. Each subject has a number, name, description, and at least one course assessment to be done. The subject number is unique for each course. Each assessment has a number that is unique for the given subject and has due submission date and time. In addition, each assessment has at least one given type (e.g. H: Homework, P: Program, E: Essay). Each submitted assessment is given a unique ID, has a submission timestamp (date and time) and belongs to one student only. Once an assessment is submitted, the system sends a message to the student acknowledging the submission and indicating whether the submission is on time or late. For each student, it is important to track the number of submission. Each student is identified by a unique ID, has a name, university-email, and…
Define maintenance.
As a project manager of a Software project, you have received given data about the different type of Issues identified in the project: –
Issue 1 – 85 occurrences; Issue 2 – 125 occurrences; Issue 3 – 28 occurrences; Issue 4 – 395 occurrences; Issue 5 – 185 occurrences; Issue 6 – 128 occurrences; Issue 7 – 85 occurrences; Issue 8 – 169 occurrences; Issue 9 – 148 occurrences; Issue 10 – 209 occurrences.
Which diagram you will use to prioritize the Issues? Generate the diagram using any tool and paste it here.
Chapter 9 Solutions
Database Systems: Design, Implementation, & Management
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, computer-science and related others by exploring similar questions and additional content below.Similar questions
- As an independent consultant, you have a contract with a university to develop an application to support course administration. Read the detailed description of this application and then complete the tasks that follow. A course has a unique course number and title and is assigned to one or more areas of the Computer Science program. Each course has an instructor, at least one teaching or research assistant, an online discussion forum, a delivery period (start date, end date), and a capacity (maximum number of participants). A course need not be offered each term, but the challenge option is open throughout the entire year. A course may have prerequisite courses, and a student is not allowed to register for a course if they have not fulfilled the prerequisites or their equivalent. In addition, a student who would like to challenge a course should have the course prerequisites or authorization from the course instructor. An instructor has an employee number, first name, last name,…arrow_forwardset of concurrent activities are meant to pass a course. The process is as the following: 1- Student has to attend all classes and not to miss more than 25% of the classes. 2- Students selects a paper for presentation and gives a presentation on an assigned date. 3- Student has to choose a project topic and submits at the end of the course Draw a State Machine Diagram. Make sure to define events, conditions, actions for transitions in your diagram, where appropriate.arrow_forwardYou are asked to do some requirement development. Suppose you are asked to develop a booking system for a public library system Define a possible scope for the system using the following steps. First list a wide range of things that the system could do. Then narrow down the scope by selecting the most important features that you would implement in the first release of the system. Finally, give a precise problem statement for the system. Identify stakeholders of the system. Then select one important stakeholder and design a list of questions for interviewing that stakeholder. Give functional requirements and quality requirements of the system. Create a list of use cases and describe two of them in detail using the method discussed in class (two-column method). Then draw use cases diagram to describe the system Using UML. Indicate extension, generalization and inclusion, if there are any.arrow_forward
- A class team project is assigned that requires building and presenting a spreadsheet model. A. Building a prototype spreadsheet as a first pass to meet the project requirements is a part of Project Planning. B. Discussing the results of the modeling work so far is Project Control. C.Deciding how to address the fact that the project is behind schedule is part of Project Control. D. None of the answers are correct.arrow_forward136. Phase which establishes a basis of subsequent iterations, if required is a. construction b. deployment c. planning d. communicationarrow_forwardDevelop a design class diagram and package diagram for a library system according to the given scenario. The library system provides users with the opportunity to borrow books from the library. The system includes a service page that displays all services such as borrowing and computer services. It also includes a catalog where all possible books are categorized. Users can communicate with the library via the details available on the contact page. The system allows only registered users to borrow books and the books are either hardcopy or e-books. To borrow a book the system will have to check for the eligibility of the user before approval. If the user is not eligible, then the request will be declined. Borrowing could be done via the library system or in person. The admin is responsible for the in-person borrowing. For the borrowing of any book, a form that is available on the forms page has to be filled by the user. Also, the system must check for the availability of a book before…arrow_forward
- QUESTION 10 You are a project manager overseeing the program design for a client. The team lead for the project sketches the following on your office whiteboard. What is your best response? Note: No assumptions are needed. O"Fan-in of modules is presented. The program design is approved." O Fan-through flow of modules is presented. The program design is approved." O "Control and data couples couples are flowing in wrong direction. The program design is rejected O"Fan-in of modules is presented. The program design is rejected O"Fan-out of modules is presented. The program design is approved."arrow_forwardCreate a Use Case diagram for the following scenario:The pharmacy at Mercy Hospital fills medical prescriptions for all hospital patients and distributes these medications to the nurse stations responsible for the patients’ care. Prescriptions are written by doctors and sent to the pharmacy. A pharmacy technician reviews each prescription and sends it to the appropriate pharmacy station. Prescriptions for drugs that must be formulated (made on-site) are sent to the lab station, prescriptions for off-the-shelf drugs are sent to the shelving station, and prescriptions for narcotics are sent to the secure station. At each station, a pharmacist reviews the order, checks the patient’s file to determine the appropriate-ness of the prescription, and fills the order if the dosage is at a safe level and it will not negatively interact with the other medications or allergies indicated in the patient’s file. If the pharmacist does not fill the order, the prescribing doctor is contacted to discuss…arrow_forwardQuestion 3 Draw an activity Diagram in draw.io and screenshot it for me. Scenario The exam unit uses the system after the subject registration period has closed. The system will display a list of subjects that have registered students. Using this list, the exam unit will plan out examination week. Examination week lasts 6 days, from Monday to Saturday. For each day, the exam unit will assign a subject to that day. Each day can have a total of 6 examination hours with subjects having 2- hour or 3-hour examinations. For example, if the subjects are 2-hour examinations, then 3 of them can be scheduled for the day and if the subjects are 3-hour examinations, then only 2 of them can be scheduled for the day. There can also be a mixture of 2-hour and 3-hour examinations. If the exam unit schedules too many examination hours for that day then the day resets and the exam unit needs to reschedule again. This process stops when all subjects have been scheduled.arrow_forward
- Draw a data flow diagram (DFD) for the development of the admission and registration system, bearing in mind that the users of the system, the processes and the stored data are as follows: ** see a picture please** Draw a data flow diagram starting from the zero level to the second level. Please add the detailed processes and data saved by levelarrow_forwardDescribe the structured walkthrough process. What roles need to be performed duringa walkthrough?arrow_forwardYou are required to present an outline design of a system that will be used by doctors at a medical practice to keep basic patient records. The system should record each consultation between a doctor and patient, any illness diagnosed by the doctor, and any drugs prescribed to the patient. At regular intervals, an auditor will use the system to check whether the same drug is being prescribed repeatedly to a particular patient. List 3 requirements of the system Construct the Functional decomposition of the software Construct the use case diagram of the software Construct the sequence diagram of the software (2 functions) Construct the conceptual framework of the softwarearrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Database Systems: Design, Implementation, & Manag...Computer ScienceISBN:9781305627482Author:Carlos Coronel, Steven MorrisPublisher:Cengage Learning
Database Systems: Design, Implementation, & Manag...
Computer Science
ISBN:9781305627482
Author:Carlos Coronel, Steven Morris
Publisher:Cengage Learning