The three interdependent variables that shape the project management and examine the importance of these variables for a video game software development project.

Answer to Problem 1OCQ
Solution:
The three variables that are interdependent and shape the project management are time, cost and the scope of the project. These variables are important for the video game software development project as all the three variables are necessary to build an appropriate the game software.
Explanation of Solution
The three variables that are important to shape the project management of a particular project in the company are given below:
- Time taken for the project completion
- Cost incurred to complete a particular project
- The scope of the project undertaken
The three variables are important for the video game software development project because the cost incurred in a software development determine its value in the market, if the cost is more for the developers, the market price will be more. Thus, the expectation about the use of the software in the market is dependent upon the cost of software.
Scope of the project decide the types of customer it will cover. For a video game software development project scope will decide the coverage of its userbase, for instance scope will decide whether the game will be available to single country or overseas. Larger the scope more will be the cost of the project and time taken to develop the project.
Time required to develop the software for the video game is equally important as it can bring change to its cost and scope. A project completed in lesser will be less costly and will have small scope. In case of video game project, a video game developed in less time might only be available for limited number of users and for limited platforms.
Thus these three factors should be optimally decided for the game development software project to maximize the profit that is to be expected from the project.
Conclusion:
Thus, the three variables time, cost and scope are interdependently important for the development of the software of video games.
Want to see more full solutions like this?
Chapter 9 Solutions
BUS.DRIVEN INFO.SYSTEMS W/CONNECT (LL)
- My ID# 016948724 last 2 ID# 24 Last 3 ID# 724 Please help to find the correct answer for this problem using my ID# first write le line of action and then help me to find the forces {fx= , fy= mz=arrow_forwardmy ID is 016948724 Last 2 ID# 24 Last 3 ID# 724 please help me to solve this problem step by step show me how to solve first wirte the line actions and then find the forces {fx=, fy=, mz= and for the last step find the support reactions and find forcesarrow_forwardSolve this problem and show all of the workarrow_forward
- Can I get help with this case please, thank youarrow_forwardUppgift 1 (9p) 3 m 3 m 3 m 3 m H G F 3 m ↑ Dy D B AAY 30° 8 kN Ay Fackverket i figuren ovan är belastat med en punktlast. Bestäm normalkraften i stängerna BC, BG och FG.arrow_forwardDon't use ai to answer I will report you answerarrow_forward
- Don't use ai to answer I will report you answerarrow_forwardFind the individual offset of each segments below 1 00052800: doba 2c29 653e a123 9a98 1d5d 980e 9f40 2. 0017ce00: 46b5 847d 61ab b29e 44c7 6933 64a9 b6b2 3. 0027ebf0: d13b 45d7 0699 7699 2568 868a 3cae 444earrow_forwardQ3/A unity-feedback system with the forward transfer function G(S)= K S(S+7) is operating with a closed-loop step response that has 15% overshoot. Do the following: a. Evaluate the steady-state error for a unit ramp input. b. Design a lag compensator to improve the steady-state error by a factor of 20 to get a new dominant closed-loop poles S-3.4+ j5.63. place the pole of the lag compensator at s=-0.01 c. Design a lag compensator using OP amp if R1= 100KS2 R2=10 KS2 and R3= 10Karrow_forward
- Q2: (33 Marks) Design FBD for manufacturing system where a conveyor belt is used to move a cart through a tunnel for processing. The process begins when a worker presses a start push button located at the start of the conveyor. Once the start push button is pressed, the cart moves forward along the conveyor belt and enters the tunnel. When the cart reaches the end of the tunnel, it stops automatically and remains in place for 10-minutes to complete a required operation, such as cooling or drying. After the 10-minute delay, the cart automatically returns to the starting point where the worker is stationed. The system then waits for the worker to press the start push button again, at which point the process is repeated. Start PBO Stop PBO LSI 0 LS 2 Motorarrow_forward1. Find the resolution, current and output voltage for a binary weighted resistor DAC of (applied binary word is (locoj), the resistor values R = 12 kQ, Rf = 6 k2 and VR = 12 V. 2. Convert the following 5-bit digital values (ble 10) to analog, using the R-2R ladder. Assume that the Vs = 10 V, R = Rf = 7 ksarrow_forward= = Q1/A cantilever sheet-pile wall penetrating a granular soil. Here, L₁= 3 m, L2 = 6 m, y 17.3kN/m³, Ysat 19.4 kN/m², and 0= 30. a. What is the theoretical depth of embedment, D? b. For a 30% increase in D, what should be the total length of the sheet piles? c. What should be the minimum section modulus of the sheet piles? Use σall = 172 MN/m².arrow_forward
- MATLAB: An Introduction with ApplicationsEngineeringISBN:9781119256830Author:Amos GilatPublisher:John Wiley & Sons IncEssentials Of Materials Science And EngineeringEngineeringISBN:9781337385497Author:WRIGHT, Wendelin J.Publisher:Cengage,Industrial Motor ControlEngineeringISBN:9781133691808Author:Stephen HermanPublisher:Cengage Learning
- Basics Of Engineering EconomyEngineeringISBN:9780073376356Author:Leland Blank, Anthony TarquinPublisher:MCGRAW-HILL HIGHER EDUCATIONStructural Steel Design (6th Edition)EngineeringISBN:9780134589657Author:Jack C. McCormac, Stephen F. CsernakPublisher:PEARSONFundamentals of Materials Science and Engineering...EngineeringISBN:9781119175483Author:William D. Callister Jr., David G. RethwischPublisher:WILEY