Concept explainers
Calculate the consolidation settlement under the center of mat foundation.
</TO-DETERMINE>
The consolidation settlement under the center of mat foundation is
Given information:
The length of the foundation is
The width of the foundation is
The depth of the foundation
The load value Q is
The preconsolidation pressure
The depth values are
Calculation:
Find the consolidation settlement at the center of the foundation using the relation.
Find the stress
Height of clay
Find the net load per unit area using the relation.
Find the average stress increase in the clay layer below the corner of each rectangular area.
For
Refer to Figure 6.11, “Influence factor
Take the influence factor
For
Refer to Figure 6.11, “Influence factor
Take the influence factor
Find the consolidation settlement at the center of the foundation using the relation.
Therefore, the consolidation settlement under the center of mat foundation is
Want to see the full answer?
Check out a sample textbook solutionChapter 8 Solutions
Principles of Foundation Engineering (MindTap Course List)
- 4. Draw the shear and moment diagrams for each member of the frame. The joint at B is fixed connected. 60 ||-3m- 4 kN/m 5 m Carrow_forward4-43. Draw the shear and moment diagrams for each member of the frame. Assume A is fixed, the joint at B is a pin, and support C is a roller. 6 kN/m B 4 m- 1.5 m 1.5 m 12 kNarrow_forwardQ1) Determine the member end forces of the frames shown by utilizing structural symmetry and anti-symm.(Derive each member forces and show BMD,SD,AFD) 20 kN/m 40 kN/m C D Hinge Ẹ F B 5 m 3 m -3 m 5 m E, I, A constant 12 marrow_forward
- Q1) Determine the member end forces of the frames shown by utilizing structural symmetry and anti-symm.(Derive each member forces and show BMD,SD,AFD)arrow_forwardDetermine the symmetric and antisymmetric components of the loadings shown in the figure with respect to the axis of symmetry of the structure.arrow_forwardWhat are some software tools that have been designed to produce an automatic quantity takeoff in construction?arrow_forward
- When constructing a sand volleyball court how would you control drainage and erosion, mitigation dust and noise, and control traffic on the construction site?arrow_forwardWhat are the building code requirements when building an outdoor sand volleyball court in Kentucky?arrow_forwardH.W. A soil profile is shown in figure below. Calculate the values of ot, o', u at points A, B, C and D. draw the variation of ot, o', u with the depth. 3m Water table 2.5m + 2m D Rock Dry sand, e=0.52, Gs=2.65 Sand, e=0.52, Gs=2.65 Clay, w=45%, e = 1.22arrow_forward
- No chatgpt pls will upvotearrow_forwardCalculate steel quantity in kg for CF3, CF4,CF5, CF6 from foundation layout and other footing? The depth of CF3, CF4,CF5 and CF6 are 50, 55,55 , 60 cm in order. Both long and short bar for CF3, CF4,CF5 and CF6 are Y14@15c/c T&B, Y14@15c/c T&B, Y14@15c/c T&B, Y14@12c/c T&B in order. 2. Calculate quantity of flexible sheet from foundation layout?arrow_forward(A): As shown in the rig. A hydraulic jump was occurred in a rectangular channel,the velocity of flow before and after the jump equal to 8 m/s and 2 m/s respectively. Find: The energy dissipation for the jump (AE) and what is the name of this jump. V1-8 m/s -V2-2 m/sarrow_forward
- Principles of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage LearningPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781305081550Author:Braja M. DasPublisher:Cengage LearningPrinciples of Geotechnical Engineering (MindTap C...Civil EngineeringISBN:9781305970939Author:Braja M. Das, Khaled SobhanPublisher:Cengage Learning
- Fundamentals of Geotechnical Engineering (MindTap...Civil EngineeringISBN:9781305635180Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning