Interpretation:
Whether the following statement is true or not.
Concept Introduction: The weighted average method is a method to calculate the mean in which weights or numerical value is given to qualitative data according to the importance.
a

Explanation of Solution
The following is the available information:
Factor | Weight | Location 1 | Location 2 | Location 3 |
Cost of available land parcel | 0.3 | 4 | 2 | 1 |
Accessibility | 0.5 | 5 | 2 | 4 |
Size of available land parcel | 0.2 | 1 | 5 | 3 |
- False Based on the weights given to the factor, the highest importance is given to accessibility (0.5). The second highest importance is given to the cost of available land parcels. Therefore, the statement is false.
- False Based on the available information, location 3 is rated with 4 points and location 2 is rated with 2 points. It clearly tells that location 3 is better accessible than location 2. Therefore, the statement is false.
- True Based on the weight given to the factor, the highest importance is given to accessibility (0.5). The second highest importance is given to the cost of the available land parcel (0.3) and the least important factor is given to the size of the available land parcel (0.2). Therefore, the given statement is true.
b
Interpretation:
The optimal location for new fire station.
Concept Introduction: The weighted average method is a method to calculate the mean in which weights or numerical value is given to qualitative data according to the importance.
b

Explanation of Solution
The formula is given below to determine the optimal location.
Score =
Here,
Now, calculate factor rating score for location 1:
The above formula denotes that the each factor should be multiplied by its weight, further, the answer of factor should be added.
Score =
Hence, the rating score is 3.9
Calculation of factor rating score for location 2:
Hence, the rating score is 2.6
Calculation of factor rating for location 3:
Hence, the factor rating score is 2.9
Hence, the company will select Location 1 to build new fire station. It is because the score of new location A is higher than the other two location.
c
Interpretation:
The weight of each factor.
Concept Introduction: The weighted average method is a method to calculate the mean in which weights or numerical value is given to qualitative data according to the importance.
c

Explanation of Solution
Assume that the given weights were wrong, the company considered accessibility is three times important than the other two factors. Further, the other two factors are equally important.
The cost of available land parcel and the size of the available land parcels is equally important. Therefore, both are scored as one. Further, accessibility is three times important than other factors. Therefore, it should be scored as three. Finally, the total score is five, which is 1+1+3 = 5.
Hence, the weight of the cost of available land parcel is 0.20 (1/5), the weight of size of available land parcel is 0.20 (1/5), and accessibility is 0.60 (3/5).
d
Interpretation:
Location of new fire station.
Concept Introduction: The weighted average method is a method to calculate the mean in which weights or numerical value is given to qualitative data according to the importance.
d

Explanation of Solution
Calculation of factor rating score for location 1:
The above formula denotes that each factor should be multiplied by its weight. Further, the answer of factor should be added.
Hence, the rating score is 4.
Calculation of factor rating score for location 2:
Hence, the rating score is 2.6
Calculation of factor rating score for location 3:
Hence, the rating score is 3.2
Hence, the company will select location A to build new fire station. It is because the score of location A is higher than the other two.
Want to see more full solutions like this?
Chapter 8 Solutions
Practical Operations Management
- Dietary Management in a Nursing Home. As detailed as possible.arrow_forwardFor dietary management in a nursing home. As detailed as possible.arrow_forwardA small furniture manufacturer produces tables and chairs. Each product must go through three stages of the manufacturing process – assembly, finishing, and inspection. Each table requires 3 hours of assembly, 2 hours of finishing, and 1 hour of inspection. The profit per table is $120 while the profit per chair is $80. Currently, each week there are 200 hours of assembly time available, 180 hours of finishing time, and 40 hours of inspection time. Linear programming is to be used to develop a production schedule. Define the variables as follows: T = number of tables produced each week C= number of chairs produced each week According to the above information, what would the objective function be? (a) Maximize T+C (b) Maximize 120T + 80C (c) Maximize 200T+200C (d) Minimize 6T+5C (e) none of the above According to the information provided in Question 17, which of the following would be a necessary constraint in the problem? (a) T+C ≤ 40 (b) T+C ≤ 200 (c) T+C ≤ 180 (d) 120T+80C ≥ 1000…arrow_forward
- As much detail as possible. Dietary Management- Nursing Home Don't add any fill-in-the-blanksarrow_forwardMenu Planning Instructions Use the following questions and points as a guide to completing this assignment. The report should be typed. Give a copy to the facility preceptor. Submit a copy in your Foodservice System Management weekly submission. 1. Are there any federal regulations and state statutes or rules with which they must comply? Ask preceptor about regulations that could prescribe a certain amount of food that must be kept on hand for emergencies, etc. Is the facility accredited by any agency such as Joint Commission? 2. Describe the kind of menu the facility uses (may include standard select menu, menu specific to station, non-select, select, room service, etc.) 3. What type of foodservice does the facility have? This could be various stations to choose from, self-serve, 4. conventional, cook-chill, assembly-serve, etc. Are there things about the facility or system that place a constraint on the menu to be served? Consider how patients/guests are served (e.g. do they serve…arrow_forwardWork with the chef and/or production manager to identify a menu item (or potential menu item) for which a standardized recipe is needed. Record the recipe with which you started and expand it to meet the number of servings required by the facility. Develop an evaluation rubric. Conduct an evaluation of the product. There should be three or more people evaluating the product for quality. Write a brief report of this activity • Product chosen and the reason why it was selected When and where the facility could use the product The standardized recipe sheet or card 。 o Use the facility's format or Design one of your own using a form of your choice; be sure to include the required elements • • Recipe title Yield and portion size Cooking time and temperature Ingredients and quantities Specify AP or EP Procedures (direction)arrow_forward
- ASSIGNMENT: Inventory, Answer the following questions 1. How does the facility survey inventory? 2. Is there a perpetual system in place? 3. How often do they do a physical inventory? 4. Participate in taking inventory. 5. Which type of stock system does the facility use? A. Minimum stock- includes a safety factor for replenishing stock B. Maximum stock- equal to a safety stock plus estimated usage (past usage and forecasts) C. Mini-max-stock allowed to deplete to a safety level before a new order is submitted to bring up inventory up to max again D. Par stock-stock brought up to the par level each time an order is placed regardless of the amount on hand at the time of order E. Other-(describe) Choose an appropriate product and determine how much of an item should be ordered. Remember the formula is: Demand during lead time + safety stock = amount to order Cost out an inventory according to data supplied. Remember that to do this, you will need to take an inventory, and will need to…arrow_forwardHuman Relations, Systems, and Organization Assignments ORGANIZATION: Review the organization chart for the facility • Draw an organization chart for the department. • . Identify and explain the relationships of different units in the organization and their importance to maintain the food service department's mission. Include a copy in your weekly submission. There is a feature in PowerPoint for doing this should you want to use it. JOB ORGANIZATION: ⚫ A job description is a broad, general, and written statement for a specific job, based on the findings of a job analysis. It generally includes duties, purpose, responsibilities, scope, and working conditions of a job along with the job's title, and the name or designation of the person to whom the employee reports. Job description usually forms the basis of job specification. • Work with your preceptor or supervisor to identify a position for which you will write a job description. Include a copy of the job description you write in your…arrow_forwardASSIGNMENT: Production Sheet Watch at least 3 workers prepare foods. Write down what they do and the amount of time it takes for them to complete the task. Calculate the production cost. Example: Food Item: Green Beans Time Worker #1 Worker #2 Worker #3 Start End Time (Hours) Time Time Activity Activity Activity (Hours) (Hours) 11:45 am 12:01 pm 0.27 Steam and 0.05 Microwave blenderize pureed frozen green green beans beans 16.25 Total Production Time 3 minutes minutes Hourly Wage $16.07 $12.28 24% Benefits *** $3.86 $2.95 Labor Costs $5.37 $0.76 *** Check with facility to see Benefit %arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningManagement, Loose-Leaf VersionManagementISBN:9781305969308Author:Richard L. DaftPublisher:South-Western College Pub