(a)
Interpretation:The facility layout that would be suitable for printing books.
Concept Introduction:
Facility layout is the way in which different aspects needed for manufacturing a product is being arranged within an organization. Tools and equipment needed for production of various types of products could be arranged in various ways so as to ensure efficiency and effectiveness. The available space, the final output, safety measures that relate to the users and the facility and the smooth run of operations are among the important considerations when deciding upon a suitable facility layout.
(a)

Explanation of Solution
A product layout would be suitable for an organization that prints books. In such a layout, the machines would be arranged in a single line according to the sequence of operations. When the necessary raw materials are being fed into the first machine, it would go through the process and the final product would come out of the last machine. As book printing involves large quantities, as well as each book having to go through the entire process, this would be much suitable. Once the contents of the book is being entered into the system, various work items such as printing, folding, cutting edges, binding et cetera would take place one after the other with regard to each book.
(b)
Interpretation:The facility layout that would be suitable for performing hospital laboratory tests.
Concept Introduction:
The order in which different aspects needed in manufacturing a product has been arranged is known as the facility layout. Tools, equipment and other machinery needed in producing various goods will require to be arranged in various patterns in order to maintain high levels of efficiency and effectiveness. There are some important considerations that are being highlighted in deciding a facility layout. The availability of space, the nature of the final product, safety requirements of staff members and the premises and the ease of operations would be included in such considerations.
(b)

Explanation of Solution
A cellular layout would be appropriate for performing hospital laboratory tests. A cellular layout is one where necessary tools and equipment in relation to a specific product would be grouped into a cell. Each cell would perform specific operations. It would be suitable in laboratory tests as each test would require specific tools and equipment unique to it. Having a cellular layout would ensure that each cell is separate from the rest preventing tools from getting mixed up which could be harmful in a medical setting.
(c)
Interpretation:The facility layout that would be suitable for manufacturing home furniture.
Concept Introduction:
The physical order in which the aspects needed in producing a good are laid out would be called as a facility layout. Equipment, machinery and various tools needed in making various types of goods would be laid in manner suitable so as to maintain efficiency and effectiveness at a highest possible level. The space availability, the nature of the product, safety measures and the convenience of the flow would be considered by responsible parties when deciding a suitable facility layout.
(c)

Explanation of Solution
A process layout would be suitable in manufacturing home furniture. In a process layout, all tools and equipment of a kind would be placed together. For example, in a vehicle service center, the tires would be placed together and the oil cans would be placed together in a different place. This is seen as suitable for manufacturing home furniture as it involves in custom designs. When various tools and equipment such as nails, wood et cetera is stored separately, for each furniture design, the necessary tools could be selected without much hassle.
(d)
Interpretation:The facility layout that would be suitable for a hospital.
Concept Introduction:
A facility layout is the order or the physical setting in which the tools and equipment needed to manufacture a product is being arranged. Such layouts must ensure high levels of efficiency and effectiveness. Aspects such as the availability of space, the nature of the final output, safety requirements of employees and the facility and the smooth flow of work are some important considerations in relation to a facility layout.
(d)

Explanation of Solution
A process layout would be suitable for a hospital. It would arrange tools and equipment of a kind in one place. So within a hospital setting, medicine and other equipment would be stored separately, to be reached out with much ease in catering to various needs of patients. For example, the oxygen cylinders would be placed together and when one is needed for a patient, the staff members know from where they could get one. This makes the process smooth as well as quick which is much needed in such a setting.
(e)
Interpretation:The facility layout that would be suitable for a photography studio.
Concept Introduction:
A facility layout could be defined as the way in which the tools, equipment and machinery needed to produce a good is being physically arranged within an organization. It should be done in a way that efficiency and effectiveness could be maintained at a highest possible level. When deciding upon a facility location, aspects such as space availability, the nature of the final outcome, safety measures and the smoothness of the flow must be taken into consideration.
(e)

Explanation of Solution
A product layout would be appropriate for a photography studio. Within a product layout, the machines or equipment needed would be placed in a single line according to the sequential order in which they would be needed. In a photography studio, the preparation area could be placed first where customers could check themselves on a mirror and get ready accordingly. Next the cameras could be placed. Finally, the computers and other equipment needed in editing and printing the pictures could be placed. This setting would be ideal as for each product or each picture taken; the said steps must be followed.
(f)
Interpretation:The facility layout that would be suitable for a library.
Concept Introduction:
The physical arrangement that has been followed in placing tools, equipment and machinery in an organization is called as the facility layout. This has to be done in a manner that ensures high levels of efficiency and effectiveness. The available space, the nature of the product being offered, the safety measures applicable and the smoothness of the overall process must be taken into account when deciding upon a suitable facility layout.
(f)

Explanation of Solution
A process layout would be suitable for a library. Within such a layout, tools or equipment of a kind would be placed together. In relation to a library, the books would be store together in one place, the reading tables and chairs would be in another place et cetera. A library is expected to be calm and quiet at all times. Hence the said layout would best suit it. When the books are placed together in one place, people could select the books they want and come to the area where the tables and chairs are placed. If the book is being taken outside, the person could follow the relevant procure which could be arranged separately without disturbing the onsite readers.
Want to see more full solutions like this?
Chapter 8 Solutions
OM6 ONLINE-LMS INTEGRATED ACCESS
- what would the reccomended course of action be in the Cervus Equipment Corp., Harvestinga Future case? including a Justification and Integration of recommendations and dentification + use of suitable decision criteriato rank options▪ Development of practical options in relation toidentified issue(s) + prior analysis▪ Qualitative + financial evaluation andcomparison of optionsarrow_forwardwhat would the reccomended course of action be in the Cervus Equipment Corp., Harvestinga Future case?arrow_forwardMaria Gutierrez bought a computer system for $1350. She made a down payment of $ 135 and arranged to make 29 monthly payments of $48.88. After making 20 payments she decided to pay the loan in full. Use the Rule of 78 to determine the unearned interest and the amount necessary to pay the loan in full. The unearned interest is $ (Round to the nearest cent.) Part 2 The amount required to pay the loan in full is $ (Round to the nearest cent.)arrow_forward
- 2. A community health system’s nurse team consists of 12 nurses working in the local community. It takes a nurse 1.5 hours to complete one patient visit (including travel time and breaks). a. What is the capacity of the nurse team over the course of a 9-hour workday? b. Assuming the demand for the nurses is 60 patients per day, what is the utilization of the nurse team? c. Assuming the demand for the nurses is 60 patients per day, what is the cycle time?arrow_forwardLO3-2, 3-4, 3-5 6. Consider the following production process for manufacturing biscuits. The first step of the process is mixing, where all of the ingredients are combined in the correct proportion to form dough. In the next step of the process, the dough is formed into sheets and cut into pieces in preparation for baking. The cut dough is then baked into biscuits and subsequently must be cooled. The final step of the process is packaging the biscuits for the consumer. The following table summarizes the production process along with the processing times at each step of the process. The process is highly automated, so assume that this is a machine-paced process with one machine available at each step. Process Step Mixing Activity Time (Minutes per Batch) Forming Baking Cooling Packing 15 10 12 18 10 a. What is the capacity of the baking process step (in batches per hour)? b. What is the bottleneck of the manufacturing process? c. Assuming unlimited demand, what is the process flow rate…arrow_forwardLO3-1, 3-2, 3-4, 3-5 3. Consider a process consisting of three resources. Assume there exists unlimited demand for the product. a. Resource 1 has a processing time of 6 minutes per unit. b. Resource 2 has a processing time of 3 minutes per unit. c. Resource 3 has a processing time of 5 minutes per unit. All three resources are staffed by one worker. a. Draw a process flow diagram of this process. b. What is the capacity of resource 2? c. What is the bottleneck in the process? d. What is the utilization of resource 2? e. How long does it take the process to produce 200 units starting with an empty system, assuming this is a worker-paced process?arrow_forward
- 1. It takes a barber 15 minutes to serve one customer. a. What is the capacity of the barber expressed in customers per hour? b. Assuming the demand for the barber is two customers per hour, what is the flow rate? c. Assuming the demand for the barber is two customers per hour, what is the utilization? d. Assuming the demand for the barber is two customers per hour, what is the cycle time?arrow_forward12 points) Jonathon's Restaurant is looking to open a new location. Caitlin Elizabeth has been developing a project plan and has identified tasks, precedence relations, and normal task durations shown in the table below: Assuming an indirect and overhead cost rate of 115, find the makespan and cost for a standard Early Start schedule: Makespan: Cost: Because Caitlin has studied project management at the University of Portland, she knows that a wise project manager should consider the trade-off between indirect/overhead costs and direct resource costs when establishing the "baseline" schedule. Assuming indirect/overhead costs of $115 per period and the direct compression costs and compression limits shown in the table above, find the following: Makespan: Cost: Compression strategy (enter answer as a vector: begin with "<", comma separated values, end with ">", e.g. < 0, 0, 5, ..., 2, 0>): Evidently this project is a very high priority project for Caitlin's boss.…arrow_forwardProblem 1. (2 points) Jimbo's Java & Jerk is looking to implement a new labor scheduling system. Colin Alexander has been developing a project plan and has identified the following tasks, precedence relations, and normal task durations. Because Colin has studied project management at the University of Portland, he knows that the he should incorporate a time buffer into any estimates for the project's makespan. If Colin wants to quote a 90% makespan: Quoted Makespan = Time Buffer = Note: state all answers to two decimal places.arrow_forward
- 1 point) Saint Teresa's Hospital is looking to implement a new ERP system. Ray Bones has been developing a project plan and has identified the following tasks, precedence relations, and normal task durations. Ray has studied project management at the University of Portland and knows that the starting and ending time of any task may be determined from the information in the table using the critical path method. Assume the following notation when answering the questions below: Please provide the CPM result for each of the following metrics:arrow_forwardWhy might there be commonalities or patterns in the retail industry between gross margin percentage and inventory turns with references?arrow_forwardIs there a pattern between gross margin percentage and inventory turns in the retail industry?arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage Learning
- MarketingMarketingISBN:9780357033791Author:Pride, William MPublisher:South Western Educational Publishing