
Elementary Surveying: An Introduction To Geomatics (15th Edition)
15th Edition
ISBN: 9780134604657
Author: Charles D. Ghilani
Publisher: PEARSON
expand_more
expand_more
format_list_bulleted
Concept explainers
Textbook Question
Chapter 7, Problem 7.13P
For a bearing DE = NUS 5 53’56 ”WT and angles to the right, compute the bearing of PG if angle DEF 2 88°12’99” and EFG 2 40°20’30”.
Expert Solution & Answer

Learn your wayIncludes step-by-step video

schedule07:02
Students have asked these similar questions
1- A two-lane highway (two 3.6 m lanes) has a posted speed limit of 100 km/h and, on
one section, has both horizontal and vertical curves, as shown in the figure below. A
recent daytime crash (driver traveling westbound and striking a stationary roadway
object) resulted in a fatality and a lawsuit alleging that the 100 km/h posted speed
limit is an unsafe speed for the curves in question and was a major cause of the crash.
Evaluate and comment on the roadway design (after Mannering and Washburn).
Plan view (horizontal alignment)
PC
Station 4+90
Profile view (vertical alignment)
e = 8.0%
100 m
Sight
obstruction
50°
G₁ = -2.0%
PVC
Station 4+30
T
PVI
PVT
Station 6+80
PT
N
Station 10+00
G₂ = +4.0%
Existing Filter Design Parameters at 22.5 MGD:
A) # of Filters: 5
B) #Bays per Filter: 1
C) Bay Surface Dimensions (L X W X D): (40.5 ft. X 13 ft. X 11.5 ft.)
D) Surface Area per Filter: 526.5 ft^2
E) Total Filtration Area: 2,633 ft^2
F) Hydraulic Loading Rate: 6 gpm/sf (w/ all filters in service)
G) Filtration Capacity at HLR: 22.7 MGD
H) Filter Media:
1) Anthracite: 20 in. depth, 1.00 mm Effective Size
2) Sand: 9 in. depth, 0.50 mm Effective Size
1) L/d Ratio (depth of media/effective size): 965
J) Backwash Pumps: 15 MGD (two pumps)
K) Backwash water for the filters is provided from the high service pump
station through a 24-inch backwash water
L) Air Wash Blowers:
1) Number: 2 Hoffman Centrifugal Model 38406A, 125 hp
2) Capacity: 3,100 scfm (standard cubic ft/^2)
3) Air Scour Rate: 5.90 scfm/ft^2
Deliverables:
1) Determine if the existing filtration system is sufficient to accommodate the
projected future capacity.
A) Current Capacity: 22.5 MGD
B) Future Capacity: 34.5 MGD for…
Part 1: True or False. Indicate whether the following statements are True (T) or False (F) by encircling
the letter that corresponds to your answer.
1. (T/F) Residual soils are formed by the weathering of rocks in place.
2. (T/F) The Standard Penetration Test (SPT) provides a disturbed soil sample.
3. (T/F) The groundwater table has no effect on the interpretation of soil exploration data.
4. (T/F) Geophysical methods are always more accurate than direct soil sampling methods.
5. (T/F) The N-value in the SPT is the number of blows required to drive the sampler the first 150
mm.
Part 2: Multiple choice. Choose the best answer for each question.
1. Which of the following is NOT a transported soil deposit?
a) Alluvial
b) Glacial
c) Residual
d) Aeolian
2. What is the primary purpose of subsurface exploration?
a) To determine the depth of bedrock
b) To identify soil types and their properties
3. Which test provides a continuous profile of soil
a) Standard Penetration Test (SPT)
b) Cone…
Chapter 7 Solutions
Elementary Surveying: An Introduction To Geomatics (15th Edition)
Ch. 7 - Define the different reference meridians that can...Ch. 7 - Prob. 7.2PCh. 7 - Why is it important to adopt a standard angle...Ch. 7 - Prob. 7.4PCh. 7 - Prob. 7.5PCh. 7 - In Problems 7.6 through 7.? I9, convert the...Ch. 7 - Prob. 7.7PCh. 7 - Prob. 7.8PCh. 7 - Prob. 7.9PCh. 7 - Prob. 7.10P
Ch. 7 - Prob. 7.11PCh. 7 - Prob. 7.12PCh. 7 - For a bearing DE = NUS 5 53’56 ”WT and angles to...Ch. 7 - ?.14 Similar to Problem ?.13 El, except the...Ch. 7 - Prob. 7.15PCh. 7 - Course AB of a ?ve-sided traverse runs due north....Ch. 7 - Prob. 7.17PCh. 7 - Prob. 7.18PCh. 7 - Prob. 7.19PCh. 7 - Prob. 7.20PCh. 7 - Prob. 7.21PCh. 7 - Prob. 7.22PCh. 7 - Prob. 7.23PCh. 7 - Prob. 7.24PCh. 7 - Prob. 7.25PCh. 7 - Prob. 7.26PCh. 7 - Prob. 7.27PCh. 7 - Prob. 7.28PCh. 7 - Prob. 7.29PCh. 7 - For Problems 7.30 through 7.32 the observed...Ch. 7 - Prob. 7.31PCh. 7 - Prob. 7.32PCh. 7 - Prob. 7.33PCh. 7 - Prob. 7.34PCh. 7 - Prob. 7.35PCh. 7 - Prob. 7.36PCh. 7 - Prob. 7.37PCh. 7 - Prob. 7.38P
Additional Engineering Textbook Solutions
Find more solutions based on key concepts
The strain at point A on the bracket has components x = 300(106), y = 550(106), xy = 650(106), z = 0, Determine...
Mechanics of Materials (10th Edition)
Write a recursive method that will duplicate each character in a string and return the result as a new string. ...
Java: An Introduction to Problem Solving and Programming (8th Edition)
Give an example of each of the following, other than those described in this chapter, and clearly explain why y...
Modern Database Management
(Factorials) Factorials are used frequently in probability problems. The factorial of a positive integer n (wri...
Java How to Program, Early Objects (11th Edition) (Deitel: How to Program)
_____ are characters or symbols that perform operations on one or more operands.
Starting Out With Visual Basic (8th Edition)
Population Write a program that will predict the size of a population of organisms. The program should ask the ...
Starting Out with C++ from Control Structures to Objects (9th Edition)
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- Determin the shear and moment in teh beam as a function of x where 2m<x<4m.arrow_forwardEncuentra las fuerzas internas de todos los elementos en las siguientes armaduras por el método de nodosarrow_forwardGiven a side slope of 2:1, a road width of 10 m and cross-sectional area of 36.4 sq m, for the following cross-sectional notes: 9.8..........0...........x2 y1..........y..........1.2 Determine the value of y.arrow_forward
- From station A with center height for 1.4m in fill, the ground makes a uniform slope of 5% to station B whose center height is 2.8 m in cut. Assuming both sections to be level sections having a width of roadway of 14 m and a side slope of 2:1 for both cut and fill, compute the cross-sectional area of fill 48 m from station A. Distance from station A to station B is 60 m.arrow_forwardFrom station 10+100 with center heights of 2 m in fill, the ground line makes a uniform slope of 4.8% to station 10+150 whose center heights is 1.2 m in cut. 1. Determine the slope of a new roadway to be constructed. 2. Determine the distance from station 10+150, will the excavation extend. 3. Determine the area of fill 10 m from 10+100 if the width of roadway is 8 m and the side slope is 1:2.arrow_forwardFunding Plan How much funds required to reach to the next level of the venture? • ? How much have been bootstrapped? If not, why? • ? How much can be bootstrapped? • ? How much external funding required? If not, why? • ? Funds utilization strategy (Details) • ? • ? • ? • ? • ? • ? • • ? ? ? ? ? Place your logo herearrow_forward
- A semicircular 40 ft diameter− − tunnel is to be built under a150 ft deep− − , 800 ft long− − lake, as shown below. a) Determine the horizontal, vertical, and resulting hydrostatic forces acting on this tunnel. (Answer: 8 8 8 1.398 10 , 2.596 10 , 2.64 10H y netF lbf F lbf F lbf= × = × = × ) b) Calculate the hydrostatic force on the bottom of the lake if the tunnel was not there, and compare it with the total (resulting) hydrostatic force that you calculated in part (a). (Answer: 8 2.995 10VF lbf= × ) c) As the design engineer of this tunnel would you take the hydrostatic force on the bottom of the lake as a rough estimate of the resulting hydrostatic force acting on this tunnel. Discuss your decision.arrow_forward3.2 Consi parabolic equation (Eq. 3.1) 3.3 Again consider Example 3.4. Does this curve provide sufficient stopping sight distance for a speed of 60 mi/h? -tangent grade with a -1% final mi/h. The station of the 1203 ft. What is the elev 3.4 An equal-tangent crest vertical curve is designed for 70 mi/h. The high point is at elevation 1011.4 ft. The initial grade is +2% and the final grade is -1%. What is the elevation of the PVT? +00? 3.10 An equal-tangent w 2012 (to 2011 AASHTO of 70 mi/h to connec -2.1%. The curve is design speed in th technology has adv design deceleration value used to dev percentage of ol design reaction vehicles have b height is assun roadway obje 3.5 An equal-tangent crest curve has been designed for 70 mi/h to connect a +2% initial grade and a -1% final grade for a new vehicle that has a 3 ft driver's eye height; the curve was designed to avoid an object that is 1 ft high. Standard practical stopping distance design was used but, unlike current design standards,…arrow_forwardFactor of Safety Activity The lap joint is connected by three 20-mm diameter rivets. Assuming that the applied allowable load, P=50kN is distributed equally among the three rivets and a factor of safety of 1.5, find: (a) the failure shear stress in a rivet, and (b) failure bearing stress between the plate and rivet 25 mm 25 mmarrow_forward
- Draw the shear and moment diagrams of the beam CDE showing all calculations. Assume the support at A is a roller and B is a pin. There are fixed connected joints at D and E. Assume P equals 9.6 and w equals 0.36arrow_forwardFind the length of the diagonal on the x-z plane (square root of square of sides). Find angle between the vector F and its projection on x-z (the diagonal defined above). Find Horizontal Projection of F on x-z plane, Fh, and vertical component, FY. Find projections of Fh, to define in-plane components Fx and Fz. Show that results match those of Problem 2(a) above. (2,0,4) F₂ 100 N (5, 1, 1)arrow_forwardFor the control system Draw Nyquist Plot with Solution G(S)= 63.625 (S+1)(S+3) S(S+2)(5+65+18) (5+5)arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Principles of Geotechnical Engineering (MindTap C...Civil EngineeringISBN:9781305970939Author:Braja M. Das, Khaled SobhanPublisher:Cengage LearningFundamentals of Geotechnical Engineering (MindTap...Civil EngineeringISBN:9781305635180Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning
- Engineering Fundamentals: An Introduction to Engi...Civil EngineeringISBN:9781305084766Author:Saeed MoaveniPublisher:Cengage LearningTraffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage LearningResidential Construction Academy: House Wiring (M...Civil EngineeringISBN:9781337402415Author:Gregory W FletcherPublisher:Cengage Learning

Principles of Geotechnical Engineering (MindTap C...
Civil Engineering
ISBN:9781305970939
Author:Braja M. Das, Khaled Sobhan
Publisher:Cengage Learning

Fundamentals of Geotechnical Engineering (MindTap...
Civil Engineering
ISBN:9781305635180
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning


Engineering Fundamentals: An Introduction to Engi...
Civil Engineering
ISBN:9781305084766
Author:Saeed Moaveni
Publisher:Cengage Learning

Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning

Residential Construction Academy: House Wiring (M...
Civil Engineering
ISBN:9781337402415
Author:Gregory W Fletcher
Publisher:Cengage Learning