What is the difference between a square footing and a continuous footing, and when would each type be used?

Expert Solution & Answer
Check Mark
To determine

The difference between a square footing and continuous footing and the use of each footing.

Explanation of Solution

SQUARE FOOTINGCONTINOUS FOOTING
  • It is generally used to support load on a centrally located column.
  • It is used to support a load bearing wall.
  • It is analogous to a cube.
  • It is analogous to a sidewalk.
  • Commonly provided when the columns are not closely spaced, and the soil regime is homogeneous.
  • They are provided when the row of columns is more closely spaced.
  • It is simple, economical and most widely used footing.
  • It is more economical to use continuous footing than to provide a Square footing in one queue.

Square footing:

They are usually used to hold poles such as large electric poles, porch columns, etc.

Continuous footing:

These are usually used around the basement/foundation of a structure to keep moisture out.

Want to see more full solutions like this?

Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
02:38
Students have asked these similar questions
On page 1, in the first body paragraph ("In the United States…to be smart."), edit the Kaya source so the Name of Web Page is "Fast Facts 2020: Demographics", the correct Name of the webpage.
4.12 A 400 m vertical curve connects a -2.00% grade to a +4.00% grade. The P.I. is located at station 150 + 00 and elevation 60.00 m above sea level. A pipe is to be located at the low point on the vertical curve. The roadway at this point consists of two 3.6 m lanes with a normal crown slope of 2%. If the lowest point on the surface of the road- way must clear the pipe by 0.75 m, what is the station and maximum elevation of the pipe?
=7.5 in., d1 = 1.5 in., b2 = 0.75 in., d2= 6.0 in., b3 = 3.0 in., and d3 = 2.0 in. Determine (a) the centroid location in inches from the bottom surface. Round off to two decimal places. M H b₂ y ... d₁ M by dy X
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Construction Materials, Methods and Techniques (M...
Civil Engineering
ISBN:9781305086272
Author:William P. Spence, Eva Kultermann
Publisher:Cengage Learning
Text book image
Architectural Drafting and Design (MindTap Course...
Civil Engineering
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Cengage Learning
Text book image
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,
Text book image
Principles of Geotechnical Engineering (MindTap C...
Civil Engineering
ISBN:9781305970939
Author:Braja M. Das, Khaled Sobhan
Publisher:Cengage Learning
Text book image
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Text book image
Fundamentals of Geotechnical Engineering (MindTap...
Civil Engineering
ISBN:9781305635180
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning