Chapter 5.5, Problem 31P
Summary Introduction
To modify: The spreadsheet model.
Introduction: In linear programming, the unbounded solution would occur when the objective function is infinite. If no solution satisfied the constraints, then it is said to be an unfeasible solution.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
Chapter 5. (M/M/s/K Model). Leia is responsible for 13 data units in the IT offices in a small business called DataWish. Each data unit runs on an average for 3 weeks and requires an average of ½ or 0.5 weeks to get reset by Leia before it can start up again. If we assign the Poisson distribution to the “arrival” of each data unit for service and an exponential distribution to the actual service provided, answer the following questions:
a. The arrival rate would be units per week and the service rate would be units per week.
b. Calculate the following operating characteristics for the M/M/s/K system:
Utilization Factor (ρ)
%
Performance Measures
P0 (probability that sytem is empty)
%
L (average units in system)
units
Lq (average units waiting in queue)
units
W (average time in the system)
weeks
Wq (average time in the queue)
weeks
c. If we assign a cost of waiting as $400 per week per data unit and $800 per…
Chapter 5. (M/M/s/K Model). Leia is responsible for 8 computers in the IT offices in a small business called
DataWish. Each computer runs on an average for 3 weeks and requires an average of ½ or 0.5 weeks to get reset
by Leia before it can start up again. If we assign the Poisson distribution to the "arrival" of each computer for
service and an exponential distribution to the actual service provided, answer the following questions:
a. The arrival rate would bel
units per week and the service rate would be
units per week.
b. Calculate the following operating characteristics for the M/M/s/K system:
Utilization Factor (p)
Performance
Measures
c. If we assign a cost of waiting as $500 per week per
computer and $800 per week of hiring Leia, what is the
Total Time Cost per week cost of servicing the
machines?
PO (probability that
sytem is empty)
%
dollars
L (average units in
system)
units
d. If DataWish decides to hire another individual to
help Leia, what would the new Total Time Cost per…
Chapter 5. (M/M/s/K Model). Leia is responsible for 8 computers in the IT offices in a small business called DataWish. Each computer runs on an
average for 3 weeks and requires an average of ½ or 0.5 weeks to get reset by Leia before it can start up again. If we assign the Poisson distribution
to the "arrival" of each computer for service and an exponential distribution to the actual service provided, answer the following questions:
a. The arrival rate would be
units per week and the service rate would be
units per week.
b. Calculate the following operating characteristics for the M/M/s/K system:
Utilization Factor (p)
%
Performance Measures
PO (probability that sytem
is empty)
L (average units in
units
system)
La (average units waiting
in queue)
units
W (average time in the
weeks
system)
Wq (average time in the
queue)
weeks
c. If we assign a cost of waiting as $500 per week per computer and $800 per week of hiring Leia, what is the Total Time Cost per week cost of
servicing the…
Chapter 5 Solutions
EBK PRACTICAL MANAGEMENT SCIENCE
Ch. 5.2 - Prob. 1PCh. 5.2 - Prob. 2PCh. 5.2 - Prob. 3PCh. 5.2 - Prob. 4PCh. 5.2 - Prob. 5PCh. 5.2 - Prob. 6PCh. 5.2 - Prob. 7PCh. 5.2 - Prob. 8PCh. 5.2 - Prob. 9PCh. 5.3 - Prob. 10P
Ch. 5.3 - Prob. 11PCh. 5.3 - Prob. 12PCh. 5.3 - Prob. 13PCh. 5.3 - Prob. 14PCh. 5.3 - Prob. 15PCh. 5.3 - Prob. 16PCh. 5.3 - Prob. 17PCh. 5.3 - Prob. 18PCh. 5.4 - Prob. 19PCh. 5.4 - Prob. 20PCh. 5.4 - Prob. 21PCh. 5.4 - Prob. 22PCh. 5.4 - Prob. 23PCh. 5.4 - Prob. 24PCh. 5.4 - Prob. 25PCh. 5.4 - Prob. 26PCh. 5.4 - Prob. 27PCh. 5.4 - Prob. 28PCh. 5.4 - Prob. 29PCh. 5.5 - Prob. 30PCh. 5.5 - Prob. 31PCh. 5.5 - Prob. 32PCh. 5.5 - Prob. 33PCh. 5.5 - Prob. 34PCh. 5.5 - Prob. 35PCh. 5.5 - Prob. 36PCh. 5.5 - Prob. 37PCh. 5.5 - Prob. 38PCh. 5 - Prob. 42PCh. 5 - Prob. 43PCh. 5 - Prob. 44PCh. 5 - Prob. 45PCh. 5 - Prob. 46PCh. 5 - Prob. 47PCh. 5 - Prob. 48PCh. 5 - Prob. 49PCh. 5 - Prob. 50PCh. 5 - Prob. 51PCh. 5 - Prob. 52PCh. 5 - Prob. 53PCh. 5 - Prob. 54PCh. 5 - Prob. 55PCh. 5 - Prob. 56PCh. 5 - Prob. 57PCh. 5 - Prob. 58PCh. 5 - Prob. 59PCh. 5 - Prob. 60PCh. 5 - Prob. 61PCh. 5 - Prob. 62PCh. 5 - Prob. 63PCh. 5 - Prob. 64PCh. 5 - Prob. 65PCh. 5 - Prob. 66PCh. 5 - Prob. 67PCh. 5 - Prob. 68PCh. 5 - Prob. 69PCh. 5 - Prob. 70PCh. 5 - Prob. 71PCh. 5 - Prob. 72PCh. 5 - Prob. 73PCh. 5 - Prob. 74PCh. 5 - Prob. 75PCh. 5 - Prob. 76PCh. 5 - Prob. 77PCh. 5 - Prob. 80PCh. 5 - Prob. 81PCh. 5 - Prob. 82PCh. 5 - Prob. 83PCh. 5 - Prob. 85PCh. 5 - Prob. 86PCh. 5 - Prob. 87PCh. 5 - Prob. 2C
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Problem 14-17 (Algo) Meritor, a company that makes muffler assemblies for the automotive industry, is committed to the use of kanban to pull material through its manufacturing cells. Meritor has designed each cell to fabricate a specific family of muffler products. Fabricating a muffler assembly involves cutting and bending pieces of pipe that are welded to a muffler and a catalytic converter. The mufflers and catalytic converters are pulled into the cell based on current demand. The catalytic converters are made in a specialized cell. Catalytic converters are made in batches of 15 units and are moved in special hand carts to the fabrication cells. The catalytic converter cell is designed so that different types of catalytic converters can be made with virtually no setup loss. Meritor hires a team of consultants. The consultants suggest a partial robotic automation as well as the safety stock to be 15 percent. Meritor implements these suggestions. The result is an increase in…arrow_forwardProblem 14-17 (Algo) Meritor, a company that makes muffler assemblies for the automotive industry, is committed to the use of kanban to pull material through its manufacturing cells. Meritor has designed each cell to fabricate a specific family of muffler products. Fabricating a muffler assembly involves cutting and bending pieces of pipe that are welded to a muffler and a catalytic converter. The mufflers and catalytic converters are pulled into the cell based on current demand. The catalytic converters are made in a specialized cell. Catalytic converters are made in batches of 15 units and are moved in special hand carts to the fabrication cells. The catalytic converter cell is designed so that different types of catalytic converters can be made with virtually no setup loss. Meritor hires a team of consultants. The consultants suggest a partial robotic automation as well as the safety stock to be 12.5 percent. Meritor implements these suggestions. The result is an increase in…arrow_forwardChapter 5. (M/M/s/K Model). Leia is responsible for 12 dataunits in the IT offices in a small business called DataWish. Each dataunit runs on an average for 3 weeks and requires an average of ½ or 0.5 weeks to get reset by Leia before it can start up again. If we assign the Poisson distribution to the "arrival" of each dataunit for service and an exponential distribution to the actual service provided, answer the following questions: a. The arrival rate would be units per week and the service rate would be units per week. b. Calculate the following operating characteristics for the M/M/S/K system: Utilization Factor (p) % Performance Measures PO (probability that sytem is empty) % L (average units in system) units Lq (average units waiting in queue) units W (average time in the weeks system) Wq (average time in the queue) weeks c. If we assign a cost of waiting as $400 per week per dataunit and $800 per week of hiring Leia, what is the Total Time Cost per week cost of servicing the…arrow_forward
- Please do not give solution in image format thankuarrow_forward72arrow_forwardHelp pleasee 15) Mining Company operates two mines for the purpose of extracting gold and silver. The Saddle Mine costs $26,000/day to operate, and it yields 50 oz of gold and 3000 oz of silver each of x day. The Horseshoe Mine costs $16,000/day to operate, and it yields 75 oz of gold and 1000 oz of silver each of y day. Company management has set a target of at least 650 oz of gold and 18,000 oz of silver. (a) How many days should each mine be operated so that the target can be met at a minimum cost?The minimum is C = at (x, y) = Suppose C = cx + 16,000y. Find the range of values that the Saddle Mine's daily operating cost, the coefficient c of x, can assume without changing the optimal solution.≤ CI Find the range of values that the requirement for gold can assume.≤ (requirement for gold) ≤ Find the shadow price for the requirement for gold. (Round your answer to the nearest cent.)arrow_forward
- 4.Silicon Valley Transport Commission (SVTC) has a fleet of maintenance vehicles that includes cars, vans, and trucks. SVTC is currently evaluating four different approaches to help them maintain their fleet of cars and vans efficiently at the lowest possible cost. Their options are: (1) No preventive maintenance at all and repair vehicle components when they fail; (2) Take oil samples at regular intervals and perform whatever preventive maintenance is indicated by the oil analysis; (3) Perform an oil change on a regular basis on each vehicle and perform repairs when needed; (4) perform oil changes at regular intervals, take oil samples regularly, and perform maintenance repairs as indicated by the sample analysis. Option #1 costs nothing to implement and results in two possible outcomes: There is a .10 probability that a defective component will occur, requiring emergency maintenance at a cost of $1,200, or there is a chance that no defects will occur and no maintenance will be…arrow_forward9. Dana is 30 years old and owns a wedding planning business. She takes care of all wedding events details from arranging flowers, tables, theme to catering food to a high standard. She has a good reputation in the market. Recently, she discovered another food catering company with wider varieties and lower prices that her customers will love to have. Thus, she decided to write a negative letter to the current catering company to inform them about terminating their business together. Dana has to plan her negative letter very carefully and to explain the needs of her customers: * A.to avoid responsibility for the message B.to improve future performance on the part of the sender C.to avoid adding a personal message to the recipient D.to gain control of the context of the message E.to minimize damage to the business relationshiparrow_forwardProblem 16-15 (Algorithmic) Strassel Investors buys real estate, develops it, and resells it for a profit. A new property is available, and Bud Strassel, the president and owner of Strassel Investors, believes if he purchases and develops this property it can then be sold for $160,000. The current property owner has asked for bids and stated that the property will be sold for the highest bid in excess of $100,000. Two competitors will be submitting bids for the property. Strassel does not know what the competitors will bid, but he assumes for planning purposes that the amount bid by each competitor will be uniformly distributed between $100,000 and $150,000. Develop a worksheet that can be used to simulate the bids made by the two competitors. Strassel is considering a bid of $130,000 for the property. Using a simulation of 1000 trials, what is the estimate of the probability Strassel will be able to obtain the property using a bid of $130,000? Round your answer to 1 decimal place.…arrow_forward
- Problem 2-4 (Algo) A company that makes shopping carts for supermarkets and other stores recently purchased some new equipment that reduces the labor content of the jobs needed to produce the shopping carts. Prior to buying the new equipment, the company used 5 workers, who together produced an average of 80 carts per hour. Workers receive $12 per hour, and machine cost was $30 per hour. With the new equipment, it was possible to transfer one of the workers to another department, and equipment cost increased by $11 per hour, while output increased by 5 carts per hour. a. Compute labor productivity under each system. Use carts per worker per hour as the measure of labor productivity. (Round your answers to 3 decimal places.) Before After b. Compute the multifactor productivity under each system. Use carts per dollar cost (labor plus equipment) as the measure. (Round your answers to 3 decimal places.) Before After carts per worker per hour carts per worker per hour Labor productivity…arrow_forwardIs my solution correct and did I fully answer the questions? (see attachment for my solution) Question: There are three factories on Momiss River. Each emits two types of pollutants, labeled P1 and P2, into the river. If the waste from each factory is processed, the pollution in the river can be reduced. It costs $1,500 to process a ton of factory 1 waste, and each ton processed reduces the amount of P1 by 0.10 ton and the amount of P2 by 0.45 ton. It costs $2,500 to process a ton of factory 2 waste, and each ton processed reduces the amount of P1 by 0.20 ton and the amount of P2 by 0.25 ton. It costs $3,000 to process a ton of factory 3 waste, and each ton processed reduces the amount of P1 by 0.40 ton and the amount of P2 by 0.50 ton. The state wants to reduce the amount of P1 in the river by at least 125 tons and the amount of P2 by at least 175 tons. a. Use Solver to determine how to minimize the cost of reducing pollution by the desired amounts. Are the LP assumptions…arrow_forwardSolve the question below using the attached excel templates with formulas for renting both slow and fast copies (labeled in the excel tabs). Question: The Decision Sciences Department is trying to determine whether to rent a slow or a fast copier. The department believes that an employee’s time is worth $15 per hour. The slow copier rents for $4 per hour, and it takes an employee an average of 10 minutes to complete copying. The fast copier rents for $15 per hour, and it takes an employee an average of six minutes to complete copying. On average, four employees per hour need to use the copying machine. (Assume the copying times and interarrival times to the copying machine are exponentially distributed.) Which machine should the department rent to minimize expected total cost per hour?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,