Practical Management Science
6th Edition
ISBN: 9781337671989
Author: WINSTON
Publisher: Cengage
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 5, Problem 75P
Summary Introduction
To set: The network flow model.
Introduction: In linear programming, the unbounded solution would occur when the objective function is infinite. If no solution satisfied the constraints then it is said to be unfeasible solution.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
What factors determine whether a person chooses car or bus to travel to work? That is an interesting
question. Suppose that you analyze this simple transportation problem using the probit model. The
variables in the model are defined as follows:
autotime
commute time via auto, minutes
commute time via bus, minutes
=(bus time - auto time)/10, 10 minute units
= 1 if auto chosen
bustime
dtime
auto
The probit model you estimate is
P(AUTO = 1) = ¤(ß1 + B2DTIME).
The estimates of the parameters are: -0.0788 + 0.400DTIME.
The marginal effect of increasing public (bus) transportation time, given that travel via public
transportation currently takes 15 minutes longer than auto travel is
A) 0.348
B) 0.139
C) 0.307
D) 0.123
E) None of the above (A, B, C, D) is close to be correct.
Discuss how the principle of queues can be used when designing queueing schemes to reduce overall service costs?
Approximately 40 percent of a medical clinic’s weekly incoming calls for doctors’ appointments occur on Monday. Due to this large workload, 20 percent of the callers receive a busy signal and have to call back later. The clinic has one clerk for each two departments to handle incoming calls. Each clerk handles calls for the same departments all week and thus is familiar with the doctors’ hours, scheduling practices, and idiosyncrasies. Consider the following alternatives to solve thi problem: ∙ Continue the present system, which results in some customer inconvenience, loss of business, and perceived poor service. About 1000 patients attempt to call the clinic on Mondays. The clinic has 50,000 patients in all. ∙ Expand the phone lines and add more people to handle the peak load. The estimated cost for adding two more lines and two clerks is $60,000 per year. ∙ Install a computer to speed up appointments. In this case, the peak load could be handled with the current personnel. The…
Chapter 5 Solutions
Practical Management Science
Ch. 5.2 - Prob. 1PCh. 5.2 - Prob. 2PCh. 5.2 - Prob. 3PCh. 5.2 - Prob. 4PCh. 5.2 - Prob. 5PCh. 5.2 - Prob. 6PCh. 5.2 - Prob. 7PCh. 5.2 - Prob. 8PCh. 5.2 - Prob. 9PCh. 5.3 - Prob. 10P
Ch. 5.3 - Prob. 11PCh. 5.3 - Prob. 12PCh. 5.3 - Prob. 13PCh. 5.3 - Prob. 14PCh. 5.3 - Prob. 15PCh. 5.3 - Prob. 16PCh. 5.3 - Prob. 17PCh. 5.3 - Prob. 18PCh. 5.4 - Prob. 19PCh. 5.4 - Prob. 20PCh. 5.4 - Prob. 21PCh. 5.4 - Prob. 22PCh. 5.4 - Prob. 23PCh. 5.4 - Prob. 24PCh. 5.4 - Prob. 25PCh. 5.4 - Prob. 26PCh. 5.4 - Prob. 27PCh. 5.4 - Prob. 28PCh. 5.4 - Prob. 29PCh. 5.5 - Prob. 30PCh. 5.5 - Prob. 31PCh. 5.5 - Prob. 32PCh. 5.5 - Prob. 33PCh. 5.5 - Prob. 34PCh. 5.5 - Prob. 35PCh. 5.5 - Prob. 36PCh. 5.5 - Prob. 37PCh. 5.5 - Prob. 38PCh. 5 - Prob. 42PCh. 5 - Prob. 43PCh. 5 - Prob. 44PCh. 5 - Prob. 45PCh. 5 - Prob. 46PCh. 5 - Prob. 47PCh. 5 - Prob. 48PCh. 5 - Prob. 49PCh. 5 - Prob. 50PCh. 5 - Prob. 51PCh. 5 - Prob. 52PCh. 5 - Prob. 53PCh. 5 - Prob. 54PCh. 5 - Prob. 55PCh. 5 - Prob. 56PCh. 5 - Prob. 57PCh. 5 - Prob. 58PCh. 5 - Prob. 59PCh. 5 - Prob. 60PCh. 5 - Prob. 61PCh. 5 - Prob. 62PCh. 5 - Prob. 63PCh. 5 - Prob. 64PCh. 5 - Prob. 65PCh. 5 - Prob. 66PCh. 5 - Prob. 67PCh. 5 - Prob. 68PCh. 5 - Prob. 69PCh. 5 - Prob. 70PCh. 5 - Prob. 71PCh. 5 - Prob. 72PCh. 5 - Prob. 73PCh. 5 - Prob. 74PCh. 5 - Prob. 75PCh. 5 - Prob. 76PCh. 5 - Prob. 77PCh. 5 - Prob. 80PCh. 5 - Prob. 81PCh. 5 - Prob. 82PCh. 5 - Prob. 83PCh. 5 - Prob. 85PCh. 5 - Prob. 86PCh. 5 - Prob. 87PCh. 5 - Prob. 1C
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- A fertilizer manufacturer has to fulfill supply contracts to its two main customers (650 tons to Customer A and 800 tons to Customer B). It can meet this demand by shipping existing inventory from any of its three warehouses. Warehouse 1 has 400 tons of inventory onhand, Warehouse 2 (W2) has 500 tons, and Warehouse 3 (W3) has 600 tons. The company would like to arrange the shipping for the lowest cost possible, where the per-ton transit costs are as follows: W 1 W 2 W 3 $7.50 $6.75 $6.25 $7.00 $6.50 $8.00 Customer A Customer B Write the objective function and the constraint in equations. Let V;= tons shipped to customer i from warehouse j, and so on. For example, VA1 = tons shipped to customer A from warehouse W1. This exercise contains only parts b, c, d, e, and f. b) The objective function for the LP model = Minimize Z = $7.50 + $6.25 + $6.50 (shipping cost to customer A) V + $6.75 + $7.00 + $8.00 (shipping cost to customer B) c) Subject to: Customer A's demand Customer B's demand…arrow_forwardAn IP address is divided into 2 parts: one for the network ID and one for the computer (host) number * True Falsearrow_forwardAnswer correctly using excel and show workingsarrow_forward
- An emergency room (ER) at a Prisma Health Hospital has 10 total beds it can hold patients, i.e., the capacity of the queueing system of this ER is 10. Patients arrive to the ER at a rate of 5 per hour. Therefore, we have that λn = 6 for n = 0, 1, . . . , 9 and λ10 = 0 for this queueing system. A patient is seen by an ER doctor as the ‘service’ of this queueing system. The amount of time required for an ER doctor to treat a patient is exponentially distributed with a mean of .4 hours. We seek the minimum number of ER doctors so that the expected time of a patient waiting to be seen (so the Wq) is less than or equal to 15 minutes (.25 hours). You should begin by analyzing s = 1 and show any calculations that were used to determine Wq for each number of servers that you considered until you meet the target metric.arrow_forwardA call center employs 1,425 agents. Every month 57 employees leave the company and 57 new employees are hired. a. How long on average does an agent work for this call center (in months) Suppose the cost of hiring and training a new agent is $1,140. The manager of this call center believes that increasing agents’ salaries would keep them working longer at the company. The manager wants to increase the average time that an agent works for the call center to 36 months, or three years. b-1. Given the current average working time for agents at this call center, determine the current annual cost for hiring and training. b-2. Assuming the average time that an agent works for the call center is increased to 36 months, determine the new annual cost for hiring and training. b-3. If the time an agent works for the call center is increased to 36 months on average, how much could the company save on hiring and training costs over a year?arrow_forwardManning Systems is a commercial software vendor that sells billing and other financial software to companies around the globe. Manning operates a centralized call center for customer support calls. Costs associated with use of the center are charged to the division with primary responsibility for the client. There are four geographical divisions: North America (NA), Central and South America (SA), Europe, and Asia-Pacific (APAC). The allocation is based on the length of time of calls made (Minutes). Idle time of the reservation agents and the fixed cost of the equipment are allocated based on the number of calls received (Calls) from clients in each division. Due to recent increased competition in the commercial software business, Manning has decided that it is necessary to better allocate its costs in order to price its services competitively and profitably. During the most recent period for which data are available, the use of the call center for each division was as follows:…arrow_forward
- PepsiCo sells its soft drinks in approximately 400,000 retail establishments, such as supermarkets, discount stores, and convenience stores. Sales representatives call on each retail account weekly, which means each account is called on by a sales rep 52 times per year. The average length of a sales call is 75 minutes (or 1.25 hours). An average salesperson works 2,000 hours per year (50 weeks per year * 40 hours perweek), but each spends 10 hours a week on nonselling activities, such as administrative tasks and travel. How many salespeople does PepsiCo need?arrow_forwardCreate spreadsheets and use Solver to determine the correct volumes to be produced to minimize cost for the following problem. Your company has two trucks that it wishes to use on a specific contract. One is a new truck the company is making payments on, and one is an old truck that is fully paid for. The new truck’s costs per mile are as follows: 54₵ (fuel/additives), 24₵ (truck payments), 36₵ (driver), 12₵ (repairs), and 1₵ (misc.). The old truck’s costs are 60₵ (fuel/additives), 0₵ (truck payments), 32₵ (rookie driver), 24₵ (repairs), and 1₵ (misc.). The company knows that truck breakdowns lose customers, so it has capped estimated repair costs at $14,000. The total distance involved is 90,000 miles (to be divided between the two trucks).arrow_forwardWhich of the following is not an assumption of a maximum flow problem? Multiple Choice All flow through the network originates at one node, called the source. If a node is not the source or the sink then it is a transshipment node. Flow can move toward the sink and away from the sink. The maximum amount of flow through an arc is given by the capacity of the arc. The objective is to maximize the total amount of flow from the source to the sink.arrow_forward
- Four doctors work in a hospital emergency room thathandles three types of patients. The time a doctor spends with each type of patient is exponentially distributed, witha mean of 15 minutes. Interarrival times for each customertype are exponential, with the average number of arrivalsper hour for each patient type being as follows: type 1, 3patients; type 2, 5 patients; type 3, 3 patients. Assume thattype 1 patients have the highest priority, and type 3 patientshave the lowest priority (no preemption is allowed). What isthe average length of time that each type of patient mustwait before seeing a doctor?arrow_forwardDo not use chatgpt.arrow_forwardThe maintenance department of an Oil and Gas Company has 6 large drilling equipment waiting for repairs. These are labelled A, B, C, D, E and F. The respective repair times (in days) and the remaining days before the due date are given in the table below.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,