A theme park has a single entrance gate where visitors must stop and pay for parking. The average arrival rate during the peak hour is 150 veh/h and is Poisson distributed. It takes, on average, 20 seconds per vehicle (exponentially distributed) to pay for parking. What is the average waiting time for this queuing system?
a. 4.167 min/veh
b. 2.0 min/veh
c. 1.667 min/veh
d. 0.833 min/veh

Blurred answer
Students have asked these similar questions
Please show the complete solution. The answers in this problem must be: 1. 16.25 kN 2. 51.725 kN 3. 45 000 mm² 4. 52.086 kN 5. 165.776 MPa 6. 62. 572 kN 7. 199. 173 MPa 8. 68.579 kN
Show complete solution please thanks
Please solve with steps

Additional Engineering Textbook Solutions

Find more solutions based on key concepts
1.2 Explain the difference between geodetic and plane surveys,

Elementary Surveying: An Introduction To Geomatics (15th Edition)

What types of coolant are used in vehicles?

Automotive Technology: Principles, Diagnosis, And Service (6th Edition) (halderman Automotive Series)

What is an uninitialized variable?

Starting Out with Programming Logic and Design (5th Edition) (What's New in Computer Science)

Knowledge Booster
Background pattern image
Civil Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning
Text book image
Solid Waste Engineering
Civil Engineering
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Cengage Learning,
What Is A Construction Takeoff? | Are They Still Necessary In Quantity Surveying?; Author: Metroun Quantity Surveying;https://www.youtube.com/watch?v=uTWoDPtcOjg;License: Standard Youtube License