Textbook Question
thumb_up100%
Chapter 5, Problem 21R
When two nonmetallic-sheathed cables (Type NM-B) enter a box, is it permitted to bring both of the bare equipment grounding conductors directly to the grounding terminal of a receptacle, using the terminal as a splice point? _______
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
To testing installation of grounds, the usual procedure is to connect one lead of the megohmmeter to one of the conductors, then the other lead is___.
A, connected to another conductor b, connected to the conduit or raceway c. Connected to a special grounding electrode on the megohmmeter d. Left unconnected
3 is incorrect
Which of the following statements about equipment grounding conductors (EGCS) is true?
A. The National Electrical Code permits the EGC to also perform as a grounding electrode conductor.
B. More than one EGC must be used if multiple circuits are installed in a single raceway, cable, or cable tray.
C. No current should be present in the EGC during normal operation.
D. EGCs are required to be decreased in size to address voltage drop.
Chapter 5 Solutions
ELECTRICAL WIRING:RESIDENTAL-6 PLANS
Ch. 5 - The identified grounded circuit conductor must be...Ch. 5 - Explain how lighting switches are rated.Ch. 5 - Prob. 4RCh. 5 - Prob. 5RCh. 5 - To control a lighting load from one control point,...Ch. 5 - Prob. 7RCh. 5 - Complete the connections in the following...Ch. 5 - Complete the connections for the diagram....Ch. 5 - A three-way switch may be compared to a _____...Ch. 5 - Prob. 11R
Ch. 5 - Complete the connections in the following...Ch. 5 - When connecting 4-way switches, care must be taken...Ch. 5 - Show the connections for a ceiling outlet that is...Ch. 5 - Match the following switch types with the correct...Ch. 5 - When connecting single-pole, 3-way, and 4-way...Ch. 5 - What section of the Code emphasizes the fact that...Ch. 5 - If you had to install an underground 3-wire feeder...Ch. 5 - Is it always necessary to attach the bare...Ch. 5 - List the methods by which an equipment grounding...Ch. 5 - When two nonmetallic-sheathed cables (Type NM-B)...Ch. 5 - Define an equipment grounding conductor.Ch. 5 - When metal toggle switchplates are used with...Ch. 5 - Does the Code permit the ampacity of switch legs...Ch. 5 - Prob. 26RCh. 5 - Prob. 27R
Additional Engineering Textbook Solutions
Find more solutions based on key concepts
How does a computers main memory differ from its auxiliary memory?
Java: An Introduction to Problem Solving and Programming (8th Edition)
Write a summary list of the problem-solving steps identified in the chapter, using your own words.
BASIC BIOMECHANICS
Why is the study of database technology important?
Database Concepts (8th Edition)
How is the hydrodynamic entry length defined for flow in a pipe? Is the entry length longer in laminar or turbu...
Fluid Mechanics: Fundamentals and Applications
The solid steel shaft AC has a diameter of 25 mm and is supported by smooth bearings at D and E. It is coupled ...
Mechanics of Materials (10th Edition)
Assume a telephone signal travels through a cable at two-thirds the speed of light. How long does it take the s...
Electric Circuits. (11th Edition)
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.Similar questions
- If a grounding electrode conductor is connected at the first system disconnecting means or overcurrent device, the bonding jumper is sized the same as the ____. Select one: A. EQUIPMENT BONDING JUMPER B. POSITIVE CONDUCTOR C. SUPPLY-SIDE BONDING JUMPER D. NEUTRAL CONDUCTORarrow_forwardWhen connecting a multiwire (3-wire) circuit to a single phase panel, one ungrounded conductor must be connected to the ____ phase and the other ungrounded conductor must be connected to the ____ phase. Select one: a. A, A b. B, B c. A, B d. doesn’t matterarrow_forwardA means shall be provided in each metal box over 100 cubic inches for the connection of an equipment grounding conductor. The means shall be permitted to be ______. a tapped hole the cover screw III. a screw used to mount the box (a.) I only (c.) I & II only (b.) II only (d.) I, II or IIIarrow_forward
- 2. Imagine that you're asked to install an auxiliary grounding electrode at the base of a lighting pole in aparking lot. This auxiliary grounding electrode will be connected to theA. lighting pole's electrical service equipment grounding conductor.B. electrical service's grounding electrode conductor.C. next lighting pole's auxiliary grounding electrode.D. lighting pole's neutral conductor.arrow_forwarddetermine the correct box size for each of the following conditions:1. Two nonmetallic sheathed cables with two 12 AWG conductors, a grounding conductor, and a switch in a metal box.arrow_forwardof p o How many conductors enter the ceiling fan/light wall box? Switch ond out let boxes s tirst 10. What type and size of box may be used for the ceiling fan/light wall box?. 11. What type of covers are used with 4 in. square outlet boxes? 12. a. Does the circuit for the Master Bedroom have a grounded circuit conductor? b. Does it have an equipment grounding conductor? c. Explain the difference between a "grounded" conductor and an "equipment grounding" conductor. 13. Approximately how many feet (meters) of 2-wire cable and 3-wire cable are needed to ft complete the circuit supplying the Master Bedroom? Two-wire cable: ft (- m). m). Three-wire cable: 14. If the cable is laid in notches in the corner studs, what protection for the cable must be provided? 15. How high are the receptacles mounted above the finished floor in this bedroom? 16. Approximately how far from the bedroom door is the first receptacle mounted? (See the plans.) 17. What is the distance from the finished floor to…arrow_forward
- Two #12 THW copper conductors and one # 12 grounding conductor are pulled in a 49'-9" run of 3/4"conduit which is available in 10' lengths. How many pieces of conduit are required?arrow_forwardList the minimum trade size of Type EMT for each of the following applications. Assume the use of conductors with THHN insulation. Six 14 AWG ______ Six 12 AWG ______ Three 10 AWG ______ Four 8 AWG ______arrow_forwardThe NEC requires that a(n)_______ be installed at each conductor splice or connection point? A. insulated wire connector B. grounding electrode conductor (ground wire) C. receptacle or junction box D. A, B, and C E. none of thesearrow_forward
- If the NEC provides a requirement to grounding equipment, it generally implies that there will be a direct connection to Earth of connection through a/an A. Equipment grounding conductor B. Bonding conductor C. Grounding electrode conductor D. Equipotential bonding conductorarrow_forwardQUESTION 3 We are running 3 wires and a ground in a RMC to a control panel with a 60 amp circuit breaker disconnect in the control panel. The conduit is run along the ceiling where the ambient air temperature is 100 degrees. The control panel feeds our secondary cooling pump. What size are the ungrounded conductors? All conductors have typeTHHN insulation.arrow_forwardIs it always necessary to attach the bare equipment grounding conductor of a nonmetallic-sheathed cable to the green hexagon-shaped grounding screw on a receptacle? Explain.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- EBK ELECTRICAL WIRING RESIDENTIALElectrical EngineeringISBN:9781337516549Author:SimmonsPublisher:CENGAGE LEARNING - CONSIGNMENT
EBK ELECTRICAL WIRING RESIDENTIAL
Electrical Engineering
ISBN:9781337516549
Author:Simmons
Publisher:CENGAGE LEARNING - CONSIGNMENT
Types of House Wiring - Types of Electrical Wiring - Electrical Wiring; Author: Learning Engineering;https://www.youtube.com/watch?v=A5P-buWX-dA;License: Standard Youtube License