The difference between short-term and long-term driver expectancy with an example.
Explanation of Solution
Given:
Short-term and long-term driver expectancy.
Drivers depend on their expectations regarding the road layout and road-related examples when driving. Despite data processing and visual inquiry limitations, drivers cope well, even at high speeds, both because roads are generally planned because of driver impediments and because drivers depend on their experience.
Drivers develop both short-term and long-term driver expectancies. Example of short-term expectancies incorporates after going at a moderately fast taking wide distance, that the drivers may expect that the designed ahead road was accommodated to the similar speed.
Example of long-term expectancies incorporate when moving toward convergence, drivers should be in the left path to make a left turn at the crossroad.
Conclusion:
One approach to accommodate for human data processing limitations is to plan roadway conditionsas per driver expectations.
Want to see more full solutions like this?
Chapter 5 Solutions
Traffic And Highway Engineering
- LAB: FORCE AND FORCE-RELATED VARIABLES ASSIGNMENT INSTRUCTIONS INSTRUCTIONS Lab assignments are intended to give you some ‘hands on' experience in applying the concepts introduced in the course text. They are designed to get you out of your classroom or office and develop the skills of designing experiments and collecting data, and then performing calculations, evaluating the results, and communicating your findings. Labs are more than just number crunching - they are about reflecting on what is both practical and technically sound engineering problem-solving. For each problem below, address the scenario presented and develop engineering solutions. Communicate your results using drawings, pictures, and discussion, supported by calculations developed using the Microsoft Equation Editor or similar tool. Submit your lab report in a single pdf file uploaded to the location provided in Canvas before the due date/time indicated. Each problem should be treated as a micro-report with a problem…arrow_forwardHow can a construction estimator gain experience to better judge appropriate contingency amounts?arrow_forwardWhat are the potential risks and rewards of including a higher or lower contingency amount in a construction estimate?arrow_forward
- Draw moment and shear diagramsarrow_forwardFIND THE INTERNAL MISSING ANGLES AND MISSING SIDESOF A 90° RIGHT TRIANGLE WITH A HEIGHT OF 96 AND A BASE OF 48.DRAW A PROPORTIONAL SKETCH OF THE TRIANGLE, IDENTIFY GIVEN INFORMATIONAND LABEL MISSING INFORMATION. WHAT IS AREA TO THE NEAREST SQ. FT.?arrow_forward2,789.10 FEET = HOW MANY METERS (M)?arrow_forward
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage LearningEngineering Fundamentals: An Introduction to Engi...Civil EngineeringISBN:9781305084766Author:Saeed MoaveniPublisher:Cengage LearningResidential Construction Academy: House Wiring (M...Civil EngineeringISBN:9781285852225Author:Gregory W FletcherPublisher:Cengage Learning
- Fundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,