Concept explainers
A.J.’s Wildlife Emporium manufactures two unique birdfeeders (Deluxe and Super Duper) that are manufactured and assembled in up to three different workstations
- Using the traditional method, which bases decisions solely on a product’s contribution to profits and overhead, what is the optimal product mix and what is the overall profitability?
- Using the bottleneck-based method, what is the optimal product mix and what is the overall profitability?
Want to see the full answer?
Check out a sample textbook solutionChapter 5 Solutions
Operations Management: Processes And Supply Chains (12th Global Edition) - Does Not Include Mylab Operations Management
Additional Business Textbook Solutions
Operations Management: Sustainability and Supply Chain Management (12th Edition)
Operations Management
Loose-leaf for Operations Management (The Mcgraw-hill Series in Operations and Decision Sciences)
Operations Management
Operations and Supply Chain Management 9th edition
Business in Action (8th Edition)
- Tuff-Rider, Inc., manufactures touring bikes and mountainbikes in a variety of frame sizes, colors, and component com-binations. Identical bicycles are produced in lots of 100. Theprojected demand, lot size, and time standards are shown inthe following table: Item Touring MountainDemand forecast 5,000 units/year 10,000 units/yearLot size 100 units 100 unitsStandard processing time .25 hour/unit .50 hour/unitStandard setup time 2 hours/lot 3 hours/lot The shop currently works 8 hours a day, 5 days a week,50 weeks a year. It operates five workstations, each producingone bicycle in the time shown in the table. The shop main-tains a 15 percent capacity cushion. How many workstationswill be required next year to meet expected demand withoutusing overtime and without decreasing the firm’s currentcapacity cushion?arrow_forwardWhat is one important advantage of a Make-To-Stock process? Group of answer choices Can respond quickly to customer demand Creates greater flexibility Less likely to have obsolete inventory More environmentally sensitivearrow_forwardWhat is the definition of a processing item?arrow_forward
- Please do not give solution in image format thankuarrow_forwardBhatti Company produces plastic photo frames. Two departments, molding and finishing, are involved in the manufacturing. The molding department fills the molds with hot liquid plastic that is left to cool and then opens them. The finishing department removes the plastic frame from the mold and strips the edges of the frames of extra plastic. The following information is available for the month of January: January 1 Quantity (pounds) January 31 Quantity (pounds) Work-in-Process Inventory Cost Cost Molding department Finishing department None None 5,000 $ 15,000 2,000 The WIP Inventory in the finishing department is estimated to be 40% complete for conversion both at the beginning and end of January. Costs of production for January follow: Direct Costs of Production Materials Conversion Molding department Finishing department $ 450,000 $ 90,000 80,290 The molding department started 50,000 pounds of product in January. The firm uses the FIFO method of process costing. Required: 1. Prepare…arrow_forward1. Which of the following quantities has no effect on the first period’s ATP calculation? a) Current on-hand Inventory b) Booked customer orders for the first periods c) MPS quantity for the first period d) Forecasted demand for the first period 2. Which one of the following is an MRP lot-sizing rule that attempts to minimize the amount to minimize the amount of average inventory? a) Periodic order quantity (POQ), WITH P=2 b)Fixed order quantity (FOQ) c) Economic order quantity (EOQ) d)Lot for Lot (L4L). 3. Which of the following statements about lot-sizing rules for MRP is true? a) The periodic order quantity (POQ) rule generates a higher level of average inventory since it creates inventory remnants. b) FOQ is a dynamic lot-sizing rule which reduces the amount of inventory, by doing a better job of matching the order quantity to the projected on-hand inventory quantity. c) The lot for lot rule minimizes inventory investment but maximizes the number of orders placed. d) In…arrow_forward
- OUTDOOR ADVENTURE: WHITE WATER AND CAMPING SUPPLIES(NETWORKED COMPUTER SYSTEM AND MANUAL PROCEDURES)Outdoor Adventure is a Montana-based wholesaler of rafting andcamping equipment that serves outdoor sports camping retailers throughout the northwest. You have been hired by Outdoor Adventure toevaluate its processes, risks, and internal controls. The followingparagraphs describe Outdoor Adventure's expenditure cycle procedures.Purchases System The process begins when the purchasing clerk checks the inventorysubsidiary ledger on his computer terminal each morning. When anitem is deemed to be too low, the clerk selects a vendor from the validvendor file and prepares a digital purchase order. The clerk prints two hard copies: one copy is sent to the vendor, and the other is filed in thedepartment. Digital purchase order record is added to the PO File.When the goods arrive in the receiving department, the receiving clerkinspects them and reconciles the items against the information in…arrow_forwardWhich of the following is a fixed cost? a) Direct materials b ) Direct labor c) Rent on factory building d) Variable manufacturing overheadarrow_forwardCan you do the calculations in Excel file showing all the work? You are a planner at a small distribution warehouse. Historically, the warehouse has targeted fulfilling 10 orders per hour for planning purposes. However, as the diversity of products has expanded, as well as the size of orders, this target has proven to be unreliable, as the orders are continually behind schedule and customers are complaining about late deliveries. Your supervisor has tasked you with determining a better target so that the warehouse may provide better delivery estimates to customers for their orders. Over the past week you gathered data for the number of orders fulfilled each day. This data is shown in the following table. Day Monday Tuesday Wednesday Thursday Friday Orders 88 64 72 56 80 A. Assuming 8 hours of operations each day, what is the mean and standard deviation for orders fulfilled per hour? The following table may help with these calculations. N is the total…arrow_forward
- What is the advantage of a simple segmentation that does not require loading all of the segments of a process by including the nonresident segments automatically when needed?arrow_forwardJosie’s Sports Accessories has 12 operators who work 9 hours a day (no breaks), 7 days a week. They manufacture headbands with a standard minute value of 1.35 minutes. The workers produce 4,450 headband a day. How long will it take them to complete an order for 5,000 headbands?arrow_forwardA bicycle component manufacturer produces hubs for bike wheels. Two processes are possible for manufacturing, and the parameters of each process are as follows: Process 1 Production rate Daily production time Process 2 35 parts/hour 4 hours/day 20% 15 parts/hour 7 hours/day 9% Percent parts rejected Assume that the daily demand for hubs allows all defect-free hubs to be sold. Select the process that maximizes profit per day if each part is made from $4 worth of material and can be sold for $30. Both processes are fully automated, and variable overhead cost is charged at the rate of $40 per hour.arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,