Question
Chapter 4, Problem 8P
To determine
Ascertain the estimated cost at completion of project and variance for each cost.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
9. A contractor has a contract to remove and replace the existing landscape and sidewalks around an office building. The work includes demolition of the existing landscaping and sidewallks, importing fill and grading around the office building, constructing new concrete sidewalks, and new landscaping. The contractor uses the cost codes in Figure 2-6. The contractor will perform all of the work except placing the site concrete and the landscaping. The original estimate for the demolition was $30,000, and a $5,000 change order has been approved to remove some unexpected debris found during the demolition. The demolition work has been completed at a cost of $33,562. The original estimate for the fill and grading was $17,500 and a $2,000 change order for importing additional fill to replace the debris has been approved. The fill and grading costs to date are $17,264, and the estimated cost to complete has been estimated at $2,236. The original budget for the labor to pour the concrete was…
Alpine Company solicited bids from several contractors to construct an addition to its office building. The lowest bid received was for $1,200,000. Alpine decided to construct the addition itself at a cost of $1,100,000. What amount should be recorded in the building account?
residential client hired a general contractor (GC) to construct a major $3 million executive home. The client contracted separately with a reputable architect for the design. After the permit was obtained, the architect’s contract was closed out. During the course of construction, the owner and the city had requested several changes, but none of them were formalized into the contract. Many of these were additive but some were also deductive changes. Many of the changes were due to building code changes. Because the general contractor understood this to be a time and materials (T&M) project, they had not felt it was necessary to submit change orders against a “budgeted” amount. The GC had previously invoiced and received 67% of the original budget, or $2 million, from the owner. These invoices were all reviewed and approved by the lender. At approximately 90% completion, the GC invoiced the owner for the full 100% amount of the original $3 million estimate. When pressed, the GC…
Chapter 4 Solutions
Construction Accounting And Financial Management (4th Edition)
Ch. 4 - Define committed costs and provide two examples of...Ch. 4 - Why is labor seldom a committed cost?Ch. 4 - Prob. 3DQCh. 4 - What are overbillings and how do they occur?Ch. 4 - Prob. 5DQCh. 4 - What are the six key principals of internal...Ch. 4 - What should you look for in a construction...Ch. 4 - Prob. 8PCh. 4 - Prob. 9PCh. 4 - Prob. 10P
Knowledge Booster
Similar questions
- Question 9. A contractor has a contract to remove and replace the existing landscape and sidewalks around an office building. The work includes demolition of the existing landscaping and sidewallks, importing fill and grading around the office building, constructing new concrete sidewalks, and new landscaping. The contractor uses the cost codes in Figure 2-6. The contractor will perform all of the work except placing the site concrete and the landscaping. The original estimate for the demolition was $30,000, and a $5,000 change order has been approved to remove some unexpected debris found during the demolition. The demolition work has been completed at a cost of $33,562. The original estimate for the fill and grading was $17,500 and a $2,000 change order for importing additional fill to replace the debris has been approved. The fill and grading costs to date are $17,264, and the estimated cost to complete has been estimated at $2,236. The original budget for the labor to pour the…arrow_forwardJax Construction Company plans to erect a new building. It will use part of the space for its own offices and lease the balance of the space to tenants. The company has two alternatives: (1) do its own construction work or (2) use an independent contractor. Cost estimates have been prepared to show the costs of operation for the coming year during which the new building will be constructed. The costs of constructing the building, if done by Jax, are included in that set of estimates. If the company does its own construction work, it will not be able to handle outside construction contracts that would contribute $500,000 to net income. The costs attributable to these outside contracts are excluded from the estimated costs of operation shown below. Estimated Costs toOperate –Construction byIndependentContractors Estimated Costs toOperate (includingConstruction) –Construction by Jax(self) Materials $6,000,000 $7,000,000 Labour 3,000,000 4,800,000 Indirect materials and…arrow_forwardTwo landfill construction plans are being considered by a planning committee.They are:1) Plan A: Landfill with a groundwater protection system.2) Plan B: Landfill constructed with a geosynthetic liner to minimize leachates from the landfill and protectgroundwater sources.Annual amortized capital costs and risks of failure for the systems are presented in the table below:The cleanup cost, if the groundwater system should fail, is estimated to be $8,000,000.a) Determine the annual social cost of failure of each of the two plans.b) Determine to total cost per year for the two plans.c) If minimum total annual cost is the criterion for selecting a option, what plan should be chosen? Clearly justifyyour choice.arrow_forward
- The Tennessee Department of Highways is trying to decide whether it should “hot-patch” a short stretch of an existing highway or resurface it. If the hotpatch method is chosen, approximately 500 cubic meters of material would be required at a cost of $800/cubic meter (in place). If hot-patched, the shoulders will have to be improved at the same time at a cost of $24,000. The shoulders must be maintained at a cost of $3000 every 2 years. The annual cost of routine maintenance on the patched road is estimated to be $6000. Alternatively, the state can resurface the road at a cost of $500,000. If maintained properly, at a cost of $2000 per year beginning in the second year, the surface will last for 10 years. The shoulders would require reworking at the end of the fifth year at a cost of $15,000. Regardless of the method selected, the road will be completely rebuilt in 10 years. At an interest rate of 9%, which alternative should be chosen?arrow_forwardA company is constructing a new production facility. The following costs have been incurred: Site preparation costs $50,000 Architects’ fees $26,000 Legal fees $10,000 Purchase of site $200,000 Costs incurred to relocate employees to the new facility $30,000 Administration costs $50,000 Total costs $366,000 The architects’ fees relate to the design of the new facility and the legal fees relate to legal advice received on the contract to purchase the site. The total value that should be recognized as Property, Plant and Equipment for the new facility should be Question 10Answer a. $ 314,000 b. $ 324,000 c. $ 344,000 d. $ 286,000arrow_forwardEast and West Construction has undertaken the construction of a bridge over the River Till for the Campton Council. The value of the contract is $125,000 and it is at a stage where profits can be attributed to it. When work was certified, Campton Council was sent an invoice for progress payment. The contractors have given the contract number 86 for reference, and the following are the details as shown in the books: Labour on site Materials direct to site, less returns Materials from store and workshops Plant Upkeep Account-hire and use of plant Direct expenses General overhead apportioned to this contract Materials on hand November 30 Wages accrued at November 30 Direct expenses accrued Value of work certified by the council's surveyor Cash received on account Required: $ 40,500 42,000 8,120 1,210 2,300 3,710 630 780 160 110,000 88,000 (a) Prepare the contract 86 account as at November 30th 2011. (b) Prepare the contract P&L account for the year ended November 30th 2011.arrow_forward
- Rex's Reclaimers entered into a contract with Dan's Demolition to manage the processing of recycled materials on Dan's various demolition projects. Services for the 3-year contract include collecting, sorting, and transporting reclaimed materials to recycling centers or contractors who will reuse them. Rex's incurs selling commission costs of $2,000 to obtain the contract. Before performing the services, Rex's also designs and builds receptacles and loading equipment that interfaces with Dan's demolition equipment at a cost of $27,000. These receptacles and equipment are retained by Rex's and can be used for other projects. Dan's promises to pay a fixed fee of $12,000 per year, payable every 6 months for the services under the contract. Rex's incurs the following costs: design services for the receptacles to interface with Dan's equipment $3,000, loading equipment controllers $6,000, and special testing and OSHA inspection fees $2,000 (some of Dan's projects are on government…arrow_forwardThe following information relates to Contract 6502, which was undertaken for the construction of roadways for the City Council. The total value of the contract was $250,000 and it is at a stage where profits can be attributed to it. Details of the contract are shown in the books: $ Materials sent to site 85,349 Labour engaged on site 74,375 Plant installed at cost 15,000 Direct expenditure 4,136 General overhead charges 3,167 Materials returned to store…arrow_forwardCan you please send me the solution of following question. An owner of a Cinema Hall, on ascertaining that a portion of the ceiling of the hall was in need of repairs, decided to replace the whole of the ceiling with different but better materials. The new ceiling, in addition to enhancing the appearance of the hall, improved the acoustics. The total cost of the material and of erecting the new ceiling was $320,000. It was estimated that the cost of repairing the ceiling would have been $220,000.With reference to Income Tax Assessment Act 1997 and relevant case law, discuss the amount, if any, allowable as a deduction for income tax purposes.Kindly use the four sections of:1. Facts of the scenario2. Relevant laws and cases3. Application of laws and cases 4. Conclusionarrow_forward
- Columbia Company incurred the following expenditures related to the land and building: Payment for land and old building 1,750,000 Demolition of old building to prepare the land for the construction of a new building 87,500 Payment to tenants for vacating old building 26,250 Building permit for new construction 52,500 Surveying fee before construction of new building 35,000 Parking lots and driveways (part of building plan) 70,000 Cost of grading, leveling and landfill 78,750 Assessment by city for drainage project 8,750 Construction costs of new building 10,500,000 Temporary quarters for…arrow_forwardRex's Reclaimers entered into a contract with Dan's Demolition to manage the processing of recycled materials on Dan's various demolition projects. Services for the 3-year contract include collecting, sorting, and transporting reclaimed materials to recycling centers or contractors who will reuse them. Rex's incurs selling commission costs of $2,000 to obtain the contract. Before performing the services, Rex's also designs and builds receptacles and loading equipment that interfaces with Dan's demolition equipment at a cost of $27,000. These receptacles and equipment are retained by Rex's and can be used for other projects. Dan's promises to pay a fixed fee of $12,000 per year, payable every 6 months for the services under the contract. Rex's incurs the following costs: design services for the receptacles to interface with Dan's equipment $3,000, loading equipment controllers $6,000, and special testing and OSHA inspection fees $2,000 (some of Dan's projects are on government…arrow_forwardIn connection with surfacing a new highway, a contractor has a choice of two sites on which to set up the asphalt- mixing plant equipment. The contractor estimates that it will cost $1.25 per cubic yard mile (yd³ -mile) to haul the asphalt-paving material from the mixing plant to the job location. Factors relating to the two mixing sites are as follows: Cost Factor Average hauling distance Monthly rental of site Cost to set to and remove equipment Hauling expense Flagperson Site A 6 miles $1,200 $17,000 $1.25 / yd³ -mile Not required Site B 4.3 miles $5,500 $25,000 $1.25 / yd³ -mile $96 / day The job requires 50,000 cubic yards of mixed-asphalt-paving material. It is estimated that four months (17 weeks of five working days per week) will be required for the job. Compare the two sites in terms of their total costs. Assume that the cost of the return trip is negligible. A) Which is the better site? B) For the selected site, how many cubic yards of paving material does the contractor…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you