EBK MATHEMATICS FOR THE TRADES
10th Edition
ISBN: 9780100803053
Author: SAUNDERS
Publisher: YUZU
expand_more
expand_more
format_list_bulleted
Concept explainers
Textbook Question
Chapter 4, Problem 11GPS
Manufacturing A production job is bid at $6275, but cost overruns amount to 15%. What is the actual job cost?
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
No chatgpt pls will upvote
During busy political seasons, many opinion polls are conducted. In apresidential race, how do you think the participants in polls are generally selected?Discuss any issues regarding simple random, stratified, systematic, cluster, andconvenience sampling in these polls. What about other types of polls, besides political?
No chatgpt pls will upvote
Chapter 4 Solutions
EBK MATHEMATICS FOR THE TRADES
Ch. 4.1 - Complete the following tables.Ch. 4.1 - A. Complete the following tables. 2.Ch. 4.1 - A. Complete the following tables. 3.Ch. 4.1 - Solve these proportion equations. 32=x8Ch. 4.1 - Solve these proportion equations. 6R=572Ch. 4.1 - Solve these proportion equations. y60=53Ch. 4.1 - Solve these proportion equations. 215=8HCh. 4.1 - Solve these proportion equations. 5P=307Ch. 4.1 - Solve these proportion equations. 16=17xCh. 4.1 - Solve these proportion equations. A2.5=1310
Ch. 4.1 - Solve these proportion equations. 27M=30.8Ch. 4.1 - Solve these proportion equations. 25=T4.5Ch. 4.1 - Solve these proportion equations. 0.12N=27Ch. 4.1 - Solve these proportion equations. 13823=18xCh. 4.1 - Solve these proportion equations. 3.251.5=A0.6Ch. 4.1 - Solve these proportion equations. x34.86=1.28.3Ch. 4.1 - Solve these proportion equations. 212R=114314Ch. 4.1 - Solve these proportion equations....Ch. 4.1 - Solve these proportion equations....Ch. 4.1 - Solve these proportion equations....Ch. 4.1 - Solve these proportion equations. 312in.W=1.40.05Ch. 4.1 - Solve. Automotive Trades The compression ratio in...Ch. 4.1 - Prob. 2CECh. 4.1 - Solve. Machine Trades If 28 tapered pins can be...Ch. 4.1 - Solve. Carpentry If 6 lb of nails are needed for...Ch. 4.1 - Solve. Masonry For a certain kind of plaster work,...Ch. 4.1 - Prob. 6CECh. 4.1 - Solve. Machine Trades A cylindrical oil tank 8 ft...Ch. 4.1 - Prob. 8CECh. 4.1 - Solve. Welding A 10-ft bar of I-beam weighs 208...Ch. 4.1 - Solve. Photography A photographer must mix a...Ch. 4.1 - Solve. General Trades If you earn 684.80 for a...Ch. 4.1 - Solve. Machine Trades A machinist can produce 12...Ch. 4.1 - Solve. Automotive Trades The headlights on a car...Ch. 4.1 - Prob. 14CECh. 4.1 - Solve. Agriculture To prepare a pesticide spray,...Ch. 4.1 - Solve. Painting A painter must thin some paint for...Ch. 4.1 - Solve. Allied Health The label on a concentrated...Ch. 4.1 - Solve. Automotive Trades In winter weather,...Ch. 4.1 - Prob. 19CECh. 4.1 - Prob. 20CECh. 4.1 - Prob. 21CECh. 4.1 - Solve. Sports and Leisure Power hitter Sammy...Ch. 4.1 - Prob. 23CECh. 4.1 - Prob. 24CECh. 4.1 - Solve. Allied Health Medication Q is available...Ch. 4.1 - Prob. 26CECh. 4.1 - Prob. 27CECh. 4.1 - Prob. 28CECh. 4.1 - Prob. 29CECh. 4.1 - Prob. 30CECh. 4.1 - Solve. Trades Management A small welding shop...Ch. 4.1 - Prob. 32CECh. 4.1 - Prob. 33CECh. 4.1 - Prob. 34CECh. 4.1 - Prob. 35CECh. 4.2 - Complete the following tables. 1. Similar...Ch. 4.2 - Complete the following tables. 2. Similar figuresCh. 4.2 - Complete the following tables.Ch. 4.2 - Complete the following tables.Ch. 4.2 - Practical Applications Problem 1 Metalworking A...Ch. 4.2 - Practical Applications Architecture The...Ch. 4.2 - Practical Applications Automotive Trades...Ch. 4.2 - Practical Applications Transportation The distance...Ch. 4.2 - Prob. 5BECh. 4.2 - Practical Applications Industrial Technology If 60...Ch. 4.2 - Practical Applications Automotive Trades If the...Ch. 4.2 - Practical Applications General Trades The length...Ch. 4.2 - Practical Applications Construction The Santa...Ch. 4.2 - Practical Applications Machine Trades A pair of...Ch. 4.2 - Practical Applications Manufacturing A 15-tooth...Ch. 4.2 - Practical Applications Electronics The power gain...Ch. 4.2 - Prob. 13BECh. 4.2 - Prob. 14BECh. 4.2 - Practical Applications Automotive Trades The...Ch. 4.2 - Prob. 16BECh. 4.2 - Practical Applications Machine Trades It is known...Ch. 4.2 - Prob. 18BECh. 4.2 - Prob. 19BECh. 4.2 - Practical Applications Architecture A wrought-iron...Ch. 4.2 - Prob. 21BECh. 4.2 - Electrical Trades The electrical resistance of a...Ch. 4.2 - Prob. 23BECh. 4.2 - Practical Applications Sheet Metal Trades If the...Ch. 4.2 - Prob. 25BECh. 4.2 - Prob. 26BECh. 4.2 - Prob. 27BECh. 4.2 - Prob. 28BECh. 4.2 - Prob. 29BECh. 4.2 - Prob. 30BECh. 4.2 - Prob. 31BECh. 4.3 - Prob. 1AECh. 4.3 - Convert to a percent. 1Ch. 4.3 - Convert to a percent. 0.5Ch. 4.3 - Prob. 4AECh. 4.3 - Prob. 5AECh. 4.3 - Prob. 6AECh. 4.3 - Prob. 7AECh. 4.3 - Prob. 8AECh. 4.3 - Prob. 9AECh. 4.3 - Prob. 10AECh. 4.3 - Prob. 11AECh. 4.3 - Prob. 12AECh. 4.3 - Prob. 13AECh. 4.3 - Prob. 14AECh. 4.3 - Prob. 15AECh. 4.3 - Prob. 16AECh. 4.3 - Convert to a percent. 32Ch. 4.3 - Prob. 18AECh. 4.3 - Prob. 19AECh. 4.3 - Convert to a percent. 15Ch. 4.3 - Prob. 21AECh. 4.3 - Prob. 22AECh. 4.3 - Prob. 23AECh. 4.3 - Prob. 24AECh. 4.3 - Prob. 25AECh. 4.3 - Prob. 26AECh. 4.3 - Prob. 27AECh. 4.3 - Prob. 28AECh. 4.3 - Prob. 29AECh. 4.3 - Prob. 30AECh. 4.3 - Prob. 31AECh. 4.3 - Prob. 32AECh. 4.3 - Prob. 33AECh. 4.3 - Prob. 34AECh. 4.3 - Prob. 35AECh. 4.3 - Prob. 36AECh. 4.3 - Prob. 37AECh. 4.3 - Prob. 38AECh. 4.3 - Prob. 39AECh. 4.3 - Prob. 40AECh. 4.3 - Prob. 1BECh. 4.3 - Prob. 2BECh. 4.3 - Prob. 3BECh. 4.3 - Prob. 4BECh. 4.3 - Prob. 5BECh. 4.3 - Prob. 6BECh. 4.3 - Prob. 7BECh. 4.3 - Prob. 8BECh. 4.3 - Prob. 9BECh. 4.3 - Prob. 10BECh. 4.3 - Prob. 11BECh. 4.3 - Prob. 12BECh. 4.3 - Prob. 13BECh. 4.3 - Prob. 14BECh. 4.3 - Prob. 15BECh. 4.3 - Prob. 16BECh. 4.3 - Prob. 17BECh. 4.3 - Prob. 18BECh. 4.3 - Prob. 19BECh. 4.3 - Prob. 20BECh. 4.3 - Prob. 21BECh. 4.3 - Prob. 22BECh. 4.3 - Prob. 23BECh. 4.3 - Prob. 24BECh. 4.3 - Prob. 25BECh. 4.3 - Prob. 26BECh. 4.3 - Prob. 27BECh. 4.3 - Prob. 28BECh. 4.3 - Prob. 29BECh. 4.3 - Prob. 30BECh. 4.3 - Prob. 31BECh. 4.3 - Prob. 32BECh. 4.3 - Prob. 1CECh. 4.3 - Prob. 2CECh. 4.3 - Prob. 3CECh. 4.3 - Prob. 4CECh. 4.3 - Prob. 5CECh. 4.3 - Prob. 6CECh. 4.3 - Prob. 7CECh. 4.3 - Prob. 8CECh. 4.3 - Prob. 9CECh. 4.3 - Rewrite each percent as a fraction in lowest...Ch. 4.3 - Prob. 11CECh. 4.3 - Prob. 12CECh. 4.3 - Prob. 13CECh. 4.3 - Prob. 14CECh. 4.3 - Prob. 15CECh. 4.3 - Prob. 16CECh. 4.3 - Prob. 17CECh. 4.3 - Prob. 18CECh. 4.3 - Prob. 19CECh. 4.3 - Prob. 20CECh. 4.4 - Solve. 4 is _________ % of 5.Ch. 4.4 - Prob. 2AECh. 4.4 - Prob. 3AECh. 4.4 - Prob. 4AECh. 4.4 - Prob. 5AECh. 4.4 - Prob. 6AECh. 4.4 - Prob. 7AECh. 4.4 - Prob. 8AECh. 4.4 - Solve. What percent of 54 is 36?Ch. 4.4 - Prob. 10AECh. 4.4 - Prob. 11AECh. 4.4 - Solve. 13 is what percent of 25?Ch. 4.4 - Prob. 13AECh. 4.4 - Prob. 14AECh. 4.4 - Prob. 15AECh. 4.4 - Solve. 60% of what number is 14?Ch. 4.4 - Prob. 17AECh. 4.4 - Prob. 18AECh. 4.4 - Prob. 19AECh. 4.4 - Prob. 20AECh. 4.4 - Solve. 30% of what number is equal to 12?Ch. 4.4 - Prob. 22AECh. 4.4 - Prob. 23AECh. 4.4 - Prob. 24AECh. 4.4 - Prob. 1BECh. 4.4 - Solve. What percent of 10 is 2.5?Ch. 4.4 - Solve. 6% of 3.29 is _________.Ch. 4.4 - Prob. 4BECh. 4.4 - Prob. 5BECh. 4.4 - Prob. 6BECh. 4.4 - Prob. 7BECh. 4.4 - Solve. 0.75 is _________ % of 37.50.Ch. 4.4 - Prob. 9BECh. 4.4 - Prob. 10BECh. 4.4 - Prob. 11BECh. 4.4 - Prob. 12BECh. 4.4 - Prob. 13BECh. 4.4 - Prob. 14BECh. 4.4 - Prob. 15BECh. 4.4 - Prob. 16BECh. 4.4 - Prob. 17BECh. 4.4 - Prob. 18BECh. 4.4 - Prob. 1CECh. 4.4 - Prob. 2CECh. 4.4 - Prob. 3CECh. 4.4 - Practical Applications Masonry On the basis of...Ch. 4.4 - Practical Applications Automotive Trades The...Ch. 4.4 - Prob. 6CECh. 4.4 - Practical Applications General Trades A worker...Ch. 4.4 - Prob. 8CECh. 4.4 - Prob. 9CECh. 4.4 - Prob. 10CECh. 4.4 - Practical Applications Carpentry Preparing an...Ch. 4.4 - Practical Applications Printing Jiffy Print needs...Ch. 4.4 - Prob. 13CECh. 4.4 - Prob. 14CECh. 4.4 - Prob. 15CECh. 4.4 - Prob. 16CECh. 4.4 - Construction Quality Homes Construction Company...Ch. 4.4 - Prob. 18CECh. 4.4 - Practical Applications Allied Health A typical...Ch. 4.4 - Prob. 20CECh. 4.4 - Prob. 21CECh. 4.4 - Prob. 22CECh. 4.4 - Sports and Leisure During the 2012 Wimbledon...Ch. 4.4 - Prob. 24CECh. 4.4 - Prob. 25CECh. 4.4 - Prob. 26CECh. 4.4 - Prob. 27CECh. 4.4 - Prob. 28CECh. 4.4 - Practical Applications Welding The allowable shear...Ch. 4.4 - Practical Applications Water/Wastewater Treatment...Ch. 4.4 - Prob. 31CECh. 4.4 - Prob. 32CECh. 4.4 - Prob. 33CECh. 4.4 - Prob. 34CECh. 4.4 - Prob. 35CECh. 4.4 - Prob. 36CECh. 4.4 - Allied Health A pharmaceutical sales...Ch. 4.4 - Prob. 38CECh. 4.4 - Prob. 39CECh. 4.5 - Electronics A CB radio is rated at 7.5 watts, and...Ch. 4.5 - Prob. 2ECh. 4.5 - Electrical Trades An engine supplies 110 hp to an...Ch. 4.5 - Prob. 4ECh. 4.5 - Prob. 5ECh. 4.5 - Prob. 6ECh. 4.5 - Prob. 7ECh. 4.5 - Life Skills If you earn 12% commission on sales of...Ch. 4.5 - Metalworking On a cutting operation, 2 sq ft of...Ch. 4.5 - Prob. 10ECh. 4.5 - Prob. 11ECh. 4.5 - Prob. 12ECh. 4.5 - Manufacturing A small gasoline shop engine...Ch. 4.5 - Prob. 14ECh. 4.5 - Prob. 15ECh. 4.5 - Trades Management A welding shop charges the...Ch. 4.5 - Prob. 17ECh. 4.5 - Prob. 18ECh. 4.5 - Prob. 19ECh. 4.5 - Prob. 20ECh. 4.5 - Prob. 21ECh. 4.5 - Interior Design An interior designer working for a...Ch. 4.5 - Retail Merchandising A one-terabyte external hard...Ch. 4.5 - Trades Management Chris paid for the initial...Ch. 4.5 - Prob. 25ECh. 4.5 - Prob. 26ECh. 4.5 - Prob. 27ECh. 4.5 - Prob. 28ECh. 4.5 - Automotive Trades A new tire had a tread depth of...Ch. 4.5 - Prob. 30ECh. 4.5 - Prob. 31ECh. 4.5 - Prob. 32ECh. 4.5 - Prob. 33ECh. 4.5 - Machine Trades Complete the following table of...Ch. 4.5 - Electrical Trades An electrician purchases some...Ch. 4.5 - Prob. 36ECh. 4.5 - Prob. 37ECh. 4.5 - Culinary Arts A wholesale food sales rep is paid a...Ch. 4.5 - Life Skills A sales rep for roofing materials...Ch. 4.5 - Prob. 40ECh. 4.5 - Trades Management Last year, the owner of the...Ch. 4.5 - Trades Management Because it has a history of...Ch. 4.5 - Prob. 43ECh. 4.5 - Prob. 44ECh. 4.5 - Prob. 45ECh. 4.5 - Prob. 46ECh. 4.5 - Prob. 47ECh. 4.5 - Prob. 48ECh. 4.5 - Prob. 49ECh. 4.5 - Prob. 50ECh. 4.5 - Prob. 51ECh. 4.5 - Prob. 52ECh. 4.5 - Allied Health A patient originally weighing 180 lb...Ch. 4.5 - Solve
Retail Merchandising A jacket was reduced in...Ch. 4.5 - Prob. 55ECh. 4.5 - Prob. 56ECh. 4.5 - Prob. 57ECh. 4.5 - Prob. 58ECh. 4.5 - Prob. 59ECh. 4.5 - Prob. 60ECh. 4.5 - Prob. 61ECh. 4 - Calculate ratios. (a) Find the ratio of the pulley...Ch. 4 - Solve proportions. (a) Solve for x. 8x=1215...Ch. 4 - Solve problems involving proportions. (a)...Ch. 4 - Write fractions and decimal numbers as percents....Ch. 4 - Prob. 5PCh. 4 - Solve problems involving percent. (a) Find 3712 of...Ch. 4 - A. Complete the following tables.Ch. 4 - A. Complete the following tables.Ch. 4 - B. Solve the following proportions. 56=x42Ch. 4 - B. Solve the following proportions. 815=12xCh. 4 - Prob. 3BPSCh. 4 - B. Solve the following proportions. 312x=51418Ch. 4 - B. Solve the following proportions. 1.65.2=4.4xCh. 4 - B. Solve the following proportions....Ch. 4 - C. Write each number as a percent. 0.72Ch. 4 - C. Write each number as a percent. 0.06Ch. 4 - Prob. 3CPSCh. 4 - C. Write each number as a percent. 0.358Ch. 4 - Prob. 5CPSCh. 4 - C. Write each number as a percent. 3.03Ch. 4 - Prob. 7CPSCh. 4 - Prob. 8CPSCh. 4 - Prob. 9CPSCh. 4 - C. Write each number as a percent. 235Ch. 4 - Prob. 1DPSCh. 4 - Prob. 2DPSCh. 4 - Prob. 3DPSCh. 4 - D. Write each percent as a decimal number. 94%Ch. 4 - Prob. 5DPSCh. 4 - D. Write each percent as a decimal number. 0.09%Ch. 4 - Prob. 7DPSCh. 4 - Prob. 8DPSCh. 4 - Prob. 9DPSCh. 4 - D. Write each percent as a decimal number. 8.02%Ch. 4 - Prob. 11DPSCh. 4 - D. Write each percent as a decimal number. 210%Ch. 4 - Prob. 1EPSCh. 4 - E. Write each of the following percents as a...Ch. 4 - Prob. 3EPSCh. 4 - Prob. 4EPSCh. 4 - Prob. 5EPSCh. 4 - Prob. 6EPSCh. 4 - Prob. 7EPSCh. 4 - E. Write each of the following percents as a...Ch. 4 - F. Solve. 3 is _____ % of 5.Ch. 4 - F. Solve. 5% is 120 is _____.Ch. 4 - Prob. 3FPSCh. 4 - F. Solve. 16 is what percent of 8?Ch. 4 - Prob. 5FPSCh. 4 - F. Solve. 1.38 is _____ % of 1.15.Ch. 4 - Prob. 7FPSCh. 4 - F. Solve. 250% of 50 is _____.Ch. 4 - Prob. 9FPSCh. 4 - Prob. 10FPSCh. 4 - Prob. 1GPSCh. 4 - Metalworking Cast iron contains up to 4.5% carbon,...Ch. 4 - Prob. 3GPSCh. 4 - Prob. 4GPSCh. 4 - Prob. 5GPSCh. 4 - Retail Merchandising A computer printer sells for...Ch. 4 - Prob. 7GPSCh. 4 - Prob. 8GPSCh. 4 - Prob. 9GPSCh. 4 - Masonry A mason must purchase enough mortar mix to...Ch. 4 - Manufacturing A production job is bid at 6275, but...Ch. 4 - Metalworking When heated, a metal rod expands...Ch. 4 - Prob. 13GPSCh. 4 - Automotive Trades A 140-hp automobile engine...Ch. 4 - Prob. 15GPSCh. 4 - Prob. 16GPSCh. 4 - Prob. 17GPSCh. 4 - Trades Management To purchase a truck for his...Ch. 4 - Prob. 19GPSCh. 4 - Interior Design An interior designer is able to...Ch. 4 - Prob. 21GPSCh. 4 - Prob. 22GPSCh. 4 - Prob. 23GPSCh. 4 - Automotive Trades The headlights on a car are...Ch. 4 - Prob. 25GPSCh. 4 - Prob. 26GPSCh. 4 - Prob. 27GPSCh. 4 - Prob. 28GPSCh. 4 - Machine Trades Six steel parts weigh 1.8 lb. How...Ch. 4 - Prob. 30GPSCh. 4 - Prob. 31GPSCh. 4 - Drafting Drafters usually use a scale of 14 in. =...Ch. 4 - Prob. 33GPSCh. 4 - Prob. 34GPSCh. 4 - Prob. 35GPSCh. 4 - Prob. 36GPSCh. 4 - Prob. 37GPSCh. 4 - Printing A printer needs 12,000 good copies of a...Ch. 4 - Prob. 39GPSCh. 4 - Prob. 40GPSCh. 4 - Prob. 41GPSCh. 4 - General Trades Find the missing dimension in the...Ch. 4 - Physics In a closed container, the pressure is...Ch. 4 - Automotive Trades The mechanical efficiency of a...Ch. 4 - Prob. 45GPSCh. 4 - Allied Health Calculate the percent concentration...Ch. 4 - Prob. 47GPSCh. 4 - Prob. 48GPSCh. 4 - Prob. 49GPSCh. 4 - Prob. 50GPSCh. 4 - Prob. 51GPSCh. 4 - Prob. 52GPSCh. 4 - Prob. 53GPSCh. 4 - Prob. 54GPSCh. 4 - Prob. 55GPSCh. 4 - Prob. 56GPSCh. 4 - Prob. 57GPSCh. 4 - Prob. 58GPSCh. 4 - Prob. 59GPSCh. 4 - Plumbing A homeowner purchases a new hot-water...Ch. 4 - Prob. 61GPSCh. 4 - Prob. 62GPSCh. 4 - Prob. 63GPSCh. 4 - Prob. 64GPSCh. 4 - Prob. 65GPS
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, subject and related others by exploring similar questions and additional content below.Similar questions
- Which degenerate conic is formed when a double cone is sliced through the apex by a plane parallel to the slant edge of the cone?arrow_forwardFor the problem below, what are the possible solutions for x? Select all that apply. 2 x²+8x +11 = 0 x2+8x+16 = (x+4)² = 5 1116arrow_forwardFor the problem below, what are the possible solutions for x? Select all that apply. x² + 12x - 62 = 0 x² + 12x + 36 = 62 + 36 (x+6)² = 98arrow_forward
- Select the polynomials below that can be solved using Completing the Square as written. 6m² +12m 8 = 0 Oh²-22x 7 x²+4x-10= 0 x² + 11x 11x 4 = 0arrow_forwardProve that the usual toplogy is firast countble or hot and second countble. ①let cofinte toplogy onx show that Sivast countble or hot and second firast. 3) let (x,d) be matricspace show that is first and second countble. 6 Show that Indiscret toplogy is firstand Second op countble or not.arrow_forwardH.W For any events A and B, show that 1. P(AB)s P(A)≤ P(AUB)≤ P(A) + P(B)arrow_forward
- a) Find the scalars p, q, r, s, k1, and k2. b) Is there a different linearly independent eigenvector associated to either k1 or k2? If yes,find it. If no, briefly explain.arrow_forwardPlz no chatgpt answer Plz Will upvotearrow_forward1/ Solve the following: 1 x + X + cos(3X) -75 -1 2 2 (5+1) e 5² + 5 + 1 3 L -1 1 5² (5²+1) 1 5(5-5)arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Algebra: Structure And Method, Book 1AlgebraISBN:9780395977224Author:Richard G. Brown, Mary P. Dolciani, Robert H. Sorgenfrey, William L. ColePublisher:McDougal LittellElementary AlgebraAlgebraISBN:9780998625713Author:Lynn Marecek, MaryAnne Anthony-SmithPublisher:OpenStax - Rice University
- Mathematics For Machine TechnologyAdvanced MathISBN:9781337798310Author:Peterson, John.Publisher:Cengage Learning,Holt Mcdougal Larson Pre-algebra: Student Edition...AlgebraISBN:9780547587776Author:HOLT MCDOUGALPublisher:HOLT MCDOUGAL
Algebra: Structure And Method, Book 1
Algebra
ISBN:9780395977224
Author:Richard G. Brown, Mary P. Dolciani, Robert H. Sorgenfrey, William L. Cole
Publisher:McDougal Littell
Elementary Algebra
Algebra
ISBN:9780998625713
Author:Lynn Marecek, MaryAnne Anthony-Smith
Publisher:OpenStax - Rice University
Mathematics For Machine Technology
Advanced Math
ISBN:9781337798310
Author:Peterson, John.
Publisher:Cengage Learning,
Holt Mcdougal Larson Pre-algebra: Student Edition...
Algebra
ISBN:9780547587776
Author:HOLT MCDOUGAL
Publisher:HOLT MCDOUGAL
Use of ALGEBRA in REAL LIFE; Author: Fast and Easy Maths !;https://www.youtube.com/watch?v=9_PbWFpvkDc;License: Standard YouTube License, CC-BY
Compound Interest Formula Explained, Investment, Monthly & Continuously, Word Problems, Algebra; Author: The Organic Chemistry Tutor;https://www.youtube.com/watch?v=P182Abv3fOk;License: Standard YouTube License, CC-BY
Applications of Algebra (Digit, Age, Work, Clock, Mixture and Rate Problems); Author: EngineerProf PH;https://www.youtube.com/watch?v=Y8aJ_wYCS2g;License: Standard YouTube License, CC-BY