Concept explainers
(a)
Calculate the moist unit weight of soil.
(a)

Answer to Problem 3.7P
The moist unit weight of soil is
Explanation of Solution
Given information:
The volume
The moist mass
The moisture content
The specific gravity of the soil solids
Calculation:
Calculate the moist unit weight of the soil
Substitute
Hence, the moist unit weight of soil is
(b)
Calculate the dry unit weight of soil.
(b)

Answer to Problem 3.7P
The dry unit weight of soil is
Explanation of Solution
Given information:
The volume
The moist mass
The moisture content
The specific gravity of the soil solids
Calculation:
Refer to part (a).
The moist unit weight of soil is
Calculate the dry unit weight of the soil
Substitute
Hence, the dry unit weight of soil is
(c)
Calculate the void ratio of soil.
(c)

Answer to Problem 3.7P
The void ratio of soil is
Explanation of Solution
Given information:
The volume
The moist mass
The moisture content
The specific gravity of the soil solids
Calculation:
Refer to part (b).
The dry unit weight of soil is
Consider the unit weight of water
Calculate the void ratio
Substitute
Hence, the void ratio of soil is
(d)
Calculate the porosity of soil.
(d)

Answer to Problem 3.7P
The porosity of soil is
Explanation of Solution
Given information:
The volume
The moist mass
The moisture content
The specific gravity of the soil solids
Calculation:
Refer to part (c).
The void ratio of soil is
Calculate the void ratio
Substitute
Hence, the porosity of soil is
(e)
Calculate the degree of saturation.
(e)

Answer to Problem 3.7P
The degree of saturation is
Explanation of Solution
Given information:
The volume
The moist mass
The moisture content
The specific gravity of the soil solids
Calculation:
Refer to part (c).
The void ratio of soil is
Calculate the degree of saturation
Substitute
Hence, the degree of saturation is
(f)
Calculate the volume of water.
(f)

Answer to Problem 3.7P
The volume of water is
Explanation of Solution
Given information:
The volume
The moist mass
The moisture content
The specific gravity of the soil solids
Calculation:
Refer to part (a).
The moist unit weight of soil
Refer to part (b).
The dry unit weight of soil
Consider the unit weight of water
Calculate the volume of water
Substitute
Therefore, the volume of water is
Want to see more full solutions like this?
Chapter 3 Solutions
EBK PRINCIPLES OF GEOTECHNICAL ENGINEER
- What are the total earned work hours at completion for the column forms?arrow_forward6000 units have been installed to date with 9,000 units to install. Labor costs are $23,300.00 to date. What is the unit cost for labor to date?arrow_forwardThe base rate for labor is $15/hr. The labor burden is 35% and 3% for small tools for the labor. There are 1000 units to install. Records indicate that trade workers can install 10 units per hour, per trade worker. The owners need 15% overhead and profit to pay bills, pay interest on loan and provide some profit to the partners. What is the minimum bid assuming no risk avoidance factor?arrow_forward
- 5. (20 Points) Consider a channel width change in the same 7-foot wide rectangular in Problem 4. The horizontal channel narrows as depicted below. The flow rate is 90 cfs, and the energy loss (headloss) through the transition is 0.05 feet. The water depth at the entrance to the transition is initially 4'. 1 b₁ TOTAL ENERGY LINE V² 129 У1 I b₂ TOP VIEW 2 PROFILE VIEW h₁ = 0.05 EGL Y₂ = ? a) b) c) 2 Determine the width, b₂ that will cause a choke at location 2. Determine the water depth at the downstream end of the channel transition (y₂) section if b₂ = 5 feet. Calculate the change in water level after the transition. Plot the specific energy diagram showing all key points. Provide printout in homework. d) What will occur if b₂ = = 1.5 ft.?arrow_forward4. (20 Points) A transition section has been proposed to raise the bed level a height Dz in a 7-foot wide rectangular channel. The design flow rate in the channel is 90 cfs, and the energy loss (headloss) through the transition is 0.05 feet. The water depth at the entrance to the transition section is initially 4 feet. b₁ = b = b2 1 TOTAL ENERGY LINE V² 129 Ут TOP VIEW 2 hloss = 0.05 " EGL Y₂ = ? PROFILE VIEW a) Determine the minimum bed level rise, Dz, which will choke the flow. b) If the step height, Dz = 1 ft, determine the water depth (y2) at the downstream end of the channel transition section. Calculate the amount the water level drops or rises over the step. c) Plot the specific energy diagram showing all key points. Provide printout in Bework. d) What will occur if Dz = 3.0 ft.?. Crest Front Viewarrow_forward1. (20 Points) Determine the critical depth in the trapezoidal drainage ditch shown below. The slope of the ditch is 0.0016, the side slopes are 1V:2.5H, the bottom width is b = 14', and the design discharge is 500 cfs. At this discharge the depth is y = 4.25'. Also, determine the flow regime and calculate the Froude number. Ye= ? Z barrow_forward
- 3. (20 Points) A broad crested weir, 10 feet high, will be constructed in a rectangular channel B feet wide. The weir crest extends a length of B = 120 feet between the banks with 2 - 4 foot wide, round nosed piers in the channel. The width of the weir crest is 8 feet. If H = 6', determine the design discharge for the weir.arrow_forwardParking Needs vs. Alternative Transportation Methods for presentation slides include images and graphsarrow_forwardPlease explain step by step and show formulararrow_forward
- Principles of Geotechnical Engineering (MindTap C...Civil EngineeringISBN:9781305970939Author:Braja M. Das, Khaled SobhanPublisher:Cengage LearningFundamentals of Geotechnical Engineering (MindTap...Civil EngineeringISBN:9781305635180Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage LearningPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning
- Principles of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781305081550Author:Braja M. DasPublisher:Cengage LearningConstruction Materials, Methods and Techniques (M...Civil EngineeringISBN:9781305086272Author:William P. Spence, Eva KultermannPublisher:Cengage Learning