Chapter 3, Problem 28R
- a. A 25-ampere branch-circuit conductor is derated to 70%. It is important to provide proper overcurrent protection for these conductors. The derated conductor ampacity is ___________________________________________________________________________________________________________________________________
- b. If the connected load is a “fixed” nonmotor, noncontinuous load, the branch-circuit overcurrent device may be sized at (20) (25) amperes. (Circle the correct answer.)
- c. If the above circuits supply receptacle outlets, the branch-circuit overcurrent device must be sized at not over (15) (20) (25) amperes. (Circle the correct answer.)
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
When connecting a multiwire (3-wire) circuit to a single phase panel, one ungrounded conductor must be connected to the ____ phase and the other ungrounded conductor must be connected to the ____ phase.
Select one:
a. A, A
b. B, B
c. A, B
d. doesn’t matter
A? Conductor is defined in NEC 240.2 as a conductor, other than a service conductor, having overcurrent protection ahead of its point of supply that exceeds the value permitted for similar conductors that are not taps.
A. Faulted b. Tap c. Magnetic d. Copper-like
12. Which of the following statements about ground faults is true?A. They can happen if a conductive tool is dropped in an energized equipment's electrical enclosure.B. They usually occur between any grounded circuit conductor and the equipment grounding conductor.C. They can't result from human error.D. They're often normal and typically intentional.
Chapter 3 Solutions
Electrical Wiring: Residental - With Plans (Paperback) Package
Ch. 3 - Prob. 1RCh. 3 - How are branch circuits rated? See NEC 210.3._____Ch. 3 - Prob. 3RCh. 3 - Prob. 4RCh. 3 - What spaces are not included in the floor area...Ch. 3 - What is the unit load per square foot for dwelling...Ch. 3 - According to NEC 210.50(C), a laundry equipment...Ch. 3 - How is the total load in volt-amperes for lighting...Ch. 3 - How is the total lighting load in amperes...Ch. 3 - How is the required number of branch circuits...
Ch. 3 - What is the minimum number of 15-ampere lighting...Ch. 3 - How many lighting branch circuits are provided in...Ch. 3 - Prob. 13RCh. 3 - How is the load determined for outlets supplying...Ch. 3 - What type of circuits must be provided for...Ch. 3 - Prob. 16RCh. 3 - In a single-family dwelling, how is overcurrent...Ch. 3 - Prob. 18RCh. 3 - The minimum number of outdoor receptacles for a...Ch. 3 - The Code indicates the rooms in a dwelling that...Ch. 3 - Prob. 21RCh. 3 - Prob. 22RCh. 3 - Prob. 23RCh. 3 - Prob. 24RCh. 3 - Prob. 25RCh. 3 - Although the Code contains many exceptions to the...Ch. 3 - The rating of a branch circuit is based on (Circle...Ch. 3 - a. A 25-ampere branch-circuit conductor is derated...Ch. 3 - Prob. 29RCh. 3 - Prob. 30RCh. 3 - Prob. 31RCh. 3 - Prob. 32RCh. 3 - A split-level home has one stairway that has six...Ch. 3 - Prob. 34RCh. 3 - Prob. 35RCh. 3 - Prob. 36RCh. 3 - In the past, it was common practice to connect the...Ch. 3 - If a residence has two bathrooms, the Code states:...Ch. 3 - Prob. 39RCh. 3 - Prob. 40RCh. 3 - Prob. 41RCh. 3 - Prob. 42RCh. 3 - Prob. 43R
Additional Engineering Textbook Solutions
Find more solutions based on key concepts
How are relationships between tables expressed in a relational database?
Modern Database Management
How is the hydrodynamic entry length defined for flow in a pipe? Is the entry length longer in laminar or turbu...
Fluid Mechanics: Fundamentals and Applications
Using your text editor, enter (that is, type in) the C++ program shown in Display 1.8. Be certain to type the f...
Problem Solving with C++ (10th Edition)
Computers process data under the control of sets of instructions called
Java How to Program, Early Objects (11th Edition) (Deitel: How to Program)
CONCEPT QUESTIONS
15.CQ3 The ball rolls without slipping on the fixed surface as shown. What is the direction ...
Vector Mechanics for Engineers: Statics and Dynamics
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.Similar questions
- 1. Which of the following statements about equipment grounding conductors is true?A. Unacceptable equipment grounding conductors include conduit, tubing, and cable armor.B. They must be capable of withstanding the higher level of ground-fault current to perform their safety function.C. They increase voltages above ground potential on conductors and equipment enclosures during normal operation.D. When they're far from their associated circuit conductors, impedance values are kept as low as possible during ground-faultconditions.arrow_forwardof p o How many conductors enter the ceiling fan/light wall box? Switch ond out let boxes s tirst 10. What type and size of box may be used for the ceiling fan/light wall box?. 11. What type of covers are used with 4 in. square outlet boxes? 12. a. Does the circuit for the Master Bedroom have a grounded circuit conductor? b. Does it have an equipment grounding conductor? c. Explain the difference between a "grounded" conductor and an "equipment grounding" conductor. 13. Approximately how many feet (meters) of 2-wire cable and 3-wire cable are needed to ft complete the circuit supplying the Master Bedroom? Two-wire cable: ft (- m). m). Three-wire cable: 14. If the cable is laid in notches in the corner studs, what protection for the cable must be provided? 15. How high are the receptacles mounted above the finished floor in this bedroom? 16. Approximately how far from the bedroom door is the first receptacle mounted? (See the plans.) 17. What is the distance from the finished floor to…arrow_forwarda. Does the circuit for the Master Bedroom have a grounded circuit conductor? ____________________ b. Does it have an equipment grounding conductor? ____________________ c. Explain the difference between a grounded conductor and an equipment grounding conductor. ____________________ ____________________arrow_forward
- Grounding lighting fixtures. Threre are specific requirements for grounding lighting fixtures. How must they be grounded and with what size conductors?arrow_forwardA branch circuit conists of five conveniance outlets. Determine the size of the conductor to be used to the said branch circuit. Plrase indicate the type of conductors to be usedarrow_forwardSeven 8 AWG copper conductors are run in conduit. Each conductor has type THHN insulation. The conduit is located in an area with an ambient temperature of 138oF. What is the ampacity of each conductors?arrow_forward
- To testing installation of grounds, the usual procedure is to connect one lead of the megohmmeter to one of the conductors, then the other lead is___. A, connected to another conductor b, connected to the conduit or raceway c. Connected to a special grounding electrode on the megohmmeter d. Left unconnectedarrow_forwardi need the answer quicklyarrow_forwardConnectors marked ____ are suitable for use with aluminum, copper, or copper-clad conductors? 1. CO-ALR only 2. AL/CU only 3. UL 9 4. CO-ALR and AL/CU What is the correct answer? Why?arrow_forward
- 5. Which of the following descriptions of a ground ring is correct?A. A ground ring is a circular formation that's made up of six or more grounding electrodes.B. A ground ring is a coiled conductor that's buried underneath a utility pole.C. A ground ring is a device that's used to clamp a conductor to a water pipe.D. A ground ring is a bare copper conductor that will encircle an entire structure underground.arrow_forwardAn insulated grounded conductor ____ or larger is permitted to be re-identified at the time of installation, by a distinctive white or gray marking at its terminations. Select one: a. 4 AWG b. 6 AWG c. 8 AWG d. 10 AWGarrow_forwardThe minimum point of attachment of the service-drop conductors to a building must in no case be less than above finished grade. A. 8 ft B. 10 ft C. 12 ft D. 15 ftarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- EBK ELECTRICAL WIRING RESIDENTIALElectrical EngineeringISBN:9781337516549Author:SimmonsPublisher:CENGAGE LEARNING - CONSIGNMENT
EBK ELECTRICAL WIRING RESIDENTIAL
Electrical Engineering
ISBN:9781337516549
Author:Simmons
Publisher:CENGAGE LEARNING - CONSIGNMENT
Why HIGH VOLTAGE DC power Transmission; Author: ElectroBOOM;https://www.youtube.com/watch?v=DFQG9kuXSxg;License: Standard Youtube License