Concept explainers
a)
To determine: The daily production plan which would minimize the cost of meeting the daily demand of the company.
Introduction: In linear programming, unbounded solution would occur when the objective function is infinite. If no solution satisfied the constraints then it is said to be unfeasible solution.
a)
Explanation of Solution
Determine the daily production plan which would minimize the cost of meeting the daily demand of the company using solver:
Formulae to determine the total cost:
Solver parameters is given as follows:
b)
To draw: The daily production plan which would minimize the cost of meeting the daily demand of the company graphically.
Introduction: In linear programming, unbounded solution would occur when the objective function is infinite. If no solution satisfied the constraints then it is said to be unfeasible solution.
b)
Explanation of Solution
Determine the daily production plan which would minimize the cost of meeting the daily demand of the company:
Draw the graph:
c)
To determine: The increase in the total cost before the change in the decision variable.
Introduction: In linear programming, unbounded solution would occur when the objective function is infinite. If no solution satisfied the constraints then it is said to be unfeasible solution.
c)
Explanation of Solution
Determine the daily production plan which would minimize the cost of meeting the daily demand of the company:
Solver table:
The cost of process 2 should be increased from $100 to $1,000 to determine the total cost shown in above solver table.
Want to see more full solutions like this?
Chapter 3 Solutions
Practical Management Science
- Seas Beginning sells clothing by mail order. An important question is when to strike a customer from the companys mailing list. At present, the company strikes a customer from its mailing list if a customer fails to order from six consecutive catalogs. The company wants to know whether striking a customer from its list after a customer fails to order from four consecutive catalogs results in a higher profit per customer. The following data are available: If a customer placed an order the last time she received a catalog, then there is a 20% chance she will order from the next catalog. If a customer last placed an order one catalog ago, there is a 16% chance she will order from the next catalog she receives. If a customer last placed an order two catalogs ago, there is a 12% chance she will order from the next catalog she receives. If a customer last placed an order three catalogs ago, there is an 8% chance she will order from the next catalog she receives. If a customer last placed an order four catalogs ago, there is a 4% chance she will order from the next catalog she receives. If a customer last placed an order five catalogs ago, there is a 2% chance she will order from the next catalog she receives. It costs 2 to send a catalog, and the average profit per order is 30. Assume a customer has just placed an order. To maximize expected profit per customer, would Seas Beginning make more money canceling such a customer after six nonorders or four nonorders?arrow_forwardA company has one machine which can be used to make product Alpha and product Beta. Each unit of product Alpha requires 45 minutes of machine time, while each unit of product Beta requires 37 minutes of machine time. The machine can be used for 8 hours per day and 5 days per week. Next week the company will produce 23 units of product Alpha. After completing the production of Alpha, the company will produce product Beta. How many units of product Beta can be produced next week? Use at least 4 decimals.You must showm your calculation steps and brief explanation on your Excel spreadsheets.arrow_forwardA solid steel shaft is to transmit a torque of 10kN - m If the shearing stress is not to exceed overline 45MPa find the minimum diameter of the shaft.A solid steel shaft is to transmit a torque of 10kN - m If the shearing stress is not to exceed overline 45MPa find the minimum diameter of the shaft. A solid steel shaft is to transmit a torque of 10kN - m If the shearing stress is not to exceed overline 45MPa find the minimum diameter of the shaft?arrow_forward
- A company makes four products that have the following characteristics: Product A sells for $75 but needs $40 of materials to produce; Product B sells for $90 but needs $65 of materials to produce; Product C sells for $110 but needs $80 of materials to produce; Product D sells for $135 but needs $105 of materials to produce. The processing requirements for each product on each of the four machines are shown in the table. Work centers W, X, Y, and Z are available for 5 days per week, 1 shift per day (8 hrs.) and have no setup time when switching between products. Market demand is 50 As, 60 Bs, 70 Cs, and 80 Ds per week. In the questions that follow, the traditional method refers to maximizing the contribution margin per unit for each product, and the bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product. Each worker is paid $15 per hour and is paid for an entire week, regardless of how much the worker is used. Answer the following…arrow_forwardA large building may require an automated alarm system which monitors and controls all fire and security alarms in the building. Normally, the building is divided into zones and a number of alarms are associated with each zone. Alarms alert a central manned control area who may pass these on to the emergency services or may respond personally.Factors which have to be taken into account in building such a system are:Ø If the control area is unmanned and an alarm is activated this alarm should not be ignored if it is potentially serious. Emergency services should be automatically called.Ø Some but not all parts of the building may be equipped with sprinkler systems or systems to shut down electrical equipment. These should be activated if a fire alarm is confirmed. They should not be activated if there are people in the same room.Ø The building may be equipped with direction indicators which illuminate the route to the nearest exit. These should be activated when a fire alarm is…arrow_forwardKAPC, a pharmaceutical company located in rural Kansas, is finding it difficult to retain its employees, who frequently leave after just six months of working at KAPC for jobs at pharmaceutical companies paying higher wages in Chicago. To address its problem with labor turnover, human resource officers at KAPC decide to run an experiment. Of their next 100 newly hired employees, 25 will randomly be selected to receive a housing voucher worth up to $4,000 per year to offset property taxes. To take advantage of this program, the employee must not only be randomly selected into the program but she must also purchase a home. Of the 25 employees selected into the housing voucher program, 7 leave KAPC within 12 months of starting. Of the 75 employees not selected into the program, 37 leave KAPC within 12 months of starting.a. Provide a difference-in-differences estimate of the effect the housing voucher program has on retention at KAPC.b. Suppose KAPC spends $10,000 in hiring costs each time…arrow_forward
- A company makes three types of candy and packages them in three assortments. Assortment I contains 4 cherry, 4 lemon, and 12 lime candies, and sells for a profit of $4.00. Assortment Il contains 12 cherry, 4 lemon, and 4 lime candies, and sells for a profit of $3.00. Assortment III contains 8 cherry, 8 lemon, and 8 lime candies, and sells for a profit of $5.00. They can make 5,200 cherry, 4,000 lemon, and 6,000 lime candies weekly. How many boxes of each type should the company produce each week in order to maximize its profit (assuming that all boxes produced can be sold)? What is the maximum profit? Select the correct choice below and fill in any answer boxes within your choice. OA. The maximum profit is $ when boxes of assortment 1. boxes of assortment II and assortment III are produced. OB. There is no way for the company to maximize its profit boxes ofarrow_forwardMansfield Energy Corp has recently taken over a fuel supply plant that is in close proximity to one of its competitors. The collection point for both fuel companies is located at the same seaport. The general manager of Mansfield Energy Corp intends to hire a consultant to train Mansfield Energy Corp’s employees regarding the new procedures for affixing the fuel lines at the collection point to the high-capacity storage tanks and is debating whether the competitor should be invited to attend given that they use the same seaport. The general manager is mindful of the high cost of hiring the consultant and sourcing the equipment to train Mansfield Energy Corp’s employees and is therefore hesitant to invite his competitors. The manager is also aware that there have been no accidents at the port since operations started 10 years ago and might not invite the competitors to participate in the training. The General Manager decides, based on the high price for the consultant (facilitation fee,…arrow_forward(b) A company produces 3 products A, B and C processed on 3 machines P, Q, R before completion. Machine P can process 25 units of A or 50 unit of B or 75 units of C per hour. Machine Q can process 50 units of any of the products per hour. Machine R can process 50 units of A or 25 unit of B or 100 units of C per hour. The processing hours available on machines P, Q and R are 12, 12 and 13 respectively. Use matrix method, find (i) How many units of each of the three products can be produced per day (ii) The production cost per unit, if cost per hour of operating machines A,B and C are N$500, N$1,000 and N$1,500 respectively. (iii) The total cost of production.arrow_forward
- 4) The making of rivet holes in structural steel members can be done by 2 methods. The first method consists of laying out the position of the holes in the members and using a drill press costing P100k. The machinist is paid P60 per hour and he can drill 80 holes per hour. The second method makes use of a multiple-punch machine costing P80k. The punch operator is paid P40 an hour and he can punch out 1 hole for 3 seconds. This method also requires an expense of P1.25 per hole to set the machine. (a) if all other costs are assumed equal, what is the total cost for each machine for 10k holes, assuming the total cost of each machine to be charged to these holes? (b) for how many holes will the costs be equal?arrow_forwardA group of students organizes a bake sale in which they sell hundreds of cookies at$1 per piece. They set up a table on campus and wait for students to come and purchasetheir cookies. Consider the following variables in this bake sale operation:1. Size of the cookies2. Weather conditions on campus3. Organization of the table4. Number of cookies sold5. Competition from other fund-raisers coinciding on campus6. Amount of advertising and shouting of the students at the bake sale table7. Number of students on campus that dayWhich of these variables are input variables?a. 1 and 2b. 1 and 3c. 1, 3, and 5d. 1, 3, and 6arrow_forwardI need 3 answersarrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,