What is the objective of a quantity takeoff?

Expert Solution & Answer
Check Mark
To determine

The objective of quantity takeoff.

Explanation of Solution

The target of a quantity takeoff is to separate everything into quantifiable and concise advances dependent on the bid drawings and specifications. By separating the work along these lines, estimators can dole out material, labour, and equipment expenses to each progression, and eventually build up an all-out expense for the task. The smaller and increasingly careful the estimations, the more exact the final quote will be.

Want to see more full solutions like this?

Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
Please solve the example, explaining the solution steps and writing by hand
Please solve the example, explaining the solution steps and writing by hand
Note: (please show handwritten answers, and no AI usage !) Provide a clear, step-by-step handwritten solution (without any detailed explanations). Ensure the work is simplified and completed manually, adhering to expert-level accuracy. Refer to the provided image for clarity and ensure all calculations are double-checked for correctness before submission. Thank you!.   Question 1:  A cylindrical soil sample is connected to two water reservoirs: a) Determine the pressure, elevation, and total head at a point one meter above the bottom of the sample (point A). b) Calculate the pore pressure and effective stress at point A if the soil has a saturated unit weight of 18.7kN/m^3. c) Determine the water flow rate though the sample if the soil has a coefficient of permeability of 0.19 cm/s and the radius of the sample is 20 mm. d) Is it possible for the soil to reach the “quick condition”(zero effective stress) by raising the level of the water in the upper reservoir? Why or why not?. Question…
Knowledge Booster
Background pattern image
Civil Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,
Text book image
Engineering Fundamentals: An Introduction to Engi...
Civil Engineering
ISBN:9781305084766
Author:Saeed Moaveni
Publisher:Cengage Learning
Text book image
Construction Materials, Methods and Techniques (M...
Civil Engineering
ISBN:9781305086272
Author:William P. Spence, Eva Kultermann
Publisher:Cengage Learning
Text book image
Architectural Drafting and Design (MindTap Course...
Civil Engineering
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Cengage Learning
What Is A Construction Takeoff? | Are They Still Necessary In Quantity Surveying?; Author: Metroun Quantity Surveying;https://www.youtube.com/watch?v=uTWoDPtcOjg;License: Standard Youtube License