Table 2.3 breaks down the number of major jobs or activities involved in painting a two-story house.

  1. a. Develop a CPM network.
  2. b. Determine the critical path of the network.
  3. c. Determine the expected project’s duration time period.

Table 2.3: Problem 1

Chapter 2.8, Problem 1P, Table 2.3 breaks down the number of major jobs or activities involved in painting a two-story house.

(a)

Expert Solution
Check Mark
To determine

A CPM network.

Explanation of Solution

The CPM network for the data given in the Table 2.3 is shown below:

ENGINEERING DESIGN PROCESS, Chapter 2.8, Problem 1P , additional homework tip  1

(b)

Expert Solution
Check Mark
To determine

The critical path of the network.

Answer to Problem 1P

The critical path activities are as follows.

Critical Paths
A-B-D-E-G-H-I-K
A-B-D-E-G-H-J-K
A-C-D-E-G-H-I-K
A-C-D-E-G-H-J-K

Explanation of Solution

Using Excel spread sheet the network path is framed and its critical path is identified and shown below:

ActivityEarly Start TimeEarly Finish Time
DurationLate Start TimeLate Finish Time
Float/Slack

ENGINEERING DESIGN PROCESS, Chapter 2.8, Problem 1P , additional homework tip  2

Formula:

ENGINEERING DESIGN PROCESS, Chapter 2.8, Problem 1P , additional homework tip  3

ENGINEERING DESIGN PROCESS, Chapter 2.8, Problem 1P , additional homework tip  4

ENGINEERING DESIGN PROCESS, Chapter 2.8, Problem 1P , additional homework tip  5

The identified network paths are shown below with duration:

PathsDuration
A-B-D-E-F-H-J-K23
A-B-D-E-G-H-I-K26
A-B-D-E-G-H-J-K26
A-C-D-E-F-H-I-K23
A-C-D-E-F-H-J-K23
A-C-D-E-G-H-I-K26
A-C-D-E-G-H-J-K26

The path with the longest duration is the critical path. Hence, the critical path activities are as follows.

Critical Paths
A-B-D-E-G-H-I-K
A-B-D-E-G-H-J-K
A-C-D-E-G-H-I-K
A-C-D-E-G-H-J-K

(c)

Expert Solution
Check Mark
To determine

The expected project duration time.

Explanation of Solution

Refer part (b)

The expected project duration time is shown below:

PathsDuration
A-B-D-E-G-H-I-K26
A-B-D-E-G-H-J-K26
A-C-D-E-G-H-I-K26
A-C-D-E-G-H-J-K26

Want to see more full solutions like this?

Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
My answers are incorrect
Picture
What is the weight of a 5-kg substance in N, kN, kg·m/s², kgf, Ibm-ft/s², and lbf? The weight of a 5-kg substance in N is 49.05 N. The weight of a 5-kg substance in kN is KN. The weight of a 5-kg substance in kg·m/s² is 49.05 kg-m/s². The weight of a 5-kg substance in kgf is 5.0 kgf. The weight of a 5-kg substance in Ibm-ft/s² is 11.02 lbm-ft/s². The weight of a 5-kg substance in lbf is 11.023 lbf.
Knowledge Booster
Background pattern image
Mechanical Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Automotive Technology: A Systems Approach (MindTa...
Mechanical Engineering
ISBN:9781133612315
Author:Jack Erjavec, Rob Thompson
Publisher:Cengage Learning
Text book image
Precision Machining Technology (MindTap Course Li...
Mechanical Engineering
ISBN:9781285444543
Author:Peter J. Hoffman, Eric S. Hopewell, Brian Janes
Publisher:Cengage Learning
The Engineering Design Process - Simplified; Author: College & Career Ready Labs │ Paxton Patterson;https://www.youtube.com/watch?v=KpWrHVo972g;License: Standard Youtube License