Date 9/16:

Rework percentage is 2.7%.

Scrap percentage is 3.6%.

Date 9/17:

Rework percentage is 1.8%.

Scrap percentage is 3.0%.

Date 9/18:

Rework percentage is 3.1%.

Scrap percentage is 2.0%.

Explanation of Solution

Given information:

Below table shows the total pieces manufactured along with rework and scrap defective pieces.

  Mathematics for Machine Technology, Chapter 22, Problem 21A , additional homework tip  1

Calculation:

We have been given a table with details of total pieces manufactured along with defective pieces.

  Mathematics for Machine Technology, Chapter 22, Problem 21A , additional homework tip  2

Now we need to find the individual defect percentage for each day. Total pieces manufactured will be base and number of defective pieces will be percentage.

As we know the proportion to find percentage is given as

  PB=R100   where, P=percentage, B= base and R=rate

Date 9/16:

Rework piece =44 i.e. P=44 and total manufactured piece =1650 i.e. B=1650.

Putting these value in standard proportion,

  PB=R100441650=R100                           {Put B=1650 and P=44}Applying cross multiplication,1650R=44×100R=44×1001650R=2.6667R=2.7                                   {Rounding off to 1 decimal places}

Hence, the rework percentage is 2.7%.

Similarly, scrap piece =59 i.e. P=59 and total manufactured piece =1650 i.e. B=1650.

Putting these value in standard proportion,

  PB=R100591650=R100                           {Put B=1650 and P=59}Applying cross multiplication,1650R=59×100R=59×1001650R=3.575757R=3.6                                   {Rounding off to 1 decimal places}

Hence, the scrap percentage is 3.6%.

Date 9/17:

Rework piece =29 i.e. P=29 and total manufactured piece =1596 i.e. B=1596.

Putting these value in standard proportion,

  PB=R100291596=R100                           {Put B=1596 and P=29}Applying cross multiplication,1596R=29×100R=29×1001596R=1.81704R=1.8                                   {Rounding off to 1 decimal places}

Hence, the rework percentage is 1.8%.

Similarly, scrap piece =48 i.e. P=48 and total manufactured piece =1596 i.e. B=1596.

Putting these value in standard proportion,

  PB=R100481596=R100                           {Put B=1596 and P=48}Applying cross multiplication,1596R=48×100R=48×1001596R=3.0075R=3.0                                   {Rounding off to 1 decimal places}

Hence, the scrap percentage is 3.0%.

Date 9/18:

Rework piece =52 i.e. P=52 and total manufactured piece =1685 i.e. B=1685.

Putting these value in standard proportion,

  PB=R100521685=R100                           {Put B=1685 and P=52}Applying cross multiplication,1685R=52×100R=52×1001685R=3.08605R=3.1                                   {Rounding off to 1 decimal places}

Hence, the rework percentage is 3.1%.

Similarly, scrap piece =34 i.e. P=34 and total manufactured piece =1685 i.e. B=1685.

Putting these value in standard proportion,

  PB=R100341685=R100                           {Put B=1685 and P=34}Applying cross multiplication,1685R=34×100R=34×1001685R=2.01750R=2.0                                   {Rounding off to 1 decimal places}

Hence, the scrap percentage is 2.0%.

Thus,

Date 9/16:

Rework percentage is 2.7%.

Scrap percentage is 3.6%.

Date 9/17:

Rework percentage is 1.8%.

Scrap percentage is 3.0%.

Date 9/18:

Rework percentage is 3.1%.

Scrap percentage is 2.0%.

Want to see more full solutions like this?

Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
Give an example of a graph with at least 3 vertices that has exactly 2 automorphisms(one of which is necessarily the identity automorphism). Prove that your example iscorrect.
3. [10 marks] Let Go (Vo, Eo) and G₁ = (V1, E1) be two graphs that ⚫ have at least 2 vertices each, ⚫are disjoint (i.e., Von V₁ = 0), ⚫ and are both Eulerian. Consider connecting Go and G₁ by adding a set of new edges F, where each new edge has one end in Vo and the other end in V₁. (a) Is it possible to add a set of edges F of the form (x, y) with x € Vo and y = V₁ so that the resulting graph (VUV₁, Eo UE₁ UF) is Eulerian? (b) If so, what is the size of the smallest possible F? Prove that your answers are correct.
Let T be a tree. Prove that if T has a vertex of degree k, then T has at least k leaves.

Chapter 22 Solutions

Mathematics for Machine Technology

Ch. 22 - Finding Percentage, Percent, and Base in Practical...Ch. 22 - Finding Percentage, Percent, and Base in Practical...Ch. 22 - Finding Percentage, Percent, and Base in Practical...Ch. 22 - Finding Percentage, Percent, and Base in Practical...Ch. 22 - Finding Percentage, Percent, and Base in Practical...Ch. 22 - Finding Percentage, Percent, and Base in Practical...Ch. 22 - Prob. 17ACh. 22 - Finding Percentage, Percent, and Base in Practical...Ch. 22 - Finding Percentage, Percent, and Base in Practical...Ch. 22 - Finding Percentage, Percent, and Base in Practical...Ch. 22 - Prob. 21ACh. 22 - Prob. 22ACh. 22 - Finding Percentage, Percent, and Base in Practical...Ch. 22 - Finding Percentage, Percent, and Base in Practical...Ch. 22 - Prob. 25ACh. 22 - Prob. 26ACh. 22 - Finding Percentage, Percent, and Base in Practical...Ch. 22 - Finding Percentage, Percent, and Base in Practical...Ch. 22 - Finding Percentage, Percent, and Base in Practical...Ch. 22 - Finding Percentage, Percent, and Base in Practical...Ch. 22 - Prob. 31ACh. 22 - A manufacturer estimates that 15,500 pieces per...Ch. 22 - The average percent defective product of a...Ch. 22 - Prob. 34ACh. 22 - Prob. 35ACh. 22 - The cost of one dozen cutters is listed as $525. A...Ch. 22 - A manufacturer's production this week is 3620...Ch. 22 - Two machines are used to produce the same product....Ch. 22 - Allowing for scrap, a firm produced 1890 pieces....Ch. 22 - A manufacturing company receives $122,000 upon the...Ch. 22 - Prob. 41A
Knowledge Booster
Background pattern image
Advanced Math
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, advanced-math and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Text book image
Holt Mcdougal Larson Pre-algebra: Student Edition...
Algebra
ISBN:9780547587776
Author:HOLT MCDOUGAL
Publisher:HOLT MCDOUGAL
Text book image
Mathematics For Machine Technology
Advanced Math
ISBN:9781337798310
Author:Peterson, John.
Publisher:Cengage Learning,
Text book image
Algebra: Structure And Method, Book 1
Algebra
ISBN:9780395977224
Author:Richard G. Brown, Mary P. Dolciani, Robert H. Sorgenfrey, William L. Cole
Publisher:McDougal Littell
Text book image
Elementary Algebra
Algebra
ISBN:9780998625713
Author:Lynn Marecek, MaryAnne Anthony-Smith
Publisher:OpenStax - Rice University
Use of ALGEBRA in REAL LIFE; Author: Fast and Easy Maths !;https://www.youtube.com/watch?v=9_PbWFpvkDc;License: Standard YouTube License, CC-BY
Compound Interest Formula Explained, Investment, Monthly & Continuously, Word Problems, Algebra; Author: The Organic Chemistry Tutor;https://www.youtube.com/watch?v=P182Abv3fOk;License: Standard YouTube License, CC-BY
Applications of Algebra (Digit, Age, Work, Clock, Mixture and Rate Problems); Author: EngineerProf PH;https://www.youtube.com/watch?v=Y8aJ_wYCS2g;License: Standard YouTube License, CC-BY