Elementary Surveying: An Introduction To Geomatics (15th Edition)
Elementary Surveying: An Introduction To Geomatics (15th Edition)
15th Edition
ISBN: 9780134604657
Author: Charles D. Ghilani
Publisher: PEARSON
bartleby

Concept explainers

Question
Book Icon
Chapter 21, Problem 21.17P

(a)

To determine

The surveyor’s authority if the line established is agreeable to both clients.

It is the surveyor’s responsibility to resolve any dispute that exists between the parties involved. Disputes between two neighborsregarding their boundary line should be at first tried to be solved by l cooperation if parties are not ready to set any compromise then the surveyor should act asthe witness ofthe legal proceedings.

The surveyor’s authority or responsibility if the line established is agreeable to both clients is to go for the written agreement of acompromise between the parties involved.

(b)

To determine

The surveyor’s authority if the line established is not accepted by one or both clients.

It is the surveyor’s responsibility to resolve any dispute that exists between the parties involved. Disputes between two neighbors regarding their boundary line should be at first tried to be solved by cooperation if parties are not ready to set any compromise then the surveyor should act as witness of the legal proceedings.

The surveyor’s authority if the line established is not accepted by one or both clients then the disputes can’t be solved by mutual compromise. Here boundaries must be established by legal proceedings of the court where surveyor will be an expert witness.

Blurred answer
Students have asked these similar questions
The drainage system shown in fig 14.35 is designed to collect the stormwater from 3 atreas The areas runoof coefficients and overland flow times are as follows The rainfall intensity i (mm/h) as a function of rainfall duration t(min) is i =1.12/t+110 The flow time in sewer 1-2 is 2min and in sewer 2-3 is 2.5 min
Please answer the question from the picture, show each step and explain please. Thank you so much
Figure 1 shows the plan view of an Exhibition Hall with dimensions L1 x L2. The structure is to be constructed in a coastal region which will be exposed to mostly mild environmental conditions and should provide a 1.5-hour fire resistance. It is known that the underlying foundation soil contains sulphate and other organic compounds. The layout of the structure consists of portal frames which are spaced evenly along the L2 direction. The frames are to support a slab of thickness (t) that will cover the full area of the hall plan. The dead and live loads applied on the slab are G and Q (kPa), respectively.
Knowledge Booster
Background pattern image
Civil Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Structural Analysis
Civil Engineering
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:Cengage,
Text book image
Structural Analysis (10th Edition)
Civil Engineering
ISBN:9780134610672
Author:Russell C. Hibbeler
Publisher:PEARSON
Text book image
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Text book image
Fundamentals of Structural Analysis
Civil Engineering
ISBN:9780073398006
Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:McGraw-Hill Education
Text book image
Sustainable Energy
Civil Engineering
ISBN:9781337551663
Author:DUNLAP, Richard A.
Publisher:Cengage,
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning