MindTap Engineering for Garber/Hoel's Traffic and Highway Engineering, 5th Edition, [Instant Access], 1 term (6 months)
5th Edition
ISBN: 9781305581159
Author: Nicholas J. Garber; Lester A. Hoel
Publisher: Cengage Learning US
expand_more
expand_more
format_list_bulleted
Question
Chapter 2, Problem 9P
To determine
The factors affecting the long-term viability of fuel taxes as a stable source of revenue to fund highway system improvements.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Incorrect
Question 3
Which is not a sources for Highway Funds?
Gasoline Tax
* Adopt A Highway Program
Tolls
Traffic Fines
General Income Tax
License and Registration Fees
Subject: Transportation engineering
A highway department is considering three alternative routes between two locations. The rate of interest is 8%.
Chapter 2 Solutions
MindTap Engineering for Garber/Hoel's Traffic and Highway Engineering, 5th Edition, [Instant Access], 1 term (6 months)
Knowledge Booster
Similar questions
- There are many benefits related to our highway system, but there are also many costs or detrimental effects that have come into focus in recent years. List four major detrimental effects that are directly related to the construction and use of your highway transportation system.arrow_forwardDiscuss the advantages of involving the private sectors in the provision and maintenance of the road infrastructure, such as toll expressway from the perspective of the government, private companies, and road users.arrow_forwardThe demand and supply function for a bridge are the following where C is cost in cents and V is volume in veh / h . Demand V = 1500 - 10C Supply or cost function: C = 120 + 0.5V (a) What is the equilibrium volume of traffic and the associated cost? (b) 20 cents of toll is added to the cost function, what will be the new cost function and the equilibrium volume?arrow_forward
- Hi. Please kindly answer this. Thank you.arrow_forwardAppreciate the role of user charges in funding transportation initiativesarrow_forwardThe Department of Traffic is considering three improvement plans for a heavily traveled road within the city. The road improvement is expected to achieve three goals: improve travel speeds, increase safety, and reduce operating expenses for motorists. The annual dollar value of savings compared with existing conditions for each criterion and additional construction and maintenance costs is shown in Table 1. If the economic life of the road is considered to be 53 years and the discount rate is 4%, which alternative should be selected? Evaluate the two proposals based on economic evaluation criteria using the Net Present Worth (NPW) and benefit-cost ratio (BCR) methods for economic analysis.arrow_forward
- An existing toll road has an average traffic volume around 6,000 vehicles per day. A project is proposed to widen the toll road to increase the road capacity. It is projected that the traffic volume would increase to 10,000 vehicles if the toll rate is reduced from $5 to $4 per vehicle. Assume that the toll rate is the only factor affecting the traffic volume on the toll road. a) Determine the impact of the toll change on consumer surplus. b) Calculate the point elasticity of demand for the toll road. c) Calculate the arc elasticity of demand for the toll road.arrow_forwardExplain how agency benefits of a transportation project is estimated? Use a toll highway project to outline your proposed method.arrow_forwardA secondary road in a developing country, 30 miles long, is to be improved by surface treating the gravel surface without any change in length. The cost of the improvement is estimated at $150,000 per mile. A present annual transport cost for all traffic on the existing road (vehicle operating cost, maintenance cost, etc.) is estimated at $205,000 per mile. After improvement, this is expected to reduce to $170,000 per mile per annum. Reconstruction takes place in two years with equal expenditures in each year. Assume that in the second year of construction, transport cost on the improved road is equivalent to present costs in half the length and new transport cost on the other half. Would you undertake the project? (The minimum attractive rate of return (MARR) is 8.5% and the project life is 20 years after reconstruction.) Resealing would be required 10 years after reconstruction at a cost of $55,000 per mile. Use the net present worth methodarrow_forward
- Which mode of transportation has received the greatest level of government promo- tional support? Defend your answer.arrow_forwardThere is much discussion on the local, state, and federal levels about the need to repair and improve the Interstate Highway System. Provide a rationale for this need.arrow_forwardAverage demand on a rural roadway ranges from zero to 600 veh/day when the cost per trip goes from $1.75 to zero. (a) Calculate the net user benefits per year (in dollars) if the cost decreases from $1.50 to $0.75/trip (assume a linear demand function). $ 29 x Your response is within 10% of the correct value. This may be due to roundoff error, or you could have a mistake in your calculation. Carry out all intermediate results roundoff error. (b) Compare the value calculated in (a) with the benefits as calculated in typical highway studies. (Enter the benefits in dollars as calculated in typical highway studies.) $ 88000 x Your response is within 10% of the correct value. This may be due to roundoff error, or you could have a mistake in your calculation. Carry out all intermediate results E roundoff error.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage LearningFundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,