Question
Chapter 2, Problem 3P
a.
To determine
The number of cows would it take to fuel 1,000,000 miles of annual driving by a fleet of cars. Also the annual cost.
b.
To determine
To compare with part.a answer wth gasoline fuled car with average of 30miles per gallon and cost of $4 per gallon.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Many times, the selling price of a product, p, is related to the demand, D, according to the relationship p=a-bD. However, a company has found that the price of their product can be related to demand ( in units per year) according to the following equation: p= $88.5 – (0.5)D0.5 . In addition, there is a fixed cost of $20,000 per year and the variable cost to manufacture the product is $20 per unit. a. What level of demand maximizes total revenue and the maximum revenue? b. What level of demand maximizes total profit for this product and the maximum profit?
A construction crew (that is currently unemployed and receiving $10/hr. in benefits) to fix a road. The cement is purchased from a rip-off monopolist that charges $10/bag more than anyone else. The Follow-up maintenance will be done after 1 year, using a different crew that we will assume is not unemployed. We will also assume the interest rate is 7%. The cost estimate provided by the contractor’s accountant is given in the table below:
ITEM
Quantity
Wage
Price
Total
Labor
1,000 hours
$20/hour
$20,000
Cement
500
$50
$25,000
Follow up maint.
500
$20/hr
$10,000
Project Total
$55,000
The opportunity cost of the project is
Group of answer choices
$55,000
$41,000
$39,000
$33,000
Estimate the cost of a 0.75 million gallon per day (MGD) induced-draft packed tower for air-stripping trihalomethanes from drinking water if the cost for a 2-MGD tower is $153,200. The exponent in the cost capacity equation is 0.58.
Chapter 2 Solutions
Engineering Economy (17th Edition)
Ch. 2 - An experimental composite engine block for an...Ch. 2 - Given below is a numbered list of cost terms. For...Ch. 2 - Prob. 3PCh. 2 - Prob. 4PCh. 2 - Prob. 5PCh. 2 - Prob. 6PCh. 2 - Prob. 7PCh. 2 - Prob. 8PCh. 2 - Prob. 9PCh. 2 - Prob. 10P
Ch. 2 - Prob. 11PCh. 2 - Prob. 12PCh. 2 - Prob. 13PCh. 2 - Prob. 14PCh. 2 - Prob. 15PCh. 2 - Prob. 16PCh. 2 - Prob. 17PCh. 2 - Prob. 18PCh. 2 - Prob. 19PCh. 2 - Prob. 20PCh. 2 - Prob. 21PCh. 2 - Prob. 22PCh. 2 - Prob. 23PCh. 2 - Prob. 24PCh. 2 - Prob. 25PCh. 2 - Prob. 26PCh. 2 - Suppose you are going on a long trip to your...Ch. 2 - Prob. 28PCh. 2 - Prob. 29PCh. 2 - A company uses a variable speed honing machine to...Ch. 2 - Prob. 31PCh. 2 - An automobile dealership offers to fill the four...Ch. 2 - Prob. 33PCh. 2 - Prob. 34PCh. 2 - Prob. 35PCh. 2 - Prob. 36PCh. 2 - Prob. 37PCh. 2 - Prob. 38PCh. 2 - Prob. 39PCh. 2 - Prob. 40PCh. 2 - Prob. 41PCh. 2 - Prob. 42PCh. 2 - Prob. 43PCh. 2 - Prob. 44PCh. 2 - A hot water leak in one of the faucets of your...Ch. 2 - Prob. 46PCh. 2 - Prob. 47PCh. 2 - Prob. 48SECh. 2 - Prob. 49SECh. 2 - Prob. 50CSCh. 2 - Prob. 51CSCh. 2 - What is the optimal number of units that should be...Ch. 2 - Prob. 53FECh. 2 - Prob. 54FECh. 2 - Prob. 55FECh. 2 - Prob. 56FECh. 2 - Prob. 57FECh. 2 - Prob. 58FE
Knowledge Booster
Similar questions
- Estimate the cost of a 0.75 million gallon per day (MGD) induced-draft packed tower for air-stripping trihalomethanes from drinking water if the cost for a 2.9- MGD tower is $153,200. The exponent in the cost- capacity equation is 0.47. The cost of a 0.75 million gallon per day induced-draft packed tower is $arrow_forwardTTV Corporation's managers estimate that a 50% increase in price would cause an 80% reduction in the quantity of product sold. Total fixed costs for the product are $5,000 and total variable costs are $4,000, based on production of 400 units. The following values may be useful: In (0.2) In (0.5) = -0.693 In (0.8) = -0.223 In (1.5) = 0.405 In (4,000) = 8.294 In (5,000) = 8.517 = -1.609 %3D TTV's profit maximizing price is: $2.44 O $3.37 $7.57 $13.36arrow_forwardIf the cost of an 8000-operation-per-second assembly line robot is $80,000 and the cost for one with twice the capacity is $120,000, the value of the exponent in the cost-capacity equation is closest to:a. 0.51b. 0.58c. 0.62d. 0.69arrow_forward
- Determine the minimum-cost trade-off between the MTBF and the MTTR for a system requiring 0.98 availability. The MTTR must be between 10 and 28 hr, and the MTBF must be at least 1200 hr. Consider the cost functions as: a. C(x) = 0.0002x2 ; C(y) = 12500/y b. C(x) = 2x; C(y) = 2000-y 2.arrow_forwardFive years ago, when the relevant cost index was 135, a nuclear centrifuge cost $32,000. The centrifuge had a capacity of separating 1250 gallons of ionized solution per hour. Today, it is desired to build a centrifuge with capacity of 3500 gallons per hour, but the cost index now is 270. Assuming a power-sizing exponent to reflect economies of scale, x, of 0.72, use the power-sizing model to determine the approximate cost (expressed in today’s dollars) of the new reactor.arrow_forwardAn engineering firm recently conducted a study to determine its benefit and cost structure (total cost). The results of the study are as follows: The total benefit from producing q units is TB(q): 15,000q-15q2 so that its marginal benefit is %3D MB(q): = 15,000-30q and the total cost of producing q units is TC (q) = 687,500 + 10q2 so that its marginal cost is MC (q) = 20q 1. Find the level of output q' that yields the maximum profit. 2. Find the maximum profit Tt" achieved by the firm at the output level q".arrow_forward
- The IT department allocates indirect costs to user departments on the basis of CPU time at the rate of $2000 per second. For the first quarter, the two heaviest use departments logged 900 and 1300 seconds, respectively. If the IT indirect budget for the year is $19.56 million, the percentage of this year’s allocation consumed by these departments is closest to: (a) 22.5% (b) 32% (c) 55% (d) 67%arrow_forwardThe cost for construction of a desulfurization system for flue gas from boilers at a 600 MW power plant was estimated to be $250 million. If a similar system for a smaller plant had a cost of $55 million and the exponent in the cost-capacity equation is 0.67, what is the size of the smaller plant that served as the basis for the cost projection?arrow_forwardThe total design and construction cost for a sand filter machine to handle a flow rate of 0.7 million gallons per day (MGD) was $1.9 million in 2010. Estimate the cost today for a flow rate of 2.4 MGD. The cost index in 2010 of 161 has been updated to 285 for this year. Component/System/Plant Size Range Exponent Activated sludge plant Aerobic digester Clarifier Centrifuge Sand filter Heat exchanger Cyclone separator 1 to 100 MGD 0.2 to 40 MGD 0.1 to 100 MGD 40 to 60 in 0.84 0.14 0.98 0.71 0.14 500 to 3000 ft? 20 to 8000 ft/min 0.55 0.64arrow_forward
- The cost of a 68 m2 falling-film evaporator was 1.65 times the cost of the 30 m2 unit. What exponent value in the cost-capacity equation yielded this result?arrow_forwardThe cost for implementing a manufacturing process that has a capacity of 6000 units per day was $550,000. If the cost for a plant with a capacity of 100,000 units per day was $3 million, what is the value of the exponent in the cost-capacity equation?arrow_forwardProblem 4:1 Engineers at Waterworks Ltd. have designed a pipeline that provides a throughput of 100,000 gallons of water per 24-hour period that is to supply residents in a small town. By increasing the diameter of the pipeline by 1 inch, the throughput of water would increase by 5,000 gallons per day. Alternatively, throughput could be increased by 7,000 gallons per day using the original pipe diameter with pumps that had 100 more horsepower. Estimate the marginal rate of technical substinition between pump horsepower and pipe diameter. b. Assuming the cost of additional pamp size is 57 per horsepower and the cost of larger diameter pipe is $250,000 per inch, does the original design exhibe the property required for optimal input combinations? Why or why not?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Managerial Economics: A Problem Solving ApproachEconomicsISBN:9781337106665Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike ShorPublisher:Cengage LearningManagerial Economics: Applications, Strategies an...EconomicsISBN:9781305506381Author:James R. McGuigan, R. Charles Moyer, Frederick H.deB. HarrisPublisher:Cengage Learning
Managerial Economics: A Problem Solving Approach
Economics
ISBN:9781337106665
Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:Cengage Learning
Managerial Economics: Applications, Strategies an...
Economics
ISBN:9781305506381
Author:James R. McGuigan, R. Charles Moyer, Frederick H.deB. Harris
Publisher:Cengage Learning