EBK OPERATIONS MANAGEMENT
EBK OPERATIONS MANAGEMENT
13th Edition
ISBN: 8220103675987
Author: Stevenson
Publisher: YUZU
bartleby

Concept explainers

Question
Book Icon
Chapter 19, Problem 2P

a)

Summary Introduction

To solve: The linear programming problem and answer the questions.

Introduction:

Linear programming:

Linear programming is a mathematical modelling method where a linear function is maximized or minimized taking into consideration the various constraints present in the problem. It is useful in making quantitative decisions in business planning.

a)

Expert Solution
Check Mark

Explanation of Solution

Given information:

Minimize Z=1.80S+2.20TSubject to:5S+8T200gr(Potassium)15S+6T240gr(Carbohydrate)4S+12T180gr(Protein)T10gr(T)S,T0(Nonnegativity)

Calculation of coordinates for each constraint and objective function:

Constraint 1:

5S+8T200gr(Potassium)

Substituting S=0 to find T,

5(0)+8T=2008T=200T=2008T=25

Substituting T=0 to find S,

5S+8(0)=2005S=200S=2005S=40

Constraint 2:

15S+6T240gr(Carbohydrate)

Substituting S=0 to find T,

15(0)+6T=2406T=240T=2406T=40

Substituting T=0 to find S,

15S+6(0)=24015S=240S=24015S=16

Constraint 3:

4S+12T180gr(Protein)

Substituting S=0 to find T,

4(0)+12T=18012T=180T=18012T=15

Substituting T=0 to find S,

4S+12(0)=1804S=180S=1804S=45

Constraint 4:

T10gr(T)

Therefore T=10.

Objective function:

The problem is solved with iso-cost line method.

Let 1.80S+2.20T=99

Substituting S=0 to find T,

1.80(0)+2.20T=992.20T=99T=992.20T=45

Substituting T=0 to find S,

1.80S+2.20(0)=991.80S=99S=991.80S=55

Graph:

EBK OPERATIONS MANAGEMENT, Chapter 19, Problem 2P , additional homework tip  1

(1) Optimal value of the decision variables and Z:

The coordinates for the cost line is (45, 55). The cost line is moved towards the origin. The lowest at which the cost line intersects in the feasible region will be the optimum solution. The following equation are solved as simultaneous equation to find optimum solution.

5S+8T=200 (1)

15S+6T=240 (2)

Solving (1) and (2) we get,

S=8,T=20

The values are substituted in the objective function to find the objective function value.

Minimize Z=1.80(8)+2.20(20)=14.40+44=58.40

Optimal solution:

S=8T=20Z=58.4

(2)

None of the constraints are having slack. All ≤ constraints are binding.

(3)

Protein and T constraint have surplus.

Protein:

4(8)+12(20)180gr32+240180272180

The surplus is 92 (272 – 180).

T:

T102010

The surplus is 10 (20– 10).

(4)

The protein constraint is redundant because, it does not intersect at any point in the feasible region.

b)

Summary Introduction

To solve: The linear programming problem and answer the questions.

Introduction:

Linear programming:

Linear programming is a mathematical modelling method where a linear function is maximized or minimized taking into consideration the various constraints present in the problem. It is useful in making quantitative decisions in business planning.

b)

Expert Solution
Check Mark

Explanation of Solution

Given information:

Minimize Z=2x1+3x2Subject to:4x1+2x220(D)2x1+6x218(E)x1+2x212(F)x1,x20(Nonnegativity)

Calculation of coordinates for each constraint and objective function:

Constraint 1:

4x1+2x220(D)

Substituting x1=0 to find x2,

4(0)+2x2=202x2=20x2=202x2=10

Substituting x2=0 to find x1,

4x1+2(0)=204x1=20x1=204x1=5

Constraint 2:

2x1+6x218(E)

Substituting x1=0 to find x2,

2(0)+6x2=186x2=18x2=186x2=3

Substituting x2=0 to find x1,

2x1+6(0)=182x1=18x1=182x1=9

Constraint 3:

x1+2x212(F)

Substituting x1=0 to find x2,

(0)+2x2=122x2=12x2=122x2=6

Substituting x2=0 to find x1,

x1+2(0)=12x1=12x1=121x1=12

Objective function:

The problem is solved with iso-cost line method.

Let 2x1+3x2=24

Substituting x1=0 to find x2,

2(0)+3x2=243x2=24x2=243x2=8

Substituting x2=0 to find x1,

2x1+3(0)=242x1=24x1=242x1=12

Graph:

EBK OPERATIONS MANAGEMENT, Chapter 19, Problem 2P , additional homework tip  2

(1) Optimal value of the decision variables and Z:

The coordinates for the cost line is (12, 8). The cost line is moved towards the origin. The lowest at which the cost line intersects in the feasible region will be the optimum solution. The following equation are solved as simultaneous equation to find optimum solution.

4x1+2x2=20 (1)

2x1+6x2=18 (2)

Solving (1) and (2) we get,

x1=4.2,x2=1.6

The values are substituted in the objective function to find the objective function value.

Minimize Z=2(4.2)+3(1.6)=8.4+4.8=13.2

Optimal solution:

x1=4.2x2=1.6Z=13.2

(2)

Constraint F is having slack as shown below.

(4.2)+2(1.6)124.2+3.2127.412

The slack is 4.6 (12 – 7.4).

(3)

There are no surplus. D and E constraints with ≥ are binding.

(4)

There are no redundant constraints

Want to see more full solutions like this?

Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
Describe a simple sales information system for an online store, including its products, branches, and its appraisal, so that it captures the attention of an average person without a university degree or a particular career, and develop a report about it.
Note: A waiting line model solver computer package is needed to answer these questions. The Kolkmeyer Manufacturing Company uses a group of six identical machines, each of which operates an average of 23 hours between breakdowns. With randomly occurring breakdowns, the Poisson probability distribution is used to describe the machine breakdown arrival process. One person from the maintenance department provides the single-server repair service for the six machines. Management is now considering adding two machines to its manufacturing operation. This addition will bring the number of machines to eight. The president of Kolkmeyer asked for a study of the need to add a second employee to the repair operation. The service rate for each individual assigned to the repair operation is 0.40 machines per hour. (a) Compute the operating characteristics if the company retains the single-employee repair operation. (Round your answers to four decimal places. Report time in hours.) La = L = Wa W = h…
Burger Dome sells hamburgers, cheeseburgers, french fries, soft drinks, and milk shakes, as well as a limited number of specialty items and dessert selections. Although Burger Dome would like to serve each customer immediately, at times more customers arrive than can be handled by the Burger Dome food service staff. Thus, customers wait in line to place and receive their orders. Burger Dome analyzed data on customer arrivals and concluded that the arrival rate is 40 customers per hour. Burger Dome also studied the order-filling process and found that a single employee can process an average of 56 customer orders per hour. Burger Dome is concerned that the methods currently used to serve customers are resulting in excessive waiting times and a possible loss of sales. Management wants to conduct a waiting line study to help determine the best approach to reduce waiting times and improve service. Suppose Burger Dome establishes two servers but arranges the restaurant layout so that an…
Knowledge Booster
Background pattern image
Operations Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,