EBK OPERATIONS MANAGEMENT
EBK OPERATIONS MANAGEMENT
13th Edition
ISBN: 8220103675987
Author: Stevenson
Publisher: YUZU
bartleby

Concept explainers

Question
Book Icon
Chapter 19, Problem 1P

a)

Summary Introduction

To solve: The linear programming problem and answer the given questions.

Introduction:

Linear programming:

Linear programming is a mathematical modelling method where a linear function is maximized or minimized taking into consideration the various constraints present in the problem. It is useful in making quantitative decisions in business planning.

a)

Expert Solution
Check Mark

Explanation of Solution

Given information:

Maximize Z=4x1+3x2Subject to:6x1+4x248lb(Material)4x1+8x280hr(Labor)x1,x20(Nonnegativity)

Calculation of coordinates for each constraint and objective function:

Constraint 1:

6x1+4x248lb(Material)

Substituting x1=0 to find x2,

6(0)+4x2=484x2=48x2=484x2=12

Substituting x2=0 to find x1,

6x1+4(0)=486x1=48x1=486x1=8

Constraint 2:

4x1+8x280hr(Labor)

Substituting x1=0 to find x2,

4(0)+8x2=808x2=80x2=808x2=10

Substituting x2=0 to find x1,

4x1+8(0)=804x1=80x1=804x1=20

Objective function:

The problem is solved with iso-profit line method.

Let 4x1+3x2=24

Substituting x1=0 to find x2,

4(0)+3x2=243x2=24x2=243x2=8

Substituting x2=0 to find x1,

4x1+3(0)=244x1=24x1=244x1=6

Graph:

EBK OPERATIONS MANAGEMENT, Chapter 19, Problem 1P , additional homework tip  1

(1) Optimal value of the decision variables and Z:

The coordinates for the profit line is (6, 8). The profit line is moved away from the origin. The highest point at which the profit line intersects in the feasible region will be the optimum solution. The following equation are solved as simultaneous equation to find optimum solution.

6x1+4x2=48 (1)

4x1+8x2=80 (2)

Solving (1)and (2)we get,

x1=2,x2=9

The values are substituted in the objective function to find the objective function value.

Maximize Z=4(2)+3(9)=8+27=35

Optimal solution:

x1=2x2=9Z=35

(2)

None of the constraints are having slack. Both the ≤ constraints are binding.

(3)

There are no ≥ constraints. Hence, none of the constraints have surplus.

(4)

There are no redundant constraints.

b)

Summary Introduction

To solve: The linear programming problem and answer the questions.

Introduction:

Linear programming:

Linear programming is a mathematical modelling method where a linear function is maximized or minimized taking into consideration the various constraints present in the problem. It is useful in making quantitative decisions in business planning.

b)

Expert Solution
Check Mark

Explanation of Solution

Given information:

Maximize Z=2x1+10x2Subject to:10x1+4x240wk(Durability)x1+6x224psi(Strength)x1+2x214hr(Time)x1,x20(Nonnegativity)

Calculation of coordinates for each constraint and objective function:

Constraint 1:

10x1+4x240wk(Durability)

Substituting x1=0 to find x2,

10(0)+4x2=404x2=40x2=404x2=10

Substituting x2=0 to find x1,

10x1+4(0)=4010x1=40x1=4010x1=4

Constraint 2:

x1+6x224psi(Strength)

Substituting x1=0 to find x2,

(0)+6x2=246x2=24x2=246x2=4

Substituting x2=0 to find x1,

x1+6(0)=24x1=24x1=241x1=24

Constraint 3:

x1+2x214hr(Time)

Substituting x1=0 to find x2,

(0)+2x2=142x2=14x2=142x2=7

Substituting x2=0 to find x1,

x1+2(0)=14x1=14x1=141x1=14

Objective function:

The problem is solved with iso-profit line method.

Let 2x1+10x2=20

Substituting x1=0 to find x2,

2(0)+10x2=2010x2=20x2=2010x2=2

Substituting x2=0 to find x1,

2x1+10(0)=202x1=20x1=202x1=10

Graph:

EBK OPERATIONS MANAGEMENT, Chapter 19, Problem 1P , additional homework tip  2

(1) Optimal value of the decision variables and Z:

The coordinates for the profit line is (10, 2). The profit line is moved away from the origin. The highest point at which the profit line intersects in the feasible region will be the optimum solution. The following equations are solved as simultaneous equation to find optimum solution.

10x1+4x2=40 (1)

x1+2x2=14 (2)

Solving (1)and (2)we get,

x1=1.5,x2=6.25

The values are substituted in the objective function to find the objective function value.

Maximize Z=2(1.5)+10(6.25)=3+62.5=65.5

Optimal solution:

x1=1.5x2=6.25Z=65.5

(2)

None of the constraints are having slack. The time constraint has ≤ and it is binding.

(3)

Durability and strength constraints have ≥ in them. The durability constraint is binding and has no surplus. The strength constraint has surplus as shown below:

(1.5)+6(6.25)241.5+37.5243924

The surplus is 15 (39 -24).

(4)

There are no redundant constraints.

c)

Summary Introduction

To solve: The linear programming problem and answer the questions.

Introduction:

Linear programming:

Linear programming is a mathematical modelling method where a linear function is maximized or minimized taking into consideration the various constraints present in the problem. It is useful in making quantitative decisions in business planning.

c)

Expert Solution
Check Mark

Explanation of Solution

Given information:

Maximize Z=6A+3BSubject to:20A+6B600lb(Material)25A+20B1,000hr(Machinery)20A+30B1,200(Labor)A,B0(Nonnegativity)

Calculation of coordinates for each constraint and objective function:

Constraint 1:

20A+6B600lb(Material)

Substituting A=0 to find B,

20(0)+6B=6006B=600B=6006B=100

Substituting B=0 to find A,

20A+6(0)=60020A=600A=60020A=30

Constraint 2:

25A+20B1,000hr(Machinery)

Substituting A=0 to find B,

25(0)+20B=1,00020B=1,000B=1,00020B=50

Substituting B=0 to find A,

25A+20(0)=1,00025A=1,000A=1,00025A=40

Constraint 3:

20A+30B1,200

Substituting A=0 to find B,

20(0)+30B=1,20030B=1,200B=1,20030B=40

Substituting B=0 to find A,

20A+30(0)=1,20020A=1,200A=1,20020A=60

Objective function:

The problem is solved with iso-profit line method.

Let6A+3B=120

Substituting A=0 to find B,

6(0)+3B=1203B=120B=1203B=40

Substituting B=0 to find A,

6A+3(0)=1206A=120A=1206A=20

Graph:

EBK OPERATIONS MANAGEMENT, Chapter 19, Problem 1P , additional homework tip  3

(1) Optimal value of the decision variables and Z:

The coordinates for the profit line is (20, 40). The profit line is moved away from the origin. The highest point at which the profit line intersects in the feasible region will be the optimum solution. The following equation are solved as simultaneous equation to find optimum solution.

20A+6B=600 (1)

25A+20B=1,000 (2)

Solving (1) and (2) we get,

A=24,B=20

The values are substituted in the objective function to find the objective function value.

Maximize Z=6(24)+3(20)=144+60=204

Optimal solution:

A=24B=20Z=204

(2)

The material and machinery constraint has ≤ and it is binding and has zero slack. The labor constraint has slack as shown below:

20(24)+30(20)1,200480+6001,2001,0801,200

The slack is 120 (1,200 – 1,080).

(3)

There are no constraints with ≥. Hence, no constraints have surplus.

(4)

There are no redundant constraints

Want to see more full solutions like this?

Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
It is January 1 of year 0, and Merck is trying to determine whether to continue development of a newdrug. The following information is relevant. You can assume that all cash flows occur at the ends of therespective years.■ Clinical trials (the trials where the drug is tested on humans) are equally likely to be completed in year1 or 2.■ There is an 80% chance that clinical trials will succeed. If these trials fail, the FDA will not allow thedrug to be marketed.■ The cost of clinical trials is assumed to follow a triangular distribution with best case $100 million,most likely case $150 million, and worst case $250 million. Clinical trial costs are incurred at the end ofthe year clinical trials are completed.■ If clinical trials succeed, the drug will be sold for five years, earning a profit of $6 per unit sold.■ If clinical trials succeed, a plant will be built during the same year trials are completed. The cost of theplant is assumed to follow a triangular distribution with best case $1…
1) Under “Costs of Quality”, costs associated with quality can be classified into four categories: appraisal, prevention, internal failures, and external failures. The costs of quality for Corley Motors Logistics is given in the table.   Cost Elements Amount Checking outbound boxes for errors $31,000 Quality planning    $10,625 Downtime due to conveyor/computer problems $342,125 Incoming product inspection $21,000 Customer complaint rework $33,000  Correcting erroneous orders before shipping $36,550 Quality training of associates $25,925 Correction of typographical errors--pick tickets $11,475   a) Classify the quality cost elements given in the table into the different quality cost categories (prevention, appraisal, internal failure, external failure). b) Total the quality costs in each of the different quality cost categories (prevention, appraisal, internal failure, external failure). c) Using a) and b), suggest which areas…
Note: In chapter 9, section 9.4 of the Stevenson text, the costs of quality are covered; chapter 9 Stevenson lecture power point slide 7 touches upon this topic; see lecture video, 3.55 mins to 4.54 mins.   2) The production process at Hansa Ceylon Coffee fills boxes with dark arabica coffee. The data for the fill weight (in ounces) of eight samples are presented below. A sample size of six was used. The firm’s operations analyst wants to construct X-bar and R-charts to monitor the filling process.   Sample Sample Mean Sample Range 1 15.80 0.42 2 16.10 0.38 3 16.02 0.08 4 15.95 0.15 5 16.12 0.42 6 16.18 0.23 7 15.87 0.36 8 16.20 0.40   a) Calculate the upper and lower control limits for the X-bar chart. b) Calculate the upper and lower control limits for the R chart. c) Is the process under control? Why or why not?   Note: In chapter 10, section 10.3 of the Stevenson text, control charts for variables are…
Knowledge Booster
Background pattern image
Operations Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,