Operations Management (McGraw-Hill Series in Operations and Decision Sciences)
Operations Management (McGraw-Hill Series in Operations and Decision Sciences)
12th Edition
ISBN: 9780078024108
Author: William J Stevenson
Publisher: McGraw-Hill Education
bartleby

Concept explainers

Question
Book Icon
Chapter 19, Problem 2P

a)

Summary Introduction

To solve: The linear programming problem and answer the questions.

Introduction:

Linear programming:

Linear programming is a mathematical modelling method where a linear function is maximized or minimized taking into consideration the various constraints present in the problem. It is useful in making quantitative decisions in business planning.

a)

Expert Solution
Check Mark

Explanation of Solution

Given information:

Minimize Z=1.80S+2.20TSubject to:5S+8T200gr(Potassium)15S+6T240gr(Carbohydrate)4S+12T180gr(Protein)T10gr(T)S,T0(Nonnegativity)

Calculation of coordinates for each constraint and objective function:

Constraint 1:

5S+8T200gr(Potassium)

Substituting S=0 to find T,

5(0)+8T=2008T=200T=2008T=25

Substituting T=0 to find S,

5S+8(0)=2005S=200S=2005S=40

Constraint 2:

15S+6T240gr(Carbohydrate)

Substituting S=0 to find T,

15(0)+6T=2406T=240T=2406T=40

Substituting T=0 to find S,

15S+6(0)=24015S=240S=24015S=16

Constraint 3:

4S+12T180gr(Protein)

Substituting S=0 to find T,

4(0)+12T=18012T=180T=18012T=15

Substituting T=0 to find S,

4S+12(0)=1804S=180S=1804S=45

Constraint 4:

T10gr(T)

Therefore T=10.

Objective function:

The problem is solved with iso-cost line method.

Let 1.80S+2.20T=99

Substituting S=0 to find T,

1.80(0)+2.20T=992.20T=99T=992.20T=45

Substituting T=0 to find S,

1.80S+2.20(0)=991.80S=99S=991.80S=55

Graph:

Operations Management (McGraw-Hill Series in Operations and Decision Sciences), Chapter 19, Problem 2P , additional homework tip  1

(1) Optimal value of the decision variables and Z:

The coordinates for the cost line is (45, 55). The cost line is moved towards the origin. The lowest at which the cost line intersects in the feasible region will be the optimum solution. The following equation are solved as simultaneous equation to find optimum solution.

5S+8T=200 (1)

15S+6T=240 (2)

Solving (1) and (2) we get,

S=8,T=20

The values are substituted in the objective function to find the objective function value.

Minimize Z=1.80(8)+2.20(20)=14.40+44=58.40

Optimal solution:

S=8T=20Z=58.4

(2)

None of the constraints are having slack. All ≤ constraints are binding.

(3)

Protein and T constraint have surplus.

Protein:

4(8)+12(20)180gr32+240180272180

The surplus is 92 (272 – 180).

T:

T102010

The surplus is 10 (20– 10).

(4)

The protein constraint is redundant because, it does not intersect at any point in the feasible region.

b)

Summary Introduction

To solve: The linear programming problem and answer the questions.

Introduction:

Linear programming:

Linear programming is a mathematical modelling method where a linear function is maximized or minimized taking into consideration the various constraints present in the problem. It is useful in making quantitative decisions in business planning.

b)

Expert Solution
Check Mark

Explanation of Solution

Given information:

Minimize Z=2x1+3x2Subject to:4x1+2x220(D)2x1+6x218(E)x1+2x212(F)x1,x20(Nonnegativity)

Calculation of coordinates for each constraint and objective function:

Constraint 1:

4x1+2x220(D)

Substituting x1=0 to find x2,

4(0)+2x2=202x2=20x2=202x2=10

Substituting x2=0 to find x1,

4x1+2(0)=204x1=20x1=204x1=5

Constraint 2:

2x1+6x218(E)

Substituting x1=0 to find x2,

2(0)+6x2=186x2=18x2=186x2=3

Substituting x2=0 to find x1,

2x1+6(0)=182x1=18x1=182x1=9

Constraint 3:

x1+2x212(F)

Substituting x1=0 to find x2,

(0)+2x2=122x2=12x2=122x2=6

Substituting x2=0 to find x1,

x1+2(0)=12x1=12x1=121x1=12

Objective function:

The problem is solved with iso-cost line method.

Let 2x1+3x2=24

Substituting x1=0 to find x2,

2(0)+3x2=243x2=24x2=243x2=8

Substituting x2=0 to find x1,

2x1+3(0)=242x1=24x1=242x1=12

Graph:

Operations Management (McGraw-Hill Series in Operations and Decision Sciences), Chapter 19, Problem 2P , additional homework tip  2

(1) Optimal value of the decision variables and Z:

The coordinates for the cost line is (12, 8). The cost line is moved towards the origin. The lowest at which the cost line intersects in the feasible region will be the optimum solution. The following equation are solved as simultaneous equation to find optimum solution.

4x1+2x2=20 (1)

2x1+6x2=18 (2)

Solving (1) and (2) we get,

x1=4.2,x2=1.6

The values are substituted in the objective function to find the objective function value.

Minimize Z=2(4.2)+3(1.6)=8.4+4.8=13.2

Optimal solution:

x1=4.2x2=1.6Z=13.2

(2)

Constraint F is having slack as shown below.

(4.2)+2(1.6)124.2+3.2127.412

The slack is 4.6 (12 – 7.4).

(3)

There are no surplus. D and E constraints with ≥ are binding.

(4)

There are no redundant constraints

Want to see more full solutions like this?

Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
The S&OP team at Kansas Furniture, led by David Angelow, has received estimates of demand requirements as shown in the table. Assuming one-time stockout costs for lost sales of $125 per unit, inventory carrying costs of $30 per unit per month, and zero beginning and ending inventory, evaluate the following plan on an incremental cost basis: Plan B: Vary the workforce to produce the prior month's demand. Demand was 1,300 units in June. The cost of hiring additional workers is $35 per unit produced. The cost of layoffs is $60 per unit cut back. (Enter all responses as whole numbers.) Note: Both hiring and layoff costs are incurred in the month of the change (i.e., going from production of 1,300 in July to 1300 in August requires a layoff (and related costs) of 0 units in August). Hire Month 1 July Demand 1300 Production (Units) Layoff (Units) Ending Inventory Stockouts (Units) 2 August 1150 3 September 1100 4 October 1600 5 November 1900 6 December 1900
The S&OP team at Kansas Furniture, led by David Angelow, has received estimates of demand requirements as shown in the table. Assuming one-time stockout costs for lost sales of $100 per unit, inventory carrying costs of $20 per unit per month, and zero beginning and ending inventory, evaluate the following plan on an incremental cost basis: Plan A: Produce at a steady rate (equal to minimum requirements) of 1,100 units per month and subcontract additional units at a $65 per unit premium cost. Subcontracting capacity is limited to 800 units per month. (Enter all responses as whole numbers). Ending Month Demand Production Inventory Subcontract (Units) 1 July 1300 1,100 0 2 August 1150 1,100 0 3 September 1100 1,100 0 4 October 1600 1,100 0 5 November 1900 1,100 0 6 December 1200 1,100 0
Please help me expand upon my research even more in detail please. Need help added more to mine from the photos please. Not sure what more I can add.
Knowledge Booster
Background pattern image
Operations Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,