Concept explainers
(a)
Find the net allowable point bearing capacity of the drilled shaft
(a)
Answer to Problem 19.11CTP
The net allowable point bearing capacity of the drilled shaft is
Explanation of Solution
Given information:
The diameter of shaft
The base diameter
The length of the drilled shaft in clay layer 1
The length of the drilled shaft in clay layer 2
The total length of the drilled shaft L is 10.75 m
The unit weight of clay layer 1
The unit weight of clay layer 2
The soil friction angle
The soil friction angle of clay layer 2
The factor of safety FOS is 4.
Calculation:
Find the area of the drilled shat in the clay layer 1
Substitute 1.50 m for
Calculate the value of ratio
Substitute 10.75 m for L and 1.50 m for
Calculate the vertical effective stress
Substitute
Calculate the value of bearing capacity factor
Substitute
Calculate the net load-carrying capacity at the base of the drilled shaft
Get the value of correction factor,
Take the value of correction factor as 0.82.
Substitute
Find the soil-pile friction-angle
Substitute
Calculate the earth pressure coefficient
Substitute
Calculate the perimeter p of the pile using the formula:
Substitute 0.75 m for
Find the critical depth of the drilled shaft
Substitute 0.75 m for
The critical depth of the drilled shaft more than the length of the entire shaft, therefore, the frictional resistance along the pile shaft will increase over the entire length of the shaft.
Consider 0 ft from top of the pile.
Calculate the magnitude of unit frictional resistance,
Substitute 0 m for z.
The frictional resistance (skin friction),
Consider the pile to the depth of 10 m (critical depth of the pile) from the top of pile tip.
Calculate the magnitude of unit frictional resistance,
Substitute 10 m for z, 0.470 for K,
Find the frictional resistance (skin friction),
Substitute 2.36 m for p, 10 m for
Calculate the net allowable point bearing capacity of the drilled shaft using the formula:
Substitute 252.64 kN for
Thus, the net allowable point bearing capacity of the drilled shaft is
(b)
Find the allowable load carrying capacity of the pile
(b)
Answer to Problem 19.11CTP
The allowable load carrying capacity of the pile is
Explanation of Solution
Calculation:
Find the ratio of allowable settlement to the diameter of the base using the relation:
Refer Table (19.6), “Normalized Base loading transfer with settlement for cohesionless soils (based on average curve)” in the text book.
Based on the ratio of allowable settlement to the diameter of the base, take the value of end bearing
Find the allowable load
Substitute 50,096.22 kN for
Find the ratio of allowable settlement to the diameter of the shaft base using the relation:
Refer Table (19.5), “Normalized side load transfer with settlement for cohesionless soils (based on average curve)” in the text book.
Based on the ratio of allowable settlement to the diameter of the shaft base, take the value of
Find the allowable load
Substitute 252.64 kN for
Find the allowable load
Substitute 16,031 kN for
Thus, the allowable load carrying capacity of the pile is
Want to see more full solutions like this?
Chapter 19 Solutions
EBK FUNDAMENTALS OF GEOTECHNICAL ENGINE
- K Course Code CE181303 Course Title Hours per week L-T-P Credit C Fluid Mechanics 3-1-0 MODULE 1: Fluid Properties: Fluid-definition, types; physical properties of fluid-density, specific weight, specific volume, specific gravity, viscosity- Newton's law of viscosity, surface tension, compressibility of fluids, capillarity. MODULE 2: Fluid Statics: Hydrostatic pressure, pressure height relationship, absolute and gauge pressure, measurement of pressure-manometer, pressure on submerged plane and curved surfaces, centre of pressure; buoyancy, equilibrium of floating bodies, metacentre; fluid mass subjected to accelerations. MODULE 3: Fluid Kinematics: Types of motion- steady and unsteady flow, uniform and no uniform flow, laminar and turbulent flow, and path lines, stream tube, stream function compressible and incompressible flow, one, two & three dimensional flow; stream lines, streak lines and velocity potential, flow net and its drawing: free and forced vortex. MODITE Q. A closed…arrow_forwardH.W: For the tank shown in figure below, Find The amount of salt in the tank at any time. Ans: x = 2(100+t) 1500000 (100 + t)² Qin = 3 L/min Cin = 2 N/L V = 100 L Xo=50N Qout = 2 L/min Cout? 33arrow_forward- Find reactions and draw Shear and Bending Moment Diagram. 30 N 15 N/m D B A 2 m 1 m 2 mmarrow_forward
- : A 5ms- long current pulse is desired for two linear lamps connected in series and pumped at a total energy input of (1KJ). Each of lamps has an arc-length of (10cm) and a bore of (1cm). If we assume a peak current of (i, -650A). Design a multiple mesh network including number of LC sections, inductance and capacitance per section and capacitor voltage. Laser designarrow_forwardWhat would be the best way to handle when a contractor misses a concrete pour deadline which causes delays for other contractors?arrow_forwardPlease solve manuallyarrow_forward
- . The free fall distance was 1753 mm. The times for the release and catch recorded on the fall experiments were in millisecond: 222.22 800.00 61.11 641.67 0.00 588.89 11.11 588.89 8.33 588.89 11.11 588.89 5.56 586.11 2.78 583.33 Calculate the time taken for the fall for each experiment. Calculate for each fall the acceleration based on time and distance. Calculate the mean of the accelerations. Give in the answer window the calculated mean of accelerations in m/s2.arrow_forwardneed help. explain plzarrow_forward-Design the traffic signal intersection using all red 2 second, for all phase the truck percent 5% for all movement, and PHF -0.95 Check for capacity only Approach Through volume Right volume Left volume Lane width Number of lane Veh/hr Veh/hr Veh/hr m North 700 100 150 3.0 3 south 600 75 160 3.0 3 East 300 80 50 4.0 R west 400 50 55 4.0 2arrow_forward
- need helparrow_forwardFor the beam show below, draw A.F.D, S.F.D, B.M.D A 2 N M 10 kN.m B 2 M Carrow_forwardB: Find the numerical solution for the 2D equation below and calculate the temperature values for each grid point shown in Fig. 2 (show all steps). (Do only one trail using following initial values and show the final matrix) T₂ 0 T3 0 I need a real solution, not artificial intelligence locarrow_forward
- Principles of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781305081550Author:Braja M. DasPublisher:Cengage LearningPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage LearningFundamentals of Geotechnical Engineering (MindTap...Civil EngineeringISBN:9781305635180Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning