OPERATIONS MANAGEMENT W/ CNCT+
12th Edition
ISBN: 9781259574931
Author: Stevenson
Publisher: MCG CUSTOM
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 19, Problem 11P
a)
Summary Introduction
To determine: The optimal quantities of the decision variable if the goal is to maximize profit.
Introduction:
Linear programming:
Linear programming is a mathematical modeling method where a linear function is maximized or minimized taking into consideration the various constraints present in the problem. It is useful in making quantitative decisions in business planning.
b)
Summary Introduction
To determine: The resources that are completed used and the value of unused resources.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
A process improvement team is working to improve the production output at the Johnson Manufacturing plant’sHeader Cell that manufactures a key component, headers, used in commercial air conditioners. A header is partof the circulatory system of a commercial air conditioner that moves coolant between various components suchas the evaporator coil and the condenser coil. Currently, the header production cell is scheduled separately fromthe main work in the plant. Often, individual headers are not sequenced to match the product they go into on thefinal assembly line in a timely fashion, and so the product can sit in queue waiting for a header
Because of its labor contract, a company must hire enough labor for 100 units ofproduction per week on one shift or 200 units per week on two shifts. It cannot hire,lay off, or assign overtime. During the fourth week, workers will be available fromanother department to work part or all of an extra shift (up to 100 units). There is aplanned shutdown for maintenance in the second week, which will cut production tohalf. Develop a production plan. The opening inventory is 200 units, and the desiredending inventory is 300 units
Part A is processed on a MILLING machine; Part B is processed on a LATHE machine. Two parts (A and B) are then assembled on an ASSEMBLY machine. Standard times, scrap rates, efficiency, and availability of each machine and the assembly are given in the table below. Determine the number of milling (M), the lathe (L) and the assembly (A) machines needed to produce 100 good parts from this production system during and 8-hour (480 minutes) shift. (Note: Round up the number of parts processed on each station and then round up the number of machines needed).
Chapter 19 Solutions
OPERATIONS MANAGEMENT W/ CNCT+
Ch. 19 - For which decision environment is linear...Ch. 19 - What is meant by the term feasible solution space?...Ch. 19 - Explain the term redundant constraint.Ch. 19 - Prob. 4DRQCh. 19 - Prob. 5DRQCh. 19 - Prob. 6DRQCh. 19 - Prob. 1PCh. 19 - Prob. 2PCh. 19 - Prob. 3PCh. 19 - A small candy shop is preparing for the holiday...
Ch. 19 - A retired couple supplement their income by making...Ch. 19 - Solve each of these problems by computer and...Ch. 19 - Prob. 7PCh. 19 - For Problem 6b: a. Find the range of feasibility...Ch. 19 - Prob. 9PCh. 19 - Prob. 10PCh. 19 - Prob. 11PCh. 19 - The manager of the deli section of a grocery...Ch. 19 - Prob. 13PCh. 19 - A chocolate maker has contracted to operate a...Ch. 19 - Prob. 15PCh. 19 - Prob. 16PCh. 19 - Prob. 1.1CQCh. 19 - Prob. 1.2CQCh. 19 - Prob. 1.3CQCh. 19 - Prob. 2.1CQCh. 19 - Prob. 2.2CQCh. 19 - Prob. 2.3CQCh. 19 - Prob. 2.4CQ
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Consider a law firm with 15 lawyers and 3 paralegals. The firm is struggling to keep up with the high demand for its services, particularly during the busy litigation seasons. It has been observed that the lawyers spend a significant amount of their time on administrative tasks that could potentially be handled by paralegals. After a careful study of the work distribution within the firm, it was determined that 35% of the activities carried out by the lawyers are administrative in nature. Given that each lawyer works 50 hours a week, please determine: (a) How many additional paralegals should the firm hire to handle the administrative tasks currently performed by the lawyers? (b) If the lawyers' time spent on administrative tasks is redirected to billable legal work, by what percentage could the firm potentially increase its billable hours?arrow_forwardAbbott Manufacturing produces plastic cases for solar photovoltaic panels and has decided to combine orders from customers to increase work order size, and thereby, make one large production run per model type. Plastic injection molding machines are used to make these parts, and it is time consuming to clean and re-setup the machines between production runs. Each molding machine and operator works one 10-hour shift with a one-hour lunch break and one-half hour for operator breaks. Consolidated Work Orders Model XVT-5 Case Model UYT-3 Case Model KLY-6 Case Work Order Quantity 9,600 panels 7,900 12,000 Setup (Changeover) Time per Work Order (minutes) 98 160 What is the total workload (demand) in hours for this work order mix? Round your answer to one decimal place. The total workload is hours. How many machines will it take to do this work in one, two, or three days? Round your answers up to the nearest whole number. To do this work in 1 day they need machine(s). machine(s). To do this…arrow_forwardAbbott Manufacturing produces plastic cases for solar photovoltaic panels and has decided to combine orders from customers to increase work order size, and thereby, make one large production run per model type. Plastic injection molding machines are used to make these parts, and it is time consuming to clean and re-setup the machines between production runs. Each molding machine and operator works one 10-hour shift with a one- hour lunch break and one-half hour for operator breaks. Consolidated Work Orders Model XVT-5 Case Model UYT-3 Case Model KLY-6 Case Work Order Quantity 8,800 panels 8,700 12,400 Setup (Changeover) Time per Work Order (minutes) 86 63 135 Processing Time per Panel (seconds) 2.50 2.22 4.11 What is the total workload (demand) in hours for this work order mix? Round your answer to one decimal place. The total workload is hours. How many machines will it take to do this work in one, two, or three days? Round your answers up to the nearest whole number. To do this work…arrow_forward
- A Support Labor Staff lifts bricks from 30, 53-ft long trailers in their 8-hr shift using forklifts. The typical 53-ft trailer holds 26 pallets of bricks. The warehouse receives in the first half of the shift and ships in the second half of the shift. The work standard for forklift operations is listed below: Load/unload pallet from trailer 45 sec Move from dock to warehouse or warehouse to dock 120 sec Load/unload pallet from Truck 30 sec Move within warehouse 60 sec Calculate the number of forklifts needed to process all the pallets is most nearly: А. 7 В. 9 С. 10 D. 11arrow_forward4. The Spencer Optics Company produces an inexpensive line of sunglasses. The manufacturing process consists of assembling two plastic lenses (produced by the firm's plastic molding depart- ment) into a finished frame (purchased from an outside supplier). The company is interested in using material requirements planning to schedule its operations and has asked you to prepare an example to illustrate the technique. The firm's sales manager has prepared a 10-week sales forecast for one of the more popular sunglasses (the Classic model) for your example. The forecast is 100 units per week. Spencer has customer orders of 110 units, 80 units, 50 units, and 20 units in weeks 1, 2, 3, and 4, respectively. The sunglasses are assembled in batches of 300 units. Presently, three such batches are sched- uled: one in week 2, one in week 5, and one in week 8. Complete the following time-phased record: Week hand 1 2 3 4 5 6 7 8 9 10 Classic Model On MPS Record Forecast Orders Projected available…arrow_forwardWilliam Beebe owns a small shoe store. He has 10 pairs of shoes that requireresoling and polishing. He has a machine that can resole one pair of shoes at atime, and the time required for the operation varies with the type and condition of theshoe and the type of sole that is used. Shoes are polished on a machine dedi-cated tothis purpose as well, and polishing is always done after resoling. His assistant generally does the polishing while Mr. Beebe does the resoling. The resoling and polishingtimes (in minutes) are Shoes Resoling Time Polishing Time1 14 32 28 13 12 24 6 55 10 106 14 67 4 128 25 89 15 510 10 5In what order should the shoes be repaired in order to minimize the total makespanfor these 10 jobs?arrow_forward
- Galaxy Candy Company manufactures two popular candy bars, the Eclipse bar and the Nova bar. Both candy bars go through a mixing operation where the various ingredients are combined, and the Coating Department where the bars from the Mixing Department are coated with chocolate. The Eclipse bar is coated with both white and dark chocolate to produce a swirled effect. A material shortage of an ingredient in the Nova bar limitsproduction to 300 batches per hour. Production and sales data are presented in the following table. Mixing CoatingAvailable capacity in hours 525 500Use of capacity in hours per batch of product: Eclipse 1.5 2.0 Nova…arrow_forwardEU Company manufactures two different types of life vests (A and B) that are manufactured and assembled on three different workstations (W, X, and Y) using a small-batch process (see Figure 1). Batch setup times are negligible. The flowchart denotes the path each product follows through the manufacturing process, and each product’s price, demand per week, and processing times per unit are indicated as well. Purchased parts and raw materials consumed during production are represented by inverted triangles. EU can make and sell up to the limit of its demand per week; no penalties are incurred for not being able to meet all the demand. Each workstation is staffed by a worker who is dedicated to work on that workstation alone and is paid $6 per hour for an entire week, regardless of how much the worker is used. Total labor costs per week are fixed. Variable overhead costs are $1,500/week. The plant operates one 8-hour shift per day, or 40 hours/week. Which of the three workstations, W,…arrow_forwardDon't used Chat gptarrow_forward
- Laredo Leather Company manufactures high-quality leather goods. The company's profits have declined during the past nine months. In an attempt to isolate the causes of poor profit performance, management is investigating the manufacturing operations of each of its products. One of the company's main products is leather belts. The belts are produced in a single, continuous process in the Dallas plant. During the process, leather strips are sewn, punched, and dyed. The belts then enter a final finishing stage to conclude the process. Labor and overhead are applied continuously during the manufacturing process. All materials, leather strips, and buckles are introduced at the beginning of the process. The firm uses the weighted-average method to calculate its unit costs. The leather belts produced at the Dallas plant are sold wholesale for $9.95 each. Management wants to compare the current manufacturing costs per unit with market prices for leather belts. The top management has…arrow_forwardTuff-Rider, Inc., manufactures touring bikes and mountain bikes in a variety of frame sizes, colors, and component combinations. Identical bicycles are produced in lots of 110. The projected demand, lot size, and time standards are shown in the following table: Item Touring Mountain Demand forecast 4,000 units/year 12,000 units/year Lot size 100 units 110 units Standard processing time 0.25 hour/unit 0.50 hour/unit Standard setup time 2 hours/lot 3 hours/lot The shop currently works 8 hours a day, 5 days a week, 52 weeks a year. It operates five workstations, each producing one bicycle in the time shown in the table. The shop maintains a 15 percent capacity cushion. How many workstations will be required next year to meet expected demand without using overtime and without decreasing the firm's current capacity cushion? The number of workstations required next year is ?(Enter your response rounded up to the next whole number.)arrow_forwardSpartan Castings must implement a manufacturing process that reduces the amount of particulates emitted into the atmosphere. Two processes have been identified that provide the same level of particulate reduction. The first process is expected to incur $350,000 of fixed cost and add $50 of variable cost to each casting Spartan produces. The second process has fixed costs of $150,000 and adds $90 of variable cost per casting.a. What is the break-even quantity beyond which the first process is more attractive?b. What is the difference in total cost if the quantity produced is 10,000?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,