OPERATIONS MANAGEMENT CNCT W/EBK
OPERATIONS MANAGEMENT CNCT W/EBK
14th Edition
ISBN: 9781264344017
Author: Stevenson
Publisher: MCG
bartleby

Concept explainers

Question
Book Icon
Chapter 19, Problem 11P

a)

Summary Introduction

To determine: The optimal quantities of the decision variable if the goal is to maximize profit.

Introduction:

Linear programming:

Linear programming is a mathematical modeling method where a linear function is maximized or minimized taking into consideration the various constraints present in the problem. It is useful in making quantitative decisions in business planning.

b)

Summary Introduction

To determine: The resources that are completed used and the value of unused resources.

Blurred answer
Students have asked these similar questions
A process improvement team is working to improve the production output at the Johnson Manufacturing plant’sHeader Cell that manufactures a key component, headers, used in commercial air conditioners. A header is partof the circulatory system of a commercial air conditioner that moves coolant between various components suchas the evaporator coil and the condenser coil. Currently, the header production cell is scheduled separately fromthe main work in the plant. Often, individual headers are not sequenced to match the product they go into on thefinal assembly line in a timely fashion, and so the product can sit in queue waiting for a header
Because of its labor contract, a company must hire enough labor for 100 units ofproduction per week on one shift or 200 units per week on two shifts. It cannot hire,lay off, or assign overtime. During the fourth week, workers will be available fromanother department to work part or all of an extra shift (up to 100 units). There is aplanned shutdown for maintenance in the second week, which will cut production tohalf. Develop a production plan. The opening inventory is 200 units, and the desiredending inventory is 300 units
Part A is processed on a MILLING machine; Part B is processed on a LATHE machine. Two parts (A and B) are then assembled on an ASSEMBLY machine. Standard times, scrap rates, efficiency, and availability of each machine and the assembly are given in the table below. Determine the number of milling (M), the lathe (L) and the assembly (A) machines needed to produce 100 good parts from this production system during and 8-hour (480 minutes) shift. (Note: Round up the number of parts processed on each station and then round up the number of machines needed).
Knowledge Booster
Background pattern image
Operations Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,