Find the percentage change in total amount of electricity generated in

Answer to Problem 42P
The percentage change in total amount of electricity generated in
Explanation of Solution
Given data:
Refer to common Table for problems 18.36 through 18.42 as “Electricity Generation by fuel, 1980-2030 (billion kilowatt hours)-Data from U.S. Department of energy” in textbook,
The projected value of coal in the year
The projected value of coal in the year
The projected value of coal in the year
The projected value of coal in the year
The projected value of petroleum in the year
The projected value of petroleum in the year
The projected value of petroleum in the year
The projected value of petroleum in the year
The projected value of natural gas in the year
The projected value of natural gas in the year
The projected value of natural gas in the year
The projected value of natural gas in the year
The projected value of nuclear fuel in the year
The projected value of nuclear fuel in the year
The projected value of nuclear fuel in the year
The projected value of nuclear fuel in the year
The projected value of renewable in the year
The projected value of renewable in the year
The projected value of renewable in the year
The projected value of renewable in the year
Formula used:
Formula for the linear interpolation is,
Formula to calculate the total amount of electricity in the year
Formula to calculate the total amount of electricity in the year
Formula to calculate the total amount of electricity in the year
Formula to calculate the total amount of electricity in the year
Formula to calculate the percentage change of coal in
Calculation:
Substitute
Substitute
Substitute
Substitute
To find the projected value total amount of electricity at the year
The diagrammatic representation for the given value is drawn below,
Substitute
Equation (7) can be reduced as follows,
Therefore, the total amount of electricity generated in
To find the projected value total amount of electricity at the year
The diagrammatic representation for the given value is drawn below,
Substitute
Equation (8) can be reduced as follows,
Therefore, the total amount of electricity generated in
Substitute
The percentage change in total amount of electricity generated in
Conclusion:
Thus, the percentage change in total amount of electricity generated in
Want to see more full solutions like this?
Chapter 18 Solutions
EBK ENGINEERING FUNDAMENTALS: AN INTROD
- Results obtained from laboratory tests on a sample of RC-250 asphalt cement are given. Determine whether the properties of this material meet the Asphalt Institute specifications for this type of material; if not, note the differences. (For each specification, enter the minimum acceptab value in the same units as used in the test results.) • Kinematic viscosity at 140°F (60°C) = 230 centistokes • Flash point (Tagliabue open cup) = 89°F • Distillation test where distillate percent by volume of total distillate to 680°F (360ºC) • To 437°F (225°C) = 27% • To 500°F (260°C) = 69% • To 600°F (316°C) = 72% • Residue from distillation to 680°F (360°C) by volume percentage of sample by difference • Tests on Residue from Distillation: • Ductility at 77°F (25°C) = 92 cm • Absolute viscosity at 140°F (60°C) = 620 poises ⚫ Solubility = 90% Property Kinematic Viscosity = 74% Specification Test Results Were Specifications Met? centistokes 230 centistokes ---Select--- ✓ Flash Point °F 89°F…arrow_forwardProblem 2 Two machines produce rivets for a factory job. The number of sub-standard rivets per hour by the two machines are random variables, denoted by X1 and X2. The bivariate PMF of X1 and X2, Px,x,(x1,x2), is given in the table below. X2=0 X2=1 X2=2 X2=3 X₁-0 0.07 0.05 0.02 0.01 X₁ =1 0.05 0.16 0.12 0.02 X₁ =2 0.02 0.12 0.17 0.05 X₁ =3 0.01 0.01 0.05 0.07arrow_forwardPlease provide a handwritten solution to the questionarrow_forward
- AS Q1/ The specific gravity of the soil is 1.41 percentage of water content by weight at field capacity and wilting point are 15% and 7% respectively calculate the equivalent moisture content as equivalent depth for 1.2m root zone : 1. at permanent wilting point 2. at field capacity 3. for ready available waterarrow_forwardQuestion 6 The following figure shows peak-hour volumes for an intersection. Using Webster's method, determine a suitable signal timing for the intersection using the four-phase system shown below. Use an amber interval of 3 seconds and the saturation flow given in the table. O 100 O Phase Lime Group Saturation Flow A e 1615-> 370 3700 B 1615 1615 3700 1615 3700arrow_forwardPHF-0.91 Pedestrian volume is negligible. Question 7 A parking area with 60 bays has an initial count of 35 vehicles. The in-out survey data for 10-minute intervals is as per the table below. Complete the table, calculate the accumulation, occupancy (%), and parking load (veh.hrs) for each interval. Time (min) In Out Accumulation Occupancy Parking load (%) 0 3 10 2 4 20 1 1 30 1 3 40 1 6 50 1 4 60arrow_forward
- Q3/ The following data represent the water depth in the soil of equal areas for specified field. Calculate the uniformity coefficient, efficiency and adequacy of irrigation. Net needed irrigation depth =75 mm (78-04, 79, 88, 85.21, 76,82)arrow_forwardA (A) Q1/ It is required to apply a net depth of 120mm to a total area of 60 ha. The applied discharge is continuously 180 L/s. What must be the time of irrigation? Assume the application efficiency 85%. а Eas 85 0% tarrow_forwardThe following figure is a flexible pavement system with the resilient moduli layer coefficients and drainage coefficients as shown. If the predicted ESAL = 6x106, Reliability, R = 99%, Standard Deviation (So) = 0.45, and APSI = 2.5, select thicknesses D1, D2, and D3 in accordance with the AASHTO Guide for Design of Pavement Structures. E₁ = 400, 000 psi; a₁ = 0.42, Thickness = D₁ E₂=30,000 psi; a₂= 0.14, m₂ = 1.2; Thickness = Dz E=11,000 psi; a=0.08, m3 = 1.2; Thickness = D3 MR= 5,700 psiarrow_forward
- Engineering Fundamentals: An Introduction to Engi...Civil EngineeringISBN:9781305084766Author:Saeed MoaveniPublisher:Cengage Learning