a)
To determine: The NPV of the project ignoring costs of raising funds.
Introduction:
b)
To determine: The NPV of the project after including the issuance cost.
Introduction:
Net Present Value is the difference between the present value of cash outflow and the present value of cash inflow over a specified period of time.
c)
To determine: The NPV of project after including the issuance cost in the following case.
Introduction:
Net Present Value is the difference between the present value of cash outflow and the present value of cash inflow over a specified period of time.