Question
Chapter 16, Problem 28P
To determine
To decide the best proposal out of three proposals based on cost benefit analysis.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
S
Using exactly the same information from Problem No. 1 above, calculate the Annual Worth of Project Y at 8% per year interest rate. You can see the data in picture one, answer the problem in the second picture.
An electric utility company is considering a re-engineering of a major hydroelectric facility. The project would yield
greater capacity and lower cost per kilowatt-hour of power. As a result of the project, the price of power would be
reduced. This is expected to increase the quantity of power demanded. The following data are available
Effect of Reduced Price of Power
0.08
10,000,000
0.07
14,000,000
Current price ($/kWh)
Current consumption (kWh/year)
New price ($/kWh)
Expected consumption (kWh/year)
What is the annual benefit to consumers of power from this project?
The annual benefit is $
Chapter 16 Solutions
ENGR.ECONOMIC ANALYSIS
Ch. 16 - Prob. 1QTCCh. 16 - Prob. 2QTCCh. 16 - Prob. 3QTCCh. 16 - Prob. 4QTCCh. 16 - Prob. 1PCh. 16 - Prob. 2PCh. 16 - Prob. 3PCh. 16 - Prob. 4PCh. 16 - Prob. 5PCh. 16 - Prob. 6P
Ch. 16 - Prob. 7PCh. 16 - Prob. 8PCh. 16 - Prob. 9PCh. 16 - Prob. 10PCh. 16 - Prob. 11PCh. 16 - Prob. 12PCh. 16 - Prob. 13PCh. 16 - Prob. 14PCh. 16 - Prob. 15PCh. 16 - Prob. 16PCh. 16 - Prob. 17PCh. 16 - Prob. 18PCh. 16 - Prob. 19PCh. 16 - Prob. 20PCh. 16 - Prob. 21PCh. 16 - Prob. 23PCh. 16 - Prob. 24PCh. 16 - Prob. 25PCh. 16 - Prob. 26PCh. 16 - Prob. 27PCh. 16 - Prob. 28PCh. 16 - Prob. 29PCh. 16 - Prob. 30PCh. 16 - Prob. 31PCh. 16 - Prob. 32PCh. 16 - Prob. 33PCh. 16 - Prob. 34PCh. 16 - Prob. 35PCh. 16 - Prob. 36PCh. 16 - Prob. 37PCh. 16 - Prob. 38PCh. 16 - Prob. 39PCh. 16 - Prob. 40PCh. 16 - Prob. 41PCh. 16 - Prob. 42PCh. 16 - Prob. 43PCh. 16 - Prob. 44PCh. 16 - Prob. 45PCh. 16 - Prob. 46PCh. 16 - Prob. 47PCh. 16 - Prob. 48PCh. 16 - Prob. 49P
Knowledge Booster
Similar questions
- A new road is being proposed to create a shortcut from a major residential area to an industrial complex 15 miles away. The current drivers with an AADT of 10,000 travel 27 miles each direction on a curvy, hilly road to the industrial park. Many do not go to the shopping center near the industrial park because of the present substandard road. The new alignment would put a new bridge over the river and cross some wetlands to shorten the distance to 16 miles. The AADT is expected to increase to 12,000. The cost of the new highway will be $80 million, including the bridge. Some rehabilitation estimated at $5 million would have to be done by the state transportation agency on the existing road in 10 years if the new road is not built. If the new road is built, the old road will be turned over to the local governments. The maintenance cost will decrease from $300,000 per mile on the old road to $250,000 per mile on the new road. When the costs of gasoline and travel time are included, the…arrow_forwardYou are weighing the economics of installing a triple-glazed energy efficient window system in your building. The following life cycle costs and savings are provided. The study period is 25 years, and the discount rate is 10%. Is this an economically viable approach based on the Savings-to-Investment Ratio (SIR)? Triple- Glazed Energy Efficient Windows: Window Quantity takeoff: 10000 sf Initial Cost: $100/sf Annual Operating Costs: $2.5/sf Annual Energy Saving: $10/sfarrow_forwardAn industrial park is being planned near a river. The river occasionally floods, and as a result theindustrial park planners are trying to decide how large of an embankment to build as protection. Theembankment is expected to last 50 years. The MARR is 12%. If the water rises above theembankment (regardless how much) and flooding occurs, the cost is $300,000. Using the data below,find the expected annual costs in each case and determine which embankment height should beselected.Embankmentheight(meters)Initial Costof EmbankmentProbability of water rising aboveembankment in any given year2.0 $100,000 0.3302.5 $165,000 0.1253.0 $300,000 0.0403.5 $400,000 0.0204.0 $550,000 0.01 Please attach an actual excel file too.arrow_forward
- Burns City may build a garbage incinerator on the outskirts of town. Environmental impact statements and safety planning/inspection will cost $21,000 (payable at start of construction). The annual upkeep and operating costs are expected to be $34,000. The new incinerator will save $14 each annually for 24,000 billed customers. Consultants have estimated an annual disbenefit to the surrounding area of $36,500. At the end of a 10-year useful life the incinerator will be dismantled at a cost of $50,000. Using benefit-cost ratio analysis, and assuming a cost of money of 5% what is the maximum that Burns City can pay to build the incinerator?arrow_forwardThe purchase of a used pick-up truck for $9,000 is being considered. Records for other vehicles show that costs for oil, tires, and repairs roughly equal the cost for fuel. Fuel costs are $990 a year if the truck is driven 16,000 km. The salvage value after five years of use drops by $0.05 per km. Find the equivalent uniform annual cost if the discount rate is 8%. How much does this change if the annual mileage is 24,000 km? 8,000 km? Assume that, drop in Salvage Value is based on total kilometers driven, rather than the annual distance driven.arrow_forwardProblem Statementarrow_forward
- Figures 1 and 2 below show the existing cross sections at station 0+00 and 1+00. Figure 3 shows the cross section of the proposed roadway for the same two stations. These cross sections are essentially the “before and after” shots of the road. Please answer all of the following questions. a. Draw an overlay of the before and after section (use a full size sheet of engineering paper) for both Stations 0+00 and 1+00. b. Calculate the necessary cut and fill end areas at both stations. (Units of Sq Ft) c. Calculate the volume of the cut and fill for the roadway section between these two stations. (Units of BCY) d. Is there enough material to construct the road? Why or why not? e. What would happen if there is any excess material? f. What would happen if there is not have enough material?arrow_forwardA local government is considering promoting tourism in the city. It will cost$8,000 to develop a plan.111e anticipated annual benefits and costs are as follows:Annual benefits: Increased local income and tax collections $ 125,000Annual support service: Parking lot expansion, restroom. $50,000the patrol car, and street repairIf the city government uses a discount rate of 8% and a study period of fiveyears. is this tourism project justifiable according to the benefit-cost analysis?arrow_forward4arrow_forward
- The state of Glottamora has $300 million remaining in its budget for the current year. One alternative is to give Glottamorans a one-time tax rebate. Alternatively, two proposals have been made for state expenditures of these funds. The first proposed project is to invest in a new power plant, costing $300 million and having an expected useful life of 20 years. Projected benefits of the new power plant are as follows: Years Benefits per Year ($ Millions) 1 - 5 0 6 - 20 60 The second alternative is to undertake a job retraining program, also costing $100 million and generating the following benefits: Years Benefits per Year ($ Millions) 1 - 5 60 6 - 10 42 11 - 20 12 The state Power Department argues that a 5 percent discount factor should be used in evaluating the projects because that is the government’s borrowing rate. The Human Resources Department suggests using a 12 percent rate because that more nearly equals society’s true…arrow_forwardANSWER WHAT IS ASKED ON THE PROBLEM AND WRITE YOUR SOLUTION CLEARLY ON A CLEAN PAPER. BOX YOUR FINAL ANSWERarrow_forwardCar A costs $800 more than Car B, but it consumes 0.035 gallons/mile versus 0.06 gallons/mile for Car B. Both vehicles last 10 years and B's salvage value is $175 smaller than A's. Fuel costs $2.30/gallon. Other things being equal, beyond how many miles of use per year (x) does A become preferable to B?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Principles of Economics (12th Edition)EconomicsISBN:9780134078779Author:Karl E. Case, Ray C. Fair, Sharon E. OsterPublisher:PEARSONEngineering Economy (17th Edition)EconomicsISBN:9780134870069Author:William G. Sullivan, Elin M. Wicks, C. Patrick KoellingPublisher:PEARSON
- Principles of Economics (MindTap Course List)EconomicsISBN:9781305585126Author:N. Gregory MankiwPublisher:Cengage LearningManagerial Economics: A Problem Solving ApproachEconomicsISBN:9781337106665Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike ShorPublisher:Cengage LearningManagerial Economics & Business Strategy (Mcgraw-...EconomicsISBN:9781259290619Author:Michael Baye, Jeff PrincePublisher:McGraw-Hill Education
Principles of Economics (12th Edition)
Economics
ISBN:9780134078779
Author:Karl E. Case, Ray C. Fair, Sharon E. Oster
Publisher:PEARSON
Engineering Economy (17th Edition)
Economics
ISBN:9780134870069
Author:William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher:PEARSON
Principles of Economics (MindTap Course List)
Economics
ISBN:9781305585126
Author:N. Gregory Mankiw
Publisher:Cengage Learning
Managerial Economics: A Problem Solving Approach
Economics
ISBN:9781337106665
Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:Cengage Learning
Managerial Economics & Business Strategy (Mcgraw-...
Economics
ISBN:9781259290619
Author:Michael Baye, Jeff Prince
Publisher:McGraw-Hill Education