Concept explainers
(a)
Perform the mathematical operation of
(a)

Answer to Problem 25P
The mathematical operation
Explanation of Solution
Given data:
Calculation:
To find
Refer to the Figure 1:
First type the appropriate characters and values in the Excel sheet. In the cell A6, type the operation as “
Likewise select by using left mouse button, pick cells from B5 through D7 and click in the formula bar, then holding down the ctrl and the Shift Key, press the Enter key. Thus, the result is obtained as shown in Figure 2.
Conclusion:
Hence, the mathematical operation
(b)
Perform the mathematical operation of
(b)

Answer to Problem 25P
The mathematical operation
Explanation of Solution
Given data:
Calculation:
To find
Refer to the Figure 3:
First type the appropriate characters and values in the Excel sheet. In the cell A7, type the operation as “
Likewise select by using left mouse button, pick cells from B6 through D8 and click in the formula bar, then holding down the ctrl and the Shift Key, press the Enter key. Thus, the result is obtained as shown in Figure 4.
Conclusion:
Hence, the mathematical operation
(c)
Perform the mathematical operation
(c)

Answer to Problem 25P
The mathematical operation
Explanation of Solution
Given data:
Calculation:
To find
Refer to the Figure 5:
First type the appropriate characters and values in the Excel sheet. In the cell A6, type the operation as “
Likewise select by using left mouse button, pick cells from B5 through D7 and click in the formula bar, then holding down the ctrl and the Shift Key, press the Enter key. Thus, the result is obtained as shown in Figure 6.
Conclusion:
Hence, the mathematical operation
(d)
Perform the mathematical operation of
(d)

Answer to Problem 25P
The mathematical operation
Explanation of Solution
Given data:
Calculation:
To find
Refer to the Figure 7:
First type the appropriate characters and values in the Excel sheet. In the cell A6, type the operation as “
Likewise select by using left mouse button, pick cells from B5 through D7 and click in the formula bar, then holding down the ctrl and the Shift Key, press the Enter key. Thus, the result is obtained as shown in Figure 8.
Conclusion:
Hence, the mathematical operation
(e)
Perform the mathematical operation of
(e)

Answer to Problem 25P
The mathematical operation
Explanation of Solution
Given data:
Calculation:
To find
Refer to the Figure 9:
First type the appropriate characters and values in the Excel sheet. In the cell A6, type the operation as “
Likewise select by using left mouse button, pick cells from B5 through B7 and click in the formula bar, then holding down the ctrl and the Shift Key, press the Enter key. Thus, the result is obtained as shown in Figure 10.
Conclusion:
Hence, the mathematical operation
Want to see more full solutions like this?
Chapter 14 Solutions
Engineering Fundamentals
- 6. A lake with no outlet is fed by a river with a constant flow of 1200 ft3/s. Water evaporates from the surface at a constant rate of 13 ft3/s per square mile of surface area. The surface area varies with the depth h (in feet) as A (square miles) = 4.5 + 5.5h. What is the equilibrium depth of the lake? Below what river discharge (volume flow rate) will the lake dry up?arrow_forwardProblem 5 (A, B, C and D are fixed). Find the reactions at A and D 8 k B 15 ft A -20 ft C 10 ft Darrow_forwardProblem 4 (A, B, E, D and F are all pin connected and C is fixed) Find the reactions at A, D and F 8 m B 6m E 12 kN D F 4 marrow_forward
- Problem 1 (A, C and D are pins) Find the reactions and A, C and D. D 6 m B 12 kN/m 8 m A C 6 marrow_forwardUniform Grade of Pipe Station of Point A is 9+50.00. Elevation Point A = 250.75.Station of Point B is 13+75.00. Elevation Point B = 244.10 1) Calculate flowline of pipe elevations at every 50 ft. interval (Half Station). 2) Tabulate station and elevation for each station like shown on example 3) Draw Sketcharrow_forward40m 150N B 40marrow_forward
- Note: Please accurately answer it!. I'll give it a thumbs up or down based on the answer quality and precision. Question: What is the group name of Sample B in problem 3 from the image?. By also using the ASTM flow chart!. This unit is soil mechanics btwarrow_forwardPick the rural location of a project site in Victoria, and its catchment area-not bigger than 25 sqkm, and given the below information, determine the rainfall intensity for ARI = 5, 50, 100 year storm event. Show all the details of the procedure. Each student must propose different length of streams and elevations. Use fig below as a sample only. Pt. E-ht. 95.0 200m 600m PLD-M. 91.0 300m Pt. C-93.0 300m PL.B-ht. 92.0 PL.F-ht. 96.0 500m Pt. A-M. 91.00 To be deemed satisfactory the solution must include: Q.F1.1.Choice of catchment location Q.F1.2. A sketch displaying length of stream and elevation Q.F1.3. Catchment's IFD obtained from the Buro of Metheorology for specified ARI Q.F1.4.Calculation of the time of concentration-this must include a detailed determination of the equivalent slope. Q.F1.5.Use must be made of the Bransby-Williams method for the determination of the equivalent slope. Q.F1.6.The graphical display of the estimation of intensities for ARI 5,50, 100 must be shown.arrow_forwardQUANTITY SURVEYINGarrow_forward
- Engineering Fundamentals: An Introduction to Engi...Civil EngineeringISBN:9781305084766Author:Saeed MoaveniPublisher:Cengage LearningFundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,