Chapter 14, Problem 14.22Q
To determine
The conditions under which a site analysis plan is required.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
List 4 features that should be indicated on a construction site plan.
Make an on-line research on construction site planning and prepare a typical layout of a construction site plan identifying the different features of the plan.
Why is the Resident Project Representative required to submit sketches along with the Report of Field Correction?
Chapter 14 Solutions
Architectural Drafting and Design (MindTap Course List)
Ch. 14 - Prob. 14.1QCh. 14 - Prob. 14.2QCh. 14 - Prob. 14.3QCh. 14 - Prob. 14.4QCh. 14 - Prob. 14.5QCh. 14 - Prob. 14.6QCh. 14 - Prob. 14.7QCh. 14 - Prob. 14.8QCh. 14 - Prob. 14.9QCh. 14 - Prob. 14.10Q
Ch. 14 - Prob. 14.11QCh. 14 - Prob. 14.12QCh. 14 - Prob. 14.13QCh. 14 - Prob. 14.14QCh. 14 - Prob. 14.15QCh. 14 - Prob. 14.16QCh. 14 - Prob. 14.17QCh. 14 - Prob. 14.18QCh. 14 - Prob. 14.19QCh. 14 - Prob. 14.20QCh. 14 - Prob. 14.21QCh. 14 - Prob. 14.22QCh. 14 - Prob. 14.23QCh. 14 - Prob. 14.24QCh. 14 - Prob. 14.25QCh. 14 - Prob. 14.26QCh. 14 - Prob. 14.27QCh. 14 - Prob. 14.28QCh. 14 - Prob. 14.29QCh. 14 - Prob. 14.30QCh. 14 - Prob. 14.31QCh. 14 - Prob. 14.32QCh. 14 - Prob. 14.33QCh. 14 - Prob. 14.34QCh. 14 - Prob. 14.35QCh. 14 - Prob. 14.2PCh. 14 - Prob. 14.3PCh. 14 - Prob. 14.4PCh. 14 - Prob. 14.5PCh. 14 - Prob. 14.6PCh. 14 - Grading plan requirements.Ch. 14 - Prob. 14.8PCh. 14 - Prob. 14.9PCh. 14 - Prob. 14.10PCh. 14 - Prob. 14.11PCh. 14 - Prob. 14.12PCh. 14 - Prob. 14.13PCh. 14 - Prob. 14.14PCh. 14 - Prob. 14.15PCh. 14 - Prob. 14.16PCh. 14 - Prob. 14.17P
Knowledge Booster
Similar questions
- In the initial stage of building surveying, the other essential element of the preliminary part of a survey is to quickly become familiar with the extent of the buildings and site. A good method of achieving all of these objectives are focus, familiarity and freedom. It is to carry out a measured survey of the plot and building’s footprint and on the plan to plot a sketch construction site plan. This is all essential information that needs to be recorded during the inspection. Surveyor should be aware of the extent of the site and buildings, and hopefully be concentrating fully on the survey and therefore the height of point of a bench mark (BM) need to be transferred to the building site using levelling survey method. Analyse your findings using the height of collimation method from the levelling survey data in Figure Q1 which starts from BM1 and ends at point J.arrow_forwardGive a detailed explanation and steps of the methodology of lot area sketch plan preparation.arrow_forwardCan the differing site conditions create disputes?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Architectural Drafting and Design (MindTap Course...Civil EngineeringISBN:9781285165738Author:Alan Jefferis, David A. Madsen, David P. MadsenPublisher:Cengage LearningFundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,Construction Materials, Methods and Techniques (M...Civil EngineeringISBN:9781305086272Author:William P. Spence, Eva KultermannPublisher:Cengage Learning
Architectural Drafting and Design (MindTap Course...
Civil Engineering
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Cengage Learning
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,
Construction Materials, Methods and Techniques (M...
Civil Engineering
ISBN:9781305086272
Author:William P. Spence, Eva Kultermann
Publisher:Cengage Learning