Architectural Drafting and Design (MindTap Course List)
7th Edition
ISBN: 9781285165738
Author: Alan Jefferis, David A. Madsen, David P. Madsen
Publisher: Cengage Learning
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 14, Problem 14.17Q
To determine
The partial legal description of the farthest corner of NW from the specified plan.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Subdivide the lot into 2 equal parts. *Reference Course #2… bounded and described as follows:A parcel of land (Lot 8-E of the subd., plan Pad-03-004697, being a portion of lot 8, (LRC) Pcs25914, LRC Rec, No.), situated in the Mun. of Balanga, Province of Bataan. Bounded on the E., along line 1-2 by lot 8-D of the subd. Plan; on the S., along line 2-3 by lot 9; on the W., NW., and N., along lines 3-4-5-1 by (Road) lot 4, (LRC) Pcs-25914. Beginning at a pt. marked “1” on plan, being N. 27 deg. 42’ W., 424.58m from B.B.M. 8, Balanga Cad.; thence S. 6 deg, 07’E., 15.03m. to pt. 2; thence S. 81 deg. 00’W, 25.57m. to pt. 3; thence N. 1 deg. 38’ W., 5.54m. to pt. 4; thence N. 42 deg. 55’ E., 16.36m. to pt. 5; thence N. 83 deg. 34’ E., 12.75m. to the pt. of beginning; containing an area of THREE HUNDRED TWENTY SEVEN (327) SQUARE METERS. All pts. Referred to are indicated on the plan and are marked on the ground as follows: pts. 1 & 2 by P.S. Cyl. Conc. Mons.; and the rest by Old P.S.…
Part of the Northwest Quarter of the Southwest Quarter of Fractional Section Twenty-seven (27), Township Two (2) North, Range Eleven (11) West, Vincennes Township, Knox County, Indiana described as follows: Beginning at the Southwest corner of said quarter-quarter section; thence East 294 Feet; thence North 215 feet thence West 294 feet; then south 215 feet along the West line of said Section 27 to the place of beginning and containing 1.45 acres more or less is an example of what property description
10. A deed describes a trapezoid shaped parcel, but is missing the last call to the point of beginning.
The calls for the deed (in order) are as follows: South 41 degrees East 20.65 chains; North 79
degrees East 12.16 chains; North 55 degrees West 20.76 chains. What would the missing
bearing and distance likely be and what is the area of the tract?
Chapter 14 Solutions
Architectural Drafting and Design (MindTap Course List)
Ch. 14 - Prob. 14.1QCh. 14 - Prob. 14.2QCh. 14 - Prob. 14.3QCh. 14 - Prob. 14.4QCh. 14 - Prob. 14.5QCh. 14 - Prob. 14.6QCh. 14 - Prob. 14.7QCh. 14 - Prob. 14.8QCh. 14 - Prob. 14.9QCh. 14 - Prob. 14.10Q
Ch. 14 - Prob. 14.11QCh. 14 - Prob. 14.12QCh. 14 - Prob. 14.13QCh. 14 - Prob. 14.14QCh. 14 - Prob. 14.15QCh. 14 - Prob. 14.16QCh. 14 - Prob. 14.17QCh. 14 - Prob. 14.18QCh. 14 - Prob. 14.19QCh. 14 - Prob. 14.20QCh. 14 - Prob. 14.21QCh. 14 - Prob. 14.22QCh. 14 - Prob. 14.23QCh. 14 - Prob. 14.24QCh. 14 - Prob. 14.25QCh. 14 - Prob. 14.26QCh. 14 - Prob. 14.27QCh. 14 - Prob. 14.28QCh. 14 - Prob. 14.29QCh. 14 - Prob. 14.30QCh. 14 - Prob. 14.31QCh. 14 - Prob. 14.32QCh. 14 - Prob. 14.33QCh. 14 - Prob. 14.34QCh. 14 - Prob. 14.35QCh. 14 - Prob. 14.2PCh. 14 - Prob. 14.3PCh. 14 - Prob. 14.4PCh. 14 - Prob. 14.5PCh. 14 - Prob. 14.6PCh. 14 - Grading plan requirements.Ch. 14 - Prob. 14.8PCh. 14 - Prob. 14.9PCh. 14 - Prob. 14.10PCh. 14 - Prob. 14.11PCh. 14 - Prob. 14.12PCh. 14 - Prob. 14.13PCh. 14 - Prob. 14.14PCh. 14 - Prob. 14.15PCh. 14 - Prob. 14.16PCh. 14 - Prob. 14.17P
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- 1. Draw the lot base on the lot description on TCT (Transfer Certificate of Title).2. Calculation of Area by:a. Triangle Methodb. DMD Methodc. DPD Method3. Subdivide the lot into 2 equal parts. *Reference Course #2 … bounded and described as follows:A parcel of land (Lot 8-E of the subd., plan Pad-03-004697, being a portion of lot 8, (LRC) Pcs25914, LRC Rec, No.), situated in the Mun. of Balanga, Province of Bataan. Bounded on the E., along line 1-2 by lot 8-D of the subd. Plan; on the S., along line 2-3 by lot 9; on the W., NW., and N., along lines 3-4-5-1 by (Road) lot 4, (LRC) Pcs-25914. Beginning at a pt. marked “1” on plan, being N. 27 deg. 42’ W., 424.58m from B.B.M. 8, Balanga Cad.; thence S. 6 deg, 07’E., 15.03m. to pt. 2; thence S. 81 deg. 00’W, 25.57m. to pt. 3; thence N. 1 deg. 38’ W., 5.54m. to pt. 4; thence N. 42 deg. 55’ E., 16.36m. to pt. 5; thence N. 83 deg. 34’ E., 12.75m. to the pt. of beginning; containing an area of THREE HUNDRED TWENTY-SEVEN (327) SQUARE METERS.…arrow_forwardList reasonable action(s) that should be taken (regarding the land partitioning & natural resource claimsarrow_forwardI need the answer as soon as possiblearrow_forward
- The listing agent believes the metes and bounds legal description of the property she has listed is incorrect. What action should be taken at this point? The agent should do nothing as this is outside her area of expertise If the agent is knowledgeable, the correction should be made and recorded A surveyor or title attorney should be contacted if any corrections are to be made The agent should contact municipality and make the corrections at the court housearrow_forwardWhat steps in the subdivision of public lands is left to local surveyors?arrow_forwardA vacancy is defined as O a. unsurveyed, unappropriated, public school land O b. unsurveyed, patented, sovereign land O C. unsurveyed, unsold, mineral land O d. surveyed, unsold, school landarrow_forward
- What is a site clearance? What is the purpose of land clearing?arrow_forwardGiven the description of the lot a. Make a sketch of the lot b. Compute the area of the lot c. A dividing line is drawn from corner 5 to midpoint of line 2-3. Determine the bearing and length of the dividing line Line/Course Length Bearing 47° 49'W 1-2 S 2-3 N 28° 16'W 3-4 N 79° 21'E 4-5 S 63° 26'E 5-1 S 06° 44'W 30.48 111.37 29.09 56.68 56.70arrow_forwardThe owner of the lot (details given below) has decided to subdivide his lot into 3 parts. The first dividing line is from C to A and the second is from A to D.arrow_forward
- When preparing a written report (which includes survey report, description, and sketch), the shall be noted which were placed and used for record dignity. O a. boundary lines O b. occupation lines O c. natural features O d. boundary monumentsarrow_forwardWhat are real estate license requirements?arrow_forwardDefine Land Drainage.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Architectural Drafting and Design (MindTap Course...Civil EngineeringISBN:9781285165738Author:Alan Jefferis, David A. Madsen, David P. MadsenPublisher:Cengage Learning
Architectural Drafting and Design (MindTap Course...
Civil Engineering
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Cengage Learning